HomeMy WebLinkAbout05.b. Review Draft Optimizations Program annual report for fiscal years 2022-24Page 1 of 42
Item 5.b.
F__1_448�411C_S0
January 14, 2025
TO: ADMINISTRATION COMMITTEE
FROM: CHRISTINA GEE, MANAGEMENT ANALYST
REVIEWED BY: TEJI O'MALLEY, HUMAN RESOURCES AND ORGANIZATIONAL
DEVELOPMENT MANAGER
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: REVIEW DRAFT OPTIMIZATIONS PROGRAM ANNUAL REPORT FOR
FISCAL YEARS 2022-24
Attached is the draft Optimizations Program Annual Report for FYs 2022-24, detailing optimizations
completed and in progress. The final report will be presented to the full Board.
Strategic Plan re -In
GOAL SEVEN: Innovation and Agility
Strategy 2 - Implement organization -wide optimization
ATTACHMENTS:
1, Draft FYs 2022-24 Optimizations Annual Repor
2. Presentation
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 23 of 66
ATTAMMENT 1
OPTIMIZATIONS
PROGRAM
ANNUAL REPORT
Fiscal Years 22-24
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 24 of 66
Page 3 of 42
STAYING AHEAD
OF THE GAME
A MESSAGE FROM THE GENERAL MANAGER
This past summer, the San Francisco Bay Regional Water Quality Control Board
introduced new regulations requiring all Bay Area wastewater agencies to reduce
nitrogen discharges by 40% from 2022 levels within a decade. Meeting this goal
will be no small feat; it will require the largest combined public investment in
treatment upgrades across our region since the passage of the Clean Water Act in
1972.
Luckily, Central San has been focusing on optimizing our operations toward cost
efficiency for many years, and we've set a standard for employees across the
organization to devise creative cost savings to pass along to our customers.
Each of the optimizations in this report has helped us become an innovative
industry leader with a focus on continuous improvement, to constantly push
ourselves to think of new ways to be of better service to our stakeholders.
Our report begins with the winners and featured projects at our two most recent
Innovations Fairs. At these annual events, we continue to celebrate and share
stories of innovation at Central San. These projects, as well as the others in this
report, are just a representation of the ingenuity, collaboration, and hard work
that our highly skilled staff exhibit every day.
I want to say thank you to the many individuals and workgroups who embrace
futuristic thinking and innovations, and to our leadership team and Board for their
support in these efforts.
X
.n � In M I
GENERAL MANAGER
Roger S. Bailey
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 25 of 66
ABOUT CENTRAL SAN
Page 4 of 42
Established in 1946, Central San is a special
district which collects and cleans more than
13 billion gallons of wastewater per year for
nearly 500,000 residents and more than
15,000 businesses on over 3,000 parcels in
central Contra Costa County. It is
headquartered in Martinez, California,
approximately 30 miles east of San
Francisco.
Central San serves the communities
pictured in the service area map on the
right. Central San operates and maintains
about 1,540 miles of sewer pipelines and
cleans more than 13 billion gallons of
wastewater each year.
Central San has 303 budgeted full-time
employees led by a General Manager, a
Deputy General Manager, two Department
Directors, and 13 Division Managers.
ENVIRONMENTAL STEWARDSHIP
Since 1997, Central San has operated a
Household Hazardous Waste Collection
Facility (HHWCF) that serves approximately
24,000 residential and small business
customers, keeping more than 1.8 million
(M) pounds of hazardous waste per year
out of landfills and waterways.
Concord
Pleasant Hill
Clayton
Walnut Creek
Orinda
Lafayette
Moraga
Oakland
Danville
a
❑ Headquarters, Treatment Plant, HHW
Collection Facility
p Collection Systems Operation (Sewer
Maintenance)
0 Wastewater Collection and Treatment;
HHW Collection
Wastewater Treatment and HHW
Collection
HHW Collection Only
San Ramon
°2 AMEEK== Miles
Central San also operates a Residential Recycled Water Fill Station to provide customers with
recycled water at no additional charge. Through the fill station and the Recycled Water Program,
Central San distributes about 250M gallons of recycled water each year to help augment the
potable water supply in the service area.
GUIDED BY A STRATEGIC PLAN
Every two years, Central San adopts a Strategic Plan as a roadmap to
accomplish the goals set by the Board of Directors, reflecting the
priorities and practices for the following two years.
The FY 2022-24 Strategic Plan includes Goal 7 - INNOVATION AND AGILITY.
In tandem with the annual Optimizations Program Annual Reports, the
Strategic Plan Goal 7 Key Success Measures and Key Metrics help track
progress in innovations and optimizations across Central San.
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 26 of 66
Page 5 of 42
MISSION
To protect public health
and the environment
.................................
VISION
To be an innovative
industry leader in
environmental stewardship
and sustainability, while
delivering exceptional
service at responsible
rates.
.■ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
VALUES
Our core values guide our
daily decisions and how we
fulfill our mission, vision, and
goals.
CUSTOMER SERVICE
We are responsive to our
customers, and we deliver on our
commitment to provide safe,
reliable, and cost-efficient services.
EMPLOYEES
We empower our employees to do
their best work.
INTEGRITY
We hold ourselves accountable to a
high standard of honesty, reliability,
and transparency.
STRATEM-w?'. _
GOALS
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
ENVIRONMENTAL
SUSTAI NABI LITY
We conduct our business to
safeguard and improve our planet.
DIVERSITY, EQUITY,
AND INCLUSION
We value people of all
INNOVATION backgrounds, cultures, and
perspectives, and we are
We continuously improve and committed to the principles of
optimize our operations. equity and inclusion.
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 27 of 66
Page 6 of 42
v r JL
:ti �- � ` jjjjjjffffff � I- � I�rr
F
L-
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 28 of 66
Page 7 of 42
This report provides the status of optimizations completed and in progress
between July 1, 2022 and June 30, 2024.
Optimizations can increase efficiency and effectiveness, improve customer service,
save time and/or money, add redundancies, improve safety, leverage data for smart
decision making, and innovate new ways of doing business.
The optimizations in this report are categorized by type, as shown below.
Table of Contents
INNOVATIONS FAIRS....................................................................................................................2
ADMINISTRATIVE..........................................................................................................................8
CUSTOMERSERVICE.................................................................................................................13
OPERATIONAL...........................................................................................................................15
DATA ANALYTICS AND VISUALIZATION........................................................................................19
PLANT MAINTENANCE...............................................................................................................22
ACRONYMS...............................................................................................................................30
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 29 of 66
S ..
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 8 of 42
FYs 22-24 Optimizations Program Annual Report
-�� s•.r a. F Mail
INNOVATIONS FAIRS
At our yearly Employee Appreciation Event, Central San holds an Innovations Fair to
recognize and reward our staff's creativity and hard work. The following are the 2023
and 2024 featured innovations and winners of Innovation of the Year — as crowned by
popular vote.
2023 INNOVATIONS FAIR
0R4':,qLL_
signals. T
away from
12 INNOVATION OF THE YEAR: Permanently
Mounted GPS Base Station (completed)
Project Team: Greg St. John (Survey), Kelly Weir (Survey),
Chris Pentes (Survey), Nate Hill (Electrical Shop), Mark
Turner (Electrical Shop), Josh Powell (Machine Shop), Jason
DeGroot (Collection System Operations (CSO)), and Jose
Vega (Information Technology (IT))
The Collection Systems Renovation program requires a lot
of detailed land surveying to derive elevations, identify
potential conflicting utilities, and map data that serves as a
base for engineering design. The new permanently mounted
GPS base station allows staff to work more effectively near
large buildings and under tree canopies that can block GPS
hese signal upgrades, the hardware, and the software will shift our program
conventional, tedious total station surveying.
For example, staff used to use 90% total station and 10% GPS to complete their
surveying; they can now use 90% GPS and 10% total station. This will allow Central
San to survey more linear footage and will also be accessible to our consultants. The
results have had the added advantage of getting all the projects on an identical
coordinate system, avoiding time-consuming project -specific "control" surveys. The
survey measurements will both be more consistent and more accurate than yesterday's
GPS surveying, allowing staff to work in places that weren't previously possible with this
equipment.
2
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 30 of 66
sD
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 9 of 42
FYs 22-24 Optimizations Program Annual Report
FEATURED INNOVATION: Household Hazardous
Waste Collection Facility and Residential Recycled
Water Fill Station Visitor Electronic Scanning
(completed)
Project Team: DmitryAbramov (IT), Dennis Chebotarev (IT),
Winston Ingram (HHW), and Dave Wyatt (HHW)
In FY 23-24, Household Hazardous Waste staff oversaw approximately 56,000 visitors
to the Household Hazardous Waste Collection Facility (HHWCF) and Residential
Recycled Water Fill Station. To help serve this high volume of customers more
efficiently, staff researched and implemented a handheld device to use in processing
customers and collecting visitor information electronically. With the device, staff can
scan the driver's license of a customer through a car window — improving comfort and
safety — and can process customers quicker, without having to go back and forth with a
tablet as they had in the past. The device also allows for speech -to -text entry and
picture attachments, and automatically detects out of service area zip codes, thereby
helping new staff members know when customer is not from service area.
3
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 31 of 66
Page 10 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
FEATURED INNOVATION: Oracle Cloud Enterprise Performance
Management (EPM) for Capital Reporting (completed)
Project Team: Heather Ramamurthy (IT), Amal Lyon (Finance), Olivia Ruiz (Finance),
and Kevin Mizuno (Finance)
Oracle EPM cloud planning was implemented to prepare the annual Operations &
Maintenance (O&M) Budget, and staff needed something comparable for capital
reporting, to revamp their reliance on spreadsheets and time-consuming manual
processes in preparing the annual Capital Improvement Budget (CIB) and 10-year
Capital Improvement Plan (CIP). EPM for Capital improved interdivisional collaboration
with simplified monthly reporting, reduced administrative burdens, and produced more
transparent data on capital projects. It helped Capital Projects, Planning, and Finance
track fiscal year-end accruals to help us foresee and manage cash flow impacts,
ensuring optimal rates for our customers.
FEATURED INNOVATION: Go With the
Flow Bike Tours (completed)
Project Team: Ben Lavender (Communications),
Khae Bohan (Geographic Information Systems
(GIS)/Asset Management), Rebecca Polcyn
(Communications), and Ian Morales (GIS/Asset
Management)
For 21 miles, the Iron Horse Trail pedestrian and
bicycling path follows one of Central San's
sewer lines - nearly the entirety of the flow from
the southeastern -most corner of our service
area in San Ramon all the way to our treatment
plant in Martinez. Staff began holding periodic
public guided tours to bike, skate, rollerblade,
etc. along the path.
In addition, to help our customers see (and
sometimes hear) the flow of wastewater along
this path, we built a Story Map that follows the
Iron Horse Trail and the wastewater infrastructure along the way. Using the interactive
map, customers can view prominent access covers, convenient entry points to the trail,
and information about what's happening just below ground. By following the map, our
customers can walk, bike, or run the path of wastewater on their own from their home,
school, office, all the way to our treatment plant.
2
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 32 of 66
M S '
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 11 of 42
FYs 22-24 Optimizations Program Annual Report
2024 INNOVATIONS FAIR
12 INNOVATION OF THE YEAR: Membrane Aerated Biofilm
Reactor (MABR) Pilot Phase 1 (completed)
Project Team: Michael Cunningham (Optimization), Mike
Zubrzycki (Capital Projects), William Grant (Capital Projects), Joey
Gois (Mechanical Shop), Mike Matthews (GIS/Asset
Management), Nitin Goel (Optimization), Blake Brown (Lab), Brent
Harvey (Lab), Jesse McDermott (Lab), Tristan Kimball
(Optimization), Denys Chaus (Optimization), Brianna Bansraj
(Optimization)
The groundbreaking MABR pilot project tested
nitrogen removal using Central San's existing
secondary treatment process and a novel
treatment process intensification technology,
MABR. The existing secondary process has a
short solids retention time (SRT). Increasing the
SRT (i.e., age and concentration of bacteria in the
tank) would traditionally require new tankage to be
constructed. Theoretically, the MABR process
could intensify the existing secondary process by
providing a place for nitrogen removing bacteria to live without having to increase the
SRT.
Initial results have shown it is possible to remove nitrogen through the MABR
intensification technology with mixed liquor from the existing secondary treatment
process. This could potentially help avoid hundreds of millions of dollars in the
construction of new tanks. Instead, we could retrofit existing tankage to include this
energy efficient technology. Phase 2 and 3 in progress are testing different pilot feed
locations within the existing secondary treatment process, and initial results are
promising.
Many existing staff members have been involved in the day-to-day operation and
maintenance of the pilot project. By leveraging existing staff resources, we avoided the
significant costs of full-time contractor operators and external laboratory services.
5
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 33 of 66
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 12 of 42
FYs 22-24 Optimizations Program Annual Report
FEATURED INNOVATION: In/Out Board
for Capital Projects (completed)
Project Team: Dmitry Abramov (/T), Lela Joya
(Capital Projects)
The Interactive In/Out Board is a modern system
designed to streamline employee status tracking. It
features a user-friendly interface for easy updates,
real-time synchronization, and remote accessibility
via multiple devices (e.g., a television screen, Teams Client Integration, and/or web
interface). The board supports detailed status options and offers various features, like
status schedules, and Outlook calendar synchronization. It is cloud -based for seamless
updates. This innovative tool makes it easier to manage and communicate employee
availability, location (e.g., office, field, teleworking, out of the office), and ultimately
enhances organizational productivity.
FEATURED INNOVATION: CSO Training Vault
(completed)
Project Team: Alex Benavidez (CSO), Shane McElley
(CSO), Russell Salva (CSO), Jason DeGroot (CSO)
CSO now has an in-house training tool to demonstrate how
pipeline cleaning tools work. The CSO Training Vault —
designed and constructed by staff — provides hands-on
training using tools in the Rodding, Hydro, CCTV, and
Locating sections and helps staff learn, repeat, and master
sewer maintenance best practices in a controlled
environment. With this interactive training module, staff
learns everything from safety protocols to advanced
cleaning techniques without the risk of real -world accidents.
The vault contributes to delivering first-class sewer
maintenance, continuing our exceptional reputation and client satisfaction, all while
operating safely and efficiently.
[.
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 34 of 66
Page 13 of 42
�CENTRALSAN FYs 22-24 Optimizations Program Annual Report
FEATURED INNOVATION: Steam and Aeration Blower Renovations
(completed)
Project Team: Nancy Molina (Capital Projects), Nate Hodges (Capital Projects), Parker
Ewing (Capital Projects)
This year, Central San renovated the steam and aeration blower operational process to
increase reliability in the event the steam driven aeration turbines are unavailable.
Central San installed three high speed (13,000 rpm) 1 MW magnetic bearing electric
blowers, providing firm aeration capacity, and demonstrating that a steam -driven blower
and electric blower could operate in tandem.
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 35 of 66
Page 14 of 42
,&11% FYs 22-24 Optimizations Program Annual Report
ADMINISTRATIVE
The optimizations in this section make administrative processes more efficient and
effective, improving the way we conduct business.
Intranet Redesign (completed)
Our San Central intranet site was given a
fresh new look to make it more user-friendly
and engaging for all employees. The new
design incorporates a rotating banner and a
scrolling text feed, allowing us to highlight
current news and events more effectively.
Users can add items directly to the text scroll,
and Communication Services can update the
banner items to reflect the latest news. In
addition, the new homepage has a cleaner
and more streamlined design, making it
easier to find what employees need. To ensure that the most frequently searched
information is readily accessible, staff reviewed the top search terms and page visits
from the past year and a half. These links are now prominently featured, so employees
can quickly navigate to the information they need most.
Digitizing District Archive Photos (in progress)
Central San has several thousand print and slide photos that cannot be used as they
are not in a digital format. This optimization sorts through and digitizes all the
appropriate photos for District use and removes the need for hard copy archives. Staff is
systematically evaluating and digitizing photos using a new high -resolution scanner, so
that photos kept can be of the quality needed to be utilized in future communications.
Contract Documents in Laserfiche (in progress)
Since the beginning of the pandemic, all Purchasing contract documents have been
saved to a shared network drive. Limitations with that system affect the naming
structure, accessibility, and the security of these files. These files will be moved into
Laserfiche, providing a secure storage location while also giving District staff the ability
to search and access the contract documentation they are looking for.
Oracle Procurement Specialist (in progress)
Central San has retained a consultant specializing in Oracle procurement and
procurement best practices to perform a review of status quo procurement business
processes and provide recommendations to staff on ways to better utilize the system to
employ functionalities and best practices, particularly as it relates to a potential
transition to encumbrance tracking/reporting in the future. The draft report was received
from the consultant, and staff provided feedback in May/June 2024. Using the revised
report, the goal is to complete the report and provide the Executive Team with an
overview for direction on potential system/process changes by the close of the first
quarter of FY 24-25.
E:3
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 36 of 66
Page 15 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
Risk Management Functional Assessment (in progress)
Central San has retained a consultant for a Risk Management functional assessment to
assess the scope of the function and how the responsibilities can best be executed.
Hazardous Materials Database (completed)
Staff created a new database to automate the tracking of hazardous materials and
locations throughout District facilities. This process was previously handled in a
Microsoft Access database that was not easily searchable or accessible from multiple
locations. The new database is linked from the San Central intranet to make it easy to
find and use, reducing staff time and increasing the accuracy of information.
Asset Barcoding (in progress)
This optimization puts a barcode on assets to streamline work order creations and asset
lookup. For the pilot project, Central San put about 100 barcodes on assets and tested
a new user interface using mobile tablets. Currently, staff is standardizing asset names
and plans on ordering more barcodes.
Recycled Water Inspection Mobile Application (completed)
Staff developed a Recycled Water Inspection mobile application to conduct inventory of
meter, valve, hydrant, and sampling station locations with photos.
,. (110ENTRALSAN
Pryor+ Learning Management System
(in progress)
_V-
For years, there has been a need to track District-
-L E A R N
wide training consistently and in a centralized
place for reporting purposes. In FY 23-24, it was
o�E= ®a ° �m,.am.,,._
-�
brought to staff's attention that several
workgroups were individually using an online
learning platform, Pryor+, to conduct training. After
hearing positive feedback from those users, staff
negotiated with Pryor Learning to offer District-
" ` " x • -� • w ®
wide licenses to the over 5,000 online courses on
Pryor+ as well as unlimited, free attendance at
Pa =e
m®
select in -person seminars. In addition to this
-'�`��mm°°`%'°• s "°""-
variety of learning opportunities, Pryor Learning
offers the ability to track and report on usage. This
year -long pilot partnership launched with District -
wide training at the end of October 2024. Staff will collect feedback and assess usage to
determine the path forward at the close
of the trial period.
Online Permit Reporting (in progress)
Staff continues to explore the feasibility of moving some of the Environmental
Compliance permit reporting to an online system that complies with the Environmental
Protection Agency (EPA)'s Cross -Media Electronic Reporting Rule (CROMERR). Staff is
working through regulatory requirements and the EPA CROMERR application process.
The application packet will be sent to the EPA in the first quarter of FY 24-25.
0
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 37 of 66
Page 16 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
Oracle Permitting and Licensing (OPAL) (in progress)
Staff is working on modernizing the permitting system and migrating it from the legacy
SunGard system, which was dated and inefficient. OPAL, a beta tested software, was
selected to interface with the Oracle enterprise resource planning (ERP) software.
Central San is testing it and helping Oracle improve its software for marketability and
usability. The Permit Counter went live with OPAL on February 1, 2024. Staff is entering
permit data, with the online permitting portal not anticipated to go live until 2025. Oracle
has assigned a larger team to work out the bugs and performance issues that have
developed after going live. Staff is continuing to hold weekly meetings with Oracle and
testing patches while also working in the environment.
Using Oracle to Develop CIB/CIP Section of Budget Book (in progress)
Central San is optimizing Oracle -integrated Enterprise Performance Management
(EPM) technology to improve the transparency, collaboration, effectiveness of the
CIB/CIP administration and reporting process, particularly as it relates to managing
growing capital spend carryforward. Assessing optimal use of Oracle EPM versus
Project Portfolio Management (PPM) is also a key goal of the project to maximize
usefulness of project budgeting for different stakeholders' (e.g., project managers
versus division managers) varying needs. Capital Projects, Finance, and Planning staff
have worked together to develop a draft IT charter. The goal is for the EPM
implementation to be final by the close of FY 24-25 to develop the FY 25-26 CIB and
necessary updates to CIP.
Lab Cityworks Implementation (in progress)
Staff is in the process of adding Lab tasks and
data into our computerized maintenance
management system, Cityworks. Once
integrated, staff will be able to place records
of maintenance and repair for lab equipment,
schedule routine maintenance and calibration
and receive notification when something is
due, automatically run an annual maintenance
report for each piece of equipment/instrument,
and link equipment manuals from Laserfiche.
ProCore Construction Management Software (in progress)
Capital Projects project managers are pilot testing ProCore construction management
software through outside partners for potential purchase and implementation in our
internal systems.
Performance Appraisal Process (in progress) /
Oracle Goals and Performance Module (in progress)
The Goals and Performance module in Central San's Oracle ERP can allow staff to
conduct performance appraisals electronically. The module has been configured and
draft standard operating procedures (SOPs) are being piloted by staff. Using the
feedback, staff will continue to assess whether the system works and whether using it
would represent an efficiency gain versus the current manual process. In the meantime,
10
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 38 of 66
Page 17 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
staff rolled out updated appraisal forms in paper hard copy format in November 2024 —
with increased employee engagement through self -assessments, improved rating
scales, clearer competencies, and more focus on career coaching.
Records Retention Schedule (in progress)
With the help of legal counsel, staff is working on optimizing and simplifying Central
San's Records Retention Schedule. This will reduce the number of paper copies and
boxes stored in facilities off -site.
Agenda Management System (in progress)
An upgrade to a new agenda management system will help with the process of creating
Board and Committee agendas. Staff is working on rolling it out.
IT Disaster Recovery Plan (completed)
Central San completed the following innovations related to the IT Disaster Recovery
Plan:
Implemented ExaGrid to protect backups from ransomware
Migrated pump stations to a new AT&T fiber network
Enhanced cybersecurity with PhishER, Arctic Wolf, Darktrace, and CrowdStrike.
New IT Business Workflow Procedures (completed and in progress)
Central San created the following new workflows:
• Introduced a 90-Day Retention Policy for Teams Messaging
• Developed a Backup Retention policy
• Implemented Administrative Assets Tracking system
• Began phase 2 improvements to the Permitting system.
Formation of Northern California Sanitation Agencies Financing Authority
(in progress)
There is a need for about $200 million of additional external financing for Central San's
ten-year Capital Improvement Program. External financing may come in the form of
State Revolving Fund (SRF) loans, or debt issued to the public in the form of
Certificates of Participation (COPs), or revenue bonds. Staff is looking for the most cost-
effective form of financing, which could include revenue bonds. Revenue bonds are a
very standard form of municipal financing, especially for utilities. However, revenue
bonds for special districts in California can only be used for new money (as opposed to
refinancing existing debt) through a public vote. Being part of a joint powers authority
(JPA) allows for the issuance of revenue bonds as a form of financing. Revenue bonds
issued through a JPA, on behalf of a participant already in the JPA, do not require a
public vote. Accordingly, that arrangement achieves the same outcome as a COP
structure, but through a "more standard" structure.
Establishing a JPA requires at least one other government entity to join in the effort. The
costs of forming a JPA are minimal and include legal costs to specify formation and
governance documents, and then filing fees with the State. Ongoing costs are minimal,
and comparable to those involved in maintaining an entity like Central San's existing
facilities financing authority used for COPs.
11
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 39 of 66
Page 18 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
In-house Treasury Function (in progress)
The District has been transitioning to an in-house treasury function, which is targeted for
finalization in early FY 24-25. An internal audit conducted on Accounts Payable
processes found operational inefficiencies associated with Central San's long-standing
treasury structure. In addition, the non -industry standard treasury arrangement does not
allow implementation of modern ERP and banking technology solutions offered by
Central San's new Oracle Fusion Cloud ERP system. Due to the County's strict
deadlines, policies, and procedures to ensure the security of funds held in the pool and
the accuracy of the underlying financial records, daily treasury related tasks come with
administrative challenges. Over the years, County staff have made several process and
policy accommodations and have been helpful and responsive to Central San staff.
To consider alternate options, staff conducted an interagency survey which found
evidence that it is not typical for an agency of Central San's size that operates
autonomously to bank and invest with their county. Staff also weighed the pros and cons
associated with alternative investment management options, as well as Treasurer
appointment options. Staff has concluded that implementing a more traditional banking
arrangement will return more control back to Central San, allowing staff to more quickly
respond to a dynamic environment, implement ERP process optimizations, and
ultimately improve the speed and accuracy of record keeping and reporting, all the while
maintaining simpler and effective internal controls.
During FY 22-23, staff provided an initial assessment of status quo treasury structure
challenges and received Board direction to investigate the matter further and return with
the following: a specific recommendation for the preferred treasury structure (i.e., who to
be appointed as Treasurer, investment management approach, etc.), a risk assessment
of the to -be treasury internal control environment, and draft policies and procedures.
Additionally, a consultant was contracted to help manage the project through
completion.
During FY 23-24, key milestones completed included the following: Board appointment
of an in-house Treasurer and approval of a Cash Management & Banking policy;
issuance of a banking Request for Proposal (RFP) and Board approval of a contract
with US Bank banking services in March 2024; issuance of an investment management
services RFP; and Finance Committee support to execute a contract with PFMAM in
June 2024. Ongoing key work will involve the following: Enterprise Resource Planning
(ERP)/banking system testing and implementation, contract negotiation and execution
for US Bank custodial services, US Bank merchant card services (Elavon), and PFMAM
investment management services. The transition will be followed by post -
implementation monitoring, troubleshooting and enhancements expected over the
ensuing three to six months.
12
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 40 of 66
Page 19 of 42
�CENTRALSAN FYs 22-24 Optimizations Program Annual Report
CUSTOMER SERVICE
The optimizations in this section help us serve our customers better by providing
information and resources.
Central San Home Guide (completed)
The Home Guide includes a variety of important information for
our customers on private sewer laterals, overflow protection
devices, hiring a sewer contractor, easements, and accessory
dwelling units, as well as HHW and other services we provide.
Our customers often have questions on these topics, so, by
bringing this information together in one place, the Home Guide
will serve as a positive reminder and helpful reference for them.
The guide was mailed to homeowners and is posted online and
at the Permit Counter.
Development Services Website Update
and Development of New Permit FAQ's
(completed)
Central San's website was upgraded more MEWS Frequently Asked Questions
than six years ago and most of the content �m"�°°'�°°"�`°""
waxy anm,y —d sews, F p+
was transferred. However, new content is 5,,-N-Enad;,„o, o
needed to clarify permit and recycled water w;°';°.E... ;- o
Eos¢orenb&ftkl ViQ,'
requirements, update reports and fee studies, El."4�;W6 5aN �p„o, o
and describe the new financing programs for °-1`°'
Septic 2 Sewer, contractual assessment °IDS.
districts, and lateral replacement. These
changes provide necessary information for customers to participate in the programs and
saves staff time in answering calls. In FY 23-24, the Permits, Fees, and Recycled Water
web pages were all overhauled and new content was uploaded, including FAQs for
permitting.
Electronic Posting Board (in progress)
Staff is working on obtaining an electronic posting board for agendas and notices which
will work concurrently with the agenda management system. Once live, staff will be able
to post to the board from anywhere. Staff is currently researching companies.
op-P.1`7
If {a'4Fels°.Kuhl
CENTS-N 00 NTRA 00S 1an++
,®i NextRequest for Management of
13
Public Records Requests (completed)
Central San now uses an online, cloud -
based platform called NextRequest for
the management of Public Records
Requests. To optimize Central San's
response to requests, this application
offers the following features- a single
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 41 of 66
Page 20 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
repository with unlimited file size and comprehensive tracking capabilities for all
communications and documents related to requests (meaning no more emails,
attachments, SharePoint folders, Excel spreadsheets, etc.); in-app redaction capability
that ensures confidentiality and safety of personally identifiable information; simplified
and improved accessibility for all requesters via an online portal, with enhanced ability
to connect them with self-service information; and robust reporting capabilities that
define what is being requested, by whom, and how Central San responds.
14
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 42 of 66
Page 21 of 42
,&11% FYs 22-24 Optimizations Program Annual Report
OPERATIONAL
The optimizations in this section improve our plant operations by increasing
redundancy, optimizing performance, saving money, and more.
Optimized Secondary Process Performance during Aeration Basin Diffuser
Replacement Project Construction (in progress)
Through a joint effort among Operations, Optimization, and Capital Projects staff,
Central San has achieved stable and high -quality secondary process effluent while
significant amounts of equipment are out of service for the diffuser replacement.
Initiatives included a data dashboard to help review key process performance indicators
and temporary flow meters to help distribute flow to each set of clarifiers. The existing
secondary process optimization is complete, and the system is performing well during
the construction of Tank 1A/1 B. Further improvements will occur after completion of the
diffuser replacement capital project.
Secondary Clarifier Optimization (in progress)
Staff is identifying and evaluating improvements to the secondary clarifier hydraulic
capacity and process performance, as well as equipment optimizations to improve
operations and maintainability, through the Secondary Clarifier and Channel
Improvements design. In FY 23-24, staff completed clarifier performance testing and is
in the process of evaluating various optimization alternatives in parallel with final design.
Odor Control Optimization (in progress)
Staff is developing an Odor Control Facility Plan to evaluate options for improving
equipment reliability and performance while identifying long-term operations and
maintenance cost savings opportunities. Staff completed the condition assessments in
FY 23-24, with performance testing scheduled for late 2024.
New Electrical Substation (in progress)
A multi -divisional effort is ongoing to further develop a new electrical substation
(referred to as substation #55) for providing a new feeder from PG&E. The new
substation will address redundancy, reliability, and safety concerns, and it offers a
phased approach to replacing electrical assets in need of replacement for the entire
treatment plant. Capital Projects expects to begin final design in early 2025 after the
RFP process is completed in later half of 2024.
Steam Turbine Generator Feasibility Evaluation (in progress)
Staff is evaluating the feasibility of the steam turbine generator which would provide a
means to convert steam surplus to electricity and is predicated on having the new
electric blowers serving as the lead blowers. Staff from multiple divisions completed a
site visit to see similarly sized equipment at the University of California, San Diego in
December 2023. Evaluations will continue as part of Energy Management Planning and
Pre -design Project.
15
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 43 of 66
Page 22 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
Retrofit of Aeration Basins for Nutrient Removal (in progress)
A multi -divisional effort is ongoing to evaluate technologies that can be used to retrofit
the existing aeration basins to address nutrient mitigation in a timely fashion before
2034. Work in progress includes the MABR pilot (detailed earlier in this report), split
treatment evaluation (secondary clarifier final design), and scum/foam control
evaluation. The MABR pilot phase was completed in November 2024. Nutrient
Management Planning will begin in FY 24-25.
Grit Trap Designed by Staff (completed)
Solids and grit tend to build up in pipelines when flow is low. For larger pipes designed
to handle wet weather conditions, seasonal changes and weather can contribute to the
challenges of low flows, as they require higher flows to flush grit and solids settlement.
Thus, larger pipelines can retain more sediment during long periods of low flow. This is
especially the case for siphons that can trap settlement until higher flows are present. In
response to recurring challenges encountered in cleaning and flushing a 42-inch
interceptor and siphon, staff designed a grit trap that could be installed before sewage
enters the siphon. The new structure will help CSO significantly in removing settlement
before reaching the siphon. Installation was completed as part of the Danville Sewer
Renovations, Phase 4, District Project 8466.
CSO recently removed approximately five cubic yards of grit from the trip. In the past,
this grit would have flowed through a siphon and would have remained there until the
flows were great enough to flush the siphon. There is now a recurring preventative
maintenance work order to clean the grit trap every 12 months to prevent grit
accumulation in the downstream siphon.
16
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 44 of 66
Page 23 of 42
CENMALSAN FYs 22-24 Optimizations Program Annual Report
Piloting Addition of Baffles to Secondary Clarifiers (in progress)
In 2022, there was a study which utilized a proprietary flo-clip baffle system that was
piloted, validated, and installed in our primary tanks in 2014-15. Staff is now evaluating
adding baffles to our secondary clarifiers, using a model which predicts that this
proprietary baffle system will increase process capacity of the clarifiers from 100 MGD
to 127 MGD. Extreme weather events are concerning for the plant, and the potential
increase in capacity allows the clarifiers to handle more flow. Unit costs for potential
future baffles would be less than an initial pilot, and in-depth modeling will continue to
be invaluable for evaluating alternatives and making recommendations. This baffle pilot
will collect real data and ultimately provide Central San with more potential options.
Central San is looking into installing a baffle pilot in North Clarifier 1 to allow for data
gathering.
Instrument Work Order Report (completed)
Central San developed a Cityworks Title V Instrument Work Order Report, which is
being used by the Regulatory Compliance group to ensure all instruments used to
demonstrate compliance with Title V requirements are being routinely calibrated. Prior
to implementation, staff would need to look up 20 different work orders individually two
to three times/year, but the data can now be retrieved in under a minute and presented
in a concise, presentable way. Staff can now fill in a starting date and ending date field
to extract relevant Title V work order data into a spreadsheet and HTML document.
Sodium Hypochlorite Usage for #3 Water (completed)
This optimization is the culmination of a years -long project to identify the ability to
reduce or eliminate the use of bleach as a potential efficiency and cost savings. Staff
sought input from multiple divisions, tested samples, and gathered data, and confirmed
that there is not a chlorine residual requirement for in -plant water use within our
National Pollutant Discharge Elimination System Permit, and the #3 water for on -site
use is a Title 22 exemption we provide for ourselves. Thus, Central San could either
eliminate sodium hypochlorite feed to the high and low pressure #3 water or significantly
reduce the current amount used by as much as 50%. While there is not a capital cost
associated with elimination, there is a capital cost with reduction that has a payback of
approximately eight months. Chlorine C12 analyzers have been installed and are
operational on both 3WH and 3WL systems. As we are now able to continually measure
the residual, we can keep the level between 2-3 mg/L. With the soon to be completed
modifications to Hypo Site 1, staff should be able to control the hypo pumps off the
measured analyzer reading.
Optimization of Extraction Procedure for Semi -Volatile Organic Compounds by
EPA 625.1 (in progress)
The Lab Group is exploring alternative extraction procedures for method EPA 625.1.
The existing procedure limits laboratory capacity to 15 samples per 3 days. The new
Solid Phase Extraction (SPE) procedure has the potential for 75 samples per day. This
will greatly increase laboratory capacity. A requisition is in progress for a 60-day trial of a
Fluid Management Systems (FMS) SPE apparatus. Staff has visited a sister agency in
San Jose to see their FMS set up and ask questions.
17
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 45 of 66
Page 24 of 42
CENMALSAN FYs 22-24 Optimizations Program Annual Report
Capital and Operational Improvements (completed and in progress)
Central San completed the following innovations in Capital and Operational
improvements:
• Completed the Information Technology / Operational Technology (IT/OT)
Strategic Plan with roadmaps for network security, SMART Utilities, GIS,
Enterprise Asset Management, Business Intelligence, and Supervisory Control
and Data Acquisition (SCADA) systems, prioritizing 81 projects
• Established IT and OT Steering Committees for plan governance
• Digitized 35 boxes of plant documents for Laserfiche, reducing paper processes
• Integrated RF Smart Barcode with Oracle to automate cycle count and receiving
processes in Materials Services
• Enabled plant virtualization with hyperconverged servers for SCADA
• Configured ERP system
• Implemented Permitting and Community Development
• Implemented Journeys for administrative asset tracking of badges, keys, and
other items issued to employees
• Developed agreement terms and conditions with Contracts
• Formulated 18+ reports for Finance, Human Resources, and Purchasing.
in
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 46 of 66
Page 25 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
DATAANALYTICS AND VISUALIZATION
The optimizations in this section gather, display, and use data to inform staff decisions,
whether in responding to issues in real time or in thoughtful planning for the future.
Digital Real -Time Monitoring Program (Aquasight Apollo) (in progress)
Staff in multiple Operations divisions are working together to pilot Aquasight's Apollo
intelligent process advisor tool on two treatment plant processes: solids dewatering and
treatment plant influent pumping. The tool will use real-time data to evaluate process
performance, suggest changes to improve energy efficiency and chemical usage, and
identify opportunities for preventative maintenance to try to avoid more expensive
emergency fixes. A real-time data connection is complete between Aquasight and
Central San's data historians for the treatment plant. Dashboards are operational, and
after conducting training sessions, Operations is pilot testing the tool through December
2024 to determine if long-term adoption is beneficial.
Mechanical Maintenance Dashboards (completed)
Staff created a dashboard to develop trending information for the Treatment Plant
Mechanical Maintenance Shop, showing various readings from bearing temperature
and sound inspections for furnace blowers.
Smart Motor Controls (completed)
Staff implemented smart motor control centers (MCCs) at variable frequency drives
(VFDs) at the Headworks facility. Performance metrics such as power and pump
efficiency are available, so real-time data driven decisions are being made by
Operators.
Digital Recording of Rounds Data (in progress)
_
Plant Operators perform "rounds" every day to gather data to monitor
plant performance. On any given day, they can collect up to 3,300
data points on 18 sheets of paper, which they copy by hand for the
Control Room. However, less than 8% of the data that is written or
'
collected is currently stored electronically. In a multi -divisional effort,
staff sought a way to optimize this process by digitizing rounds sheets
by transferring them into Cityworks. After the Operators beta tested
the digitized process on mobile devices, it was found that entering
rounds data into Cityworks was time consuming and not justified by
the gained benefit. Digitally recording rounds data in Dynac provides
more operational benefit, and staff is now exploring ways to expand
this effort.
Migration to Utility Network for Sewer and Recycled Water (completed)
Central San's current geographic information system (GIS) database follows the Local
Government Information Model (LGIM) database schema, which used the Geometric
Network for Sewer and Recycled Water datasets. Staff used ArcGIS Desktop (ArcMap)
19
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 47 of 66
Page 26 of 42
CENTRALSAN FYs 22-24 Optimizations Program Annual Report
for editing the datasets on the Geometric Network. Esri is phasing out their support for
the ArcGIS Desktop in the next five years, with support ending March 1, 2026, which will
limit staff's ability to continue editing these datasets. This project migrated the sewer
and recycled water to Esri's newer Utility Network Model, which accurately models real -
world assets with greater detail, providing us the tools to enable Central San to
showcase our assets towards a digital twin.
Asset Health Indicator Tool (in progress)
A tool is being developed to use data and analytics to optimize maintenance schedules
to supplement Central San's condition -based maintenance program. The Plant
Maintenance Division has various asset condition monitoring sensors which monitor and
measure the health of assets and identify opportunities for optimization. These tools can
sense vibration of rotating equipment such as pumps and motors, thermography,
ultrasound, motor windings temperature, flow, laser alignment, and motion amplification.
The objective of using these sensors, coupled with analytics tools, is to perform analysis
on the assets and determine when a failure may occur, when to perform maintenance,
how to reduce overall cost of maintenance, and ways to improve reliability. Part of the
Master Plan will be to develop Asset Health Indicator Requirements and an Asset Tool
Framework and workflows, evaluate various software products, and begin rolling this
program out in a systematic way that will enable us to more efficiently utilize our
maintenance staff and resources while improving the reliability of these systems.
Large Diameter Inspection Program (in progress)
Central San has 88 miles of large -diameter pipes (greater than
18 inches), which include approximately 3,800 feet with a
siphon configuration and 1,200 maintenance access holes.
These assets have a replacement cost of over $2 billion.
Approximately 50 percent of these are over 50 years old, so a
comprehensive condition assessment at this point in their
lifecycle is appropriate to proactively identify early failure that
can be addressed through spot repairs, provide an estimate of
the assets' remaining life to better inform future replacement in
the Capital Improvement Program, and develop a reasonable
reinspection program based on the deterioration rates
identified. A five-year inspection contract was awarded in June
2024 to inspect large diameter pipes, siphons and force
mains. In FY 24-25 (the first year of the contract),
approximately 80,000 linear feet (LF) of large diameter pipe,
1,900 LF of siphons, and 360 maintenance access covers are
planned for inspection. The findings of these inspections will
help us plan for the future.
Visualizing HHW/Recycled Water Customer User Data on Map (in progress)
Staff is working on a way to visualize visitor data collected for the HHWCF and
Residential Recycled Water Fill Station for location -based analytics. Currently, staff is
20
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 48 of 66
Page 27 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
working to create maps and automate the process of cleaning up data.
Map Layer and Map for Environmental Compliance (in progress)
Staff developed a map layer and associated web map for the Environmental
Compliance group using data derived from their Structured Query Language (SQL)
Server database. Staff developed processes to automatically find new businesses
entered into the SQL Server database and create corresponding locations in the map
layer. Environmental Compliance can use the web map to perform QA/QC on the
business location points and adjust locations as needed. The map layer can be added
to Central Portal to make it easier to identify businesses that are inspected by
Environmental Compliance.
Data Screens at Pumping Stations (completed)
Staff implemented high performance graphics at three pumping stations, with screens
tailored for intuitive, information -driven interfaces.
21
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 49 of 66
Page 28 of 42
,&11% FYs 22-24 Optimizations Program Annual Report
PLANT MAINTENANCE
(co-authored by Staff Engineer Alejandro Lanza in the Plant Maintenance Division)
The optimizations in this section were completed by the Plant Maintenance Division to
effectively maintain our assets and improve processes in the plant.
Street Sweeper Truck (completed)
Buildings and Grounds (B&G) staff spend a significant amount of their time working to
keep the treatment plant and roads clean. Their new street sweeper lowers the cost for
monthly sweeping services and provides for safer and cleaner sites at CSO, the
pumping stations, the treatment plant, and the Martinez campus. B&G staff also plans to
do weekly sweeping in the fall, and during projects inside the treatment plant (in the
purple -colored areas below) as needed.
Hot Well VFD Retrofit (completed)
In February 2024, Maintenance staff completed a retrofit of the Hot Well 2 VFD. Work
consisted of replacing the existing, obsolete Allen Bradley model with a new, readily
available, Eaton Power XL DG1 drive. In addition, the Controls group assisted with
replacing the existing hardwired controls with network control that utilizes a single
ethernet cable connection between the programmable logic controller (PLC) and drive,
significantly cleaning up the control system design and minimizing failure points. This
VFD configuration will be used on all projects moving forward.
t
priority wet weather work.
Electric Utility Pumps for Wet Weather Basins (completed)
During the wet weather season of 2023, B&G staff set up to
pump and fill the wet weather basins using diesel utility
pumps. This required frequent diesel fuel refills that added
time and labor to the job. Staff noticed there was 480V power
supply at the basins and realized they could use an electric
utility pump instead of the diesel pump. This allows B&G staff
to let the pump run continuously, which significantly reduces
pump monitoring and makes time to address other high
This strategy will be implemented for future basin pumping.
22
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 50 of 66
S ..
CENTRAL CONTRA COSTA SANITARY DISTRIC p
Page 29 of 42
FYs 22-24 Optimizations Program Annual Report
Im
On -Site Vacuum Truck (completed)
B&G now has a vacuum truck for as -needed on -site use.
Having this robust equipment on standby at the treatment
plant allows maintenance to optimize its strategy towards
activities like wet weather work and catch basin and sump
maintenance. The vacuum truck can also be of use to help set
up for performing camera inspections of underground piping
systems.
Punch-Lok Hose Clamping Machine (completed)
Custom hoses with diameters ranging from 3/4" up to 4" can
now be made in-house, using a punch-lok hose clamping
machine. Staff can maximize the useful life of hose material
and save on costs of buying new hoses when fittings break.
Previously, an entire hose would be disposed of if a fitting
broke. Now, with the Punch-Lok machine, broken fittings can
be removed, and a new fitting can be attached.
VLF Tan Delta Testing (completed)
The Electrical Shop has recently begun using a new
and improved method of cable testing called Very Low
Frequency (VLF) Tan Delta testing. Data acquired from
® VLF testing has been shown to be much more precise
o and conclusive compared to Central San's former
practice of megger testing. VLF testing is also
advantageous, as it requires 600x less power and
current to conduct the testing, making this method non-
destructive to the equipment as well. With the new VLF
Sinus testing unit, the Electrical Shop's trained technicians can now get better cable
condition data with decreased risk of damage.
Beaker Filling Manifold (completed)
The Machine Shop fabricated an upgraded beaker filling
manifold for the Lab. The preceding manifold shared a
common 4-inch header, fed by one inlet, for six nozzles. As a
result, the Lab experienced issues with uneven flow
distribution and a few failures at different nozzles. With the
new manifold design, an inlet feed from both sides and an
internally split chamber allows the Lab to have greater flow
control at each nozzle. The footprint has also been reduced
by using 2-inch CPVC, freeing up table space to mount the
manifold.
23
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 51 of 66
S ..
CENTRAL CONTRA COSTA SANITARY DISTRIC d
Page 30 of 42
FYs 22-24 Optimizations Program Annual Report
Hypo Pump Maintenance (in progress)
There are multiple hypochlorite pumps used
around the plant for keeping odor production
levels controlled. It was noticed that these hypo
pumps get frequent work orders written to
address leaking inlet/discharge end check valves.
Following a Root Cause Analysis study on these
valve failures, it was discovered that the
combined factors of high ambient temperatures,
PVC fitting degeneration, hypochlorite off -
gassing, and the use of threaded connections
were causing the hypo pump check valves to
over -pressurize and fail. The Machine Shop is
rebuilding these pumps to have an internal check
valve design, where threaded connections have
been completely removed and more weather
resistant CPVC is used. This work minimizes the
frequency of hypo pump valve failures and further optimizes our maintenance program.
Lubrication Program Enhancements (completed)
Mechanical Technicians worked together with
Reliability Engineering staff to update the list of
currently used and stored oils. By updating this
lubrication list and analyzing necessary quantities,
storage space was maximized in the Lube Room
and further lubrication program enhancement efforts
were kickstarted. The updated list of lubrications is
now a living document dedicated to listing what oils
are used for specific equipment, monitored by
Mechanical Maintenance and Reliability.
Additionally, a new oil storage Conex was purchased to consolidate and centralize bulk
oil storage. The Conex was received and stationed across from the current Lube Room.
This additional enclosure helps keep bulk oil barrels out of the elements and
uncontaminated.
Centrate Line Flange Modification for CSO (completed)
Every year, CSO visits the treatment plant to clean out the centrate line in the Solids
Conditioning Building (SCB). Typically, they must remove a blind flange that caps the
line and install an adaptor plate to install their hose equipment. To make the process
smoother and more efficient, the Mechanical Maintenance Shop fabricated a permanent
flange with preinstalled hose connections so CSO can simply arrive and connect to the
line and perform their maintenance.
24
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 52 of 66
S ..
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 31 of 42
FYs 22-24 Optimizations Program Annual Report
(Left — old adaptor plate, Right — New permanent flange)
Service Air Rental Compressor Filter Skid
(completed)
The rental air compressor filter skid was
designed and developed because of the
increasing difficulty and cost of finding oil -free
rental compressors for Central San's service air
maintenance needs. Instead of trying to find a
cost-effective oil -free rental compressor,
Reliability staff purchased a set of compressed
air filters and mounted the assembly onto a
portable skid for transportation. Staff purchased
three filter elements and associated housings
for removal of oil & water droplets, dry particulates, and oil vapors generated from an
oil -flooded compressor. The Machine Shop was then able to assemble the filters in
series and fabricate a wheeled skid that allows easy access to the filter elements for
future replacements. After some testing and troubleshooting, the filter skid is fully
operational and able to be used for future compressor rentals.
SQE (Safety Quality Effectiveness) Reliability Strategy Pilot (completed)
Reliability Engineering is trying out a new maintenance optimization strategy called
SQE. SQE is an internal audit that can be requested by maintenance staff to address
any concerns regarding safety, quality of work, or job effectiveness. The first SQE audit
was on B&G's monthly Outfall PM, and it resulted in the development of a more
complete and comprehensive Outfall Line map created by the GIS Group for utility
workers to reference. The goal of the SQE strategy is to give maintenance staff another
method of voicing their ideas of maximizing safety, quality and effectiveness to keep our
maintenance program continuously improving. Another recent SQE effort was held for
25
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 53 of 66
Page 32 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
our Washer Compactor 6-month PM and resulted in a new and improved SOP with
photos for each step and details provided by the technicians for smoother removal and
installation.
Central Contra Costa Sanitary District Updated: March 29 2024
Standard Operating Procedures Author. Enron f(andahan
ID # MNT-RE-4
PM Washer! Compactor 6 Month
Purpose The purpose of this procedure is to maintain the WasherlCompactor
Materials &
U—tity
Supplies
3 Locks
1 Err pty Wash
1 Rebuilt Rotat
2 Desiccant En
1 Anti -seize
Equipment &
. 30mm Wrench/Socket (Thrust
Tools
. 19mm WrenchlSocket (Motor)
• 5116" Wrend"Socket {Rotary r
• 7116" WrenchiSocket {Motor Ni
• 5001h C M-a-long
• (2) 4ft slings
• 6ftsling
• W Shadde
• Ice Removal Tool
• Forklift
Information
DO NOT drive forklift ove
weight
• W!C #1 is furthest south
• WIC #2 is furthest nurth
Central Contra Costa Sanitary District
Standard Operating Procedures
Proaednre Follow these steps to complete the PM.
Updated_ March 29, 2024
Author. Emon Kandatiad
ID R- MNT-RE-#
Instrument Shop Optimizations (completed and in progress)
• Replaced old float assembly in the brine tank with a standalone controller to
monitor brine tank level and control the 2 pumps in SCB Basement.
• Installed centrifuge sludge feed high pressure isolation rings on pumps 1-4,
which saved costs on an expensive diaphragm rebuild.
• Changed the configuration of the primary sampler in a way that saves money on
material, as well as resolves plugging issues.
• Upgrade to 3 water high and low transmitter.
• SCB Gas Train — upgraded all transmitters to smart transmitters (Furnace 2).
This is in process on Furnace 1.
• Cogen Transmitter Replacement — upgraded level and temperature transmitters
to smart transmitters.
26
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 54 of 66
Page 33 of 42
40IlCENTRALSAN FYs 22-24 Optimizations Program Annual Report
• Waste Steam Exchanger Controls — built PLC panel and assisted with new
controls.
• Installed SCB steam header transmitter and upgraded pneumatic control to new
transmitter.
• Final effluent bubbler — replaced old equipment with new bubble and controls in
Pump and Blower Basement.
• Working with Reliability on calibration and other gas bottle redundancy
identification effort to minimize wasted instrumentation gas.
• Upgrading SCB gas monitoring system (sensors and panel) to newer system with
better programming capability for alarming and communications.
27
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 55 of 66
Page 34 of 42
%�CENTRAL SAN FYs 22-24 Optimizations Program Annual Report
DON'T JUST FIX IT; IMPROVE IT. .�
Our Plant Maintenance staff is constantly rehabilitating our assets to extend their useful
life and optimize their performance. They make it a regular practice not to just perform
the preventative maintenance (PM) or repair, but also to ask what more can be done.
Work orders that are categorized as "Don't Just Fix It; Improve It" (DJFI) typically meet
one or more of the following criteria:
• Proposal of an optimization idea
• Failure before an asset's useful life
• Repeat failures showing on the Bad Actors list
• Multiple reactive or corrective work orders on a high -criticality asset
• More than one reactive work order with a priority of one or two on a specific asset
between PM tasks.
DJFI Work Orders completed in FY 2022-23: 11
DJFI Work Orders completed in FY 2023-24: 23
In total, these 34 DJFIs resulted in energy cost savings, staff time savings, added
redundancies, improved resiliency, simplified operations, and/or made adjustments
needed for regulatory requirements.
DJFI Highlights:
• Replaced old underground feeder wires with cross -linked polyethylene high heat -
resistant water-resistant (XHHW) wire.
• Finalized electrical quick disconnect installation effort on washer compactor 1
and 2.
• Cut all UV channel support bracing at a 45-degree angle to prevent any catching
of the UV bank.
• Upgraded Deaerator Supply Pump #2.
• Installed lifting eye to the Primary Effluent Pump #2 coupling guard.
• Installed new grease plumbing on Primary Effluent Pump #2 Motor for safe
access while running.
• Hard face welded the compaction zone of the conveyor shaft, adding time to the
life expectancy of the washer compactor.
• Replaced flusher fixture with a recycled water rated flusher to mitigate wear and
tear failures.
• Added isolation valve to 3WHP system piping to simplify operations.
• Primary effluent pump conduit brace adjusted for better accessibility.
W
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 56 of 66
Page 35 of 42
�I CENTRALSAN FYs 22-24 Optimizations Program Annual Report
• Replaced old style desiccant breathers on ash equipment for longer run time and
staff time savings.
• Installed new lifting cables on sump pumps that allows Maintenance to access
the lifting devices in a safer manner than previously (no longer requiring a
confined space permit to recover the lifting devices from their previous positions).
When Plant Maintenance technicians are fulfilling a work order, they sometimes identify
a need to update the work order to reflect a better way of performing the task than
prescribed. Within Cityworks, Maintenance staff can check a box that sends an email to
a Maintenance Planner to request a QA/QC or improvement to the work order, SOP, or
asset.
The Planners then review and update the work orders accordingly — executing a
"Planner Update". This practice ensures that the work orders which form the basis of all
maintenance tasks are kept updated both by staff doing the work and staff scheduling
the tasks, leading to increased PM program effectiveness and efficiency.
Planner Updates completed in FY 2022-23: 141
Planner Updates completed in FY 2023-24: 145
Planner Update Highlights:
• Added inspections to critical furnace blower preventative maintenance work
orders (PMs)
• Received and uploaded maintenance manuals per requests by technicians
• Greasing schedule updates on influent pump PM
• Cancelling of redundant work orders on Cake Pump PMs
• Revised use of scaffolding for various PMs
• Added new Nueros blowers VFD filters to plant filters PM
• Obsolete Nax plant eyewash stations removed from inspection PM
• Updated and added multiple equipment stock items per requests by shops
29
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 57 of 66
S ..
CENTRAL CONTRA COSTA SANITARY DISTRICT
Page 36 of 42
FYs 22-24 Optimizations Program Annual Report
ACRONYMS
B&G
Buildings and Grounds
CIB
Capital Improvement Budget
CIP
Capital Improvement Plan
COPs
Certificates of Participation
CROMERR
Cross -Media Electronic Reporting Rule
CSO
Collection System Operations
DJFI
Don't Just Fix It; Improve It
EPA
Environmental Protection Agency
EPM
Enterprise Performance Management
ERP
Enterprise Resource Planning
FMS
Fluid Management Systems
GIS
Geographic Information Systems
HHW
Household Hazardous Waste
HHWCF
Household Hazardous Waste Collection Facility
IT
Information Technology
IT/OT
Information Technology / Operational Technology
JPA
Joint Powers Authority
LF
Linear Feet
MABR
Membrane Aerated Biofilm Reactor
MCC
Motor Control Centers
O&M
Operations & Maintenance
OPAL
Oracle Permitting and Licensing
PLC
Programmable Logic Controller
PM
Preventative Maintenance
RFP
Request for Proposal
SCADA
Supervisory Control and Data Acquisition
SCB
Solids Conditioning Building
SOP
Standard Operating Procedure
SPE
Solid Phase Extraction
SQE
Safety Quality Effectiveness
SQL
Structured Query Language
UV
Ultraviolet
VFD
Variable Frequency Drives
VLF
Very Low Frequency
30
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 58 of 66
Page 37 of 42
® CENTRAL SAN
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 59 of 66
Page 38 of 42
ATTACHMENT 2
Optimizations Program
Structure
Optimizations Tracking Log
Quarterly progress updates from the Managers
Optimizations Steering Committee meetings as needed
Annual reporting to Administration Committee and full Board
Annual Innovations Fair
Objectives
Identify and execute optimizations to critical processes organization wide
Track progress with leadership team oversight
Promote efficiencies and continuous improvement
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 60 of 66
Page 39 of 42
Optimizations
Increase efficiency and effectiveness
Improve customer service
Save time and/or money
Add redundancies
Improve safety
Leverage data for smart decision making
Innovate new ways of doing business
3
2023 Innovations Fair
Permanently Mounted GPS Base Station
(Innovation of the Year) I
Household Hazardous Waste Collection
Facility and Residential Recycled Water
Fill Station Visitor Electronic Scanning
Oracle Cloud Enterprise Performance
Management for Capital Reporting
Go With the Flow Bike Tours i
OPTIMIZATIONS
PROGRAM
ANNUAL REPORT J
Fiscal Years 22-24
"PIR,
4
January 14, 2025 Regular ADM IN Committee Meeting Agenda Packet - Page 61 of 66 2
Page 40 of 42
2024 Innovations Fair Projects
Membrane Aerated Biofilm Reactor (MABR) Pilot
Phase 1 (Innovation of the Year)
In/Out Board for Capital Projects
CSO Training Vault
Steam and Aeration Blower Renovations
71 - - .
5
Optimizations
Adding Lab Tasks and Data to Cityworks (in progress)
Piloting ProCore Construction Management Software (in progress)
Hazardous Materials Database (completed)
Pryor+ Learning Management System (completed)
NextRequest for Management of Public Records Requests (completed)
Oracle Enterprise Resource Planning and Enterprise Performance Management
Journeys module for administrative asset tracking of employee -issued items (completed)
Oracle Permitting and Licensing (in progress)
Development of Capital Improvement Budget / Capital Improvement Plan section of Budget Book (in progress)
I
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 62 of 66 3
Page 41 of 42
Optimizations (continued)
Retrofit of Aeration Basins for Nutrient Removal (in progress)
Evaluation of technologies (e.g., MABR, split treatment, and scum/foam control) to address nutrient
mitigation before 2034
Grit Trap (completed)
Decreases settlement entering and clogging the siphon during low flow periods
Piloting Addition of Baffles to Secondary Clarifiers (in progress)
Increases process capacity in the clarifiers, useful in wet weather events
Aquasight Apollo Digital Real -Time Monitoring Program (in progress)
Piloting an intelligent process advisor on solids dewatering and treatment plant influent pumping
Large Diameter Inspection Program (in progress)
50% of our large -diameter pipes (>18 inches) are over 50 years old
Comprehensive condition assessment to identify early failure points and develop a reasonable
reinspection program
VA
Completed Maintenance
Optimizations
34 "Don't Just Fix It; Improve It"
work orders
286 Quality Assurance /
Quality Control Planner updates
Mechanical Maintenance Dashboards
Punch-Lok Hose Clamping Machine
Beaker Filling Manifold
Lubrication Program Enhancements
Centrate Line Flange Modification
8
a
January 14, 2025 Regular ADMIN Committee Meeting Agenda Packet - Page 63 of 66 4
Thank you to
staff, the Leadership Team, and the Board
for supporting optimization and innovation!