December 3, 2024
TO: ADMINISTRATION COMMITTEE
FROM: CHRISTINA GEE, MANAGEMENT ANALYST
REVIEWED BY: PHILIP LEIBER, DEPUTYGENERAL MANAGER -ADMINISTRATION
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE STRATEGIC PLAN TRACKER FOR THE FIRST QUARTER OF
FISCAL YEAR (FY) 2024-26
Attached is the Strategic Plan Tracker for the first quarter of FY 2024-25, and the first year of Central
San's FYs 2024-26 Strategic Plan. This report provides an update on the progress on each goal and
strategy through the fulfillment of the key success measures (KSMs) and the key metrics.
In a change from previous years, the KSM and Key Metrics Trackers have been combined into one
document, for more streamlined data collection and publishing.
Staff has provided updates to two KSMs (on pages 5 and 19). The former wording that is included in the
published Strategic Plan remains on the tracker, in italics under the updated KSM.
Per the Committee's request, last fiscal year's quarterly performance has been included for metrics that
are On Hold / Delayed / At Risk or Off Track.
The color legend is defined as follows for each tracker:
BLUE — Completed
• Key Metrics Tracker: Target was met for the FY
• KSMs Tracker: KSM was fulfilled
GREEN — On Track / Revised Approach
• Key Metrics Tracker: Target is on track to be met or metric is being measured differently from how it
is written in the Strategic Plan but preserving the intent
• KSMs Tracker: KSM is in progress or being done differently from how it is written in the Strategic
Plan but preserving the intent
YELLOW— On Hold / Delayed /At Risk
• Key Metrics Tracker: Ability to meet target is on hold, delayed, or at risk but recoverable
• KSMs Tracker: KSM is on hold, delayed, or at risk but recoverable
RED — Off Track
• Key Metrics Tracker: Target is in danger of not being met for the FY
• KSMs Tracker: KSM is in danger of not being fulfilled by June 30, 2024.
December 3, 2024 Regular ADM IN Committee Meeting Agenda Packet - Page 75 of 102
Page 2 of 26
Staff will be available at the meeting to answer questions.
ATTACHMENTS:
Strategic Plan Tracker
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 76 of 102
Page 3 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 1 - CUSTOMER SATISFACTION AND STAKEHOLDER ENGAGEMENT
Provide value and reliability to our customers and cultivate relationships within our community and industry
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Conduct a customer satisfaction survey and develop creative ways to meet
Barnett
expectations.
Effectively collect and treat wastewater
with our customers and stakeholders in
Gemmell / Seitz /
Ongoing. Permit Counter, Collection System Operations
mind.
Survey customers on work directly impacting them.
Barnett
(CSO), and Communications (re: construction projects) send
out regular customer surveys.
Be attentive to our customers' and stakeholders' needs.
All Managers
and Staff
Ongoing.
Q1: Meetings scheduled for Laf 15 and P Hill 2 in Q2.
Hold community meetings for all major sewer renovation projects, including
Carpenter
outreach to the impacted cities and county.
Minimize impacts to residents and
Meet individually with property owners and/or tenants on projects involving
Carpenter
Ongoing. Met with property owners as needed.
Deliver High-
businesses during capital projects,
Quality Customer
construction work, and maintenance.
private easements.
Service
Carpenter
Ongoing. Resolved issues as needed.
Troubleshoot and resolve construction issues rapidly.
Q1: Raftelis contract executed, and rate model being reviewed
Conduct a Cost -of -Service Study for FY 2025-26 rates.
Gemmell
by consultant. CIP ten-year plan is being reviewed to revise for
nutrients.
Q1: Planned work to begin in Q3.
Perform annual reviews of rate structure and fees.
Gemmell
Maintain affordable services.
Ongoing.
Administer low cost financing programs and explore others to offer.
Gemmell / Leiber
Conduct updated affordability review using new Environmental Protection
Gemmell
Q1: Planned work to begin in Q3.
Agency (EPA) Financial Capability Analysis guidelines.
Q1: Two hundred and eighty (280) participants were served at
Conduct public tours and presentations.
Lavender
local events, and through community presentations and
facilities tours.
Q1: Completed for 2024. Next session tentatively planned to
Host citizens' academy (Central San Academy) annually.
Gee
be held in spring 2025.
Perform extensive customer and
community outreach.
Ongoing. Continue to monitor and grow YouTube, Facebook,
Engage with Our
Expand social media outreach.
Zumbo / Vallee /
Twitter, Instagram, Linkedln, and Nextdoor followers and
Customers,
Barnett
impressions.
Community, and
Industry
Q1: Two (2) Go with the Flow Bicycling Tours were held at
Lead Go with the Flow bicycling tours.
Lavender /
locations throughout our collections system
Barnett
Connect with elected officials, staff, and stakeholders on initiatives.
Barnett
Ongoing.
Form and sustain relationships with
Ongoing outreach during events, meetings, and outreach on
federal, state, and local elected officials
and stakeholders.
Support Board Member engagement with elected officials, focusing on nutrient
Barnett
programs, services, and legislative perspectives.
compliance and water reuse.
Page 1
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 77 of 102
Page 4 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 1 - CUSTOMER SATISFACTION AND STAKEHOLDER ENGAGEMENT
Provide value and reliability to our customers and cultivate relationships within our community and industry
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Ongoing.
Participate in industry organizations and forums.
All Managers
and Staff
Cooperate with professional organizations
Ongoing.
g g.
and peer agencies.
Share industry -leading work.
All Managers
and Staff
Key Success Measure (KSM) Tracker color coding
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach O On Hold / Delayed / At Risk
(KSM was fulfilled) (KSM is in progress or being done differently from how it is (KSM is on hold, delayed, or at risk but recoverable)
written in the Strategic Plan but preserving the intent)
•Off Track
(KSM is in danger of not being fulfilled by 6130126)
Page 2
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 78 of 102
Page 5 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 1 - CUSTOMER SATISFACTION AND STAKEHOLDER ENGAGEMENT
Provide value and reliability to our customers and cultivate relationships within our community and industry
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
Average customer service rating
?3.8 out of 4.0
Seitz
4.00
for emergency calls
Average customer satisfaction rating
?95/o o
Gemmell
100/o a
Q1: 8 of 8 Surveys; 7 received Excellent ratings and 1
for permit counter interactions
received Fair rating (received work without permit fine)
92%
01: received surveys from Pleasant Hill Sewer Renovation
Average customer satisfaction rating
>!95%
Carpenter
Phase 2
for construction projects
FY 2023-24: 73%
32 minutes
Q1: Slightly above goal. Discuss with field crews at End of
Average onsite response time
Month meeting
for collection system emergency calls,
:530 minutes
Seitz
FY 2023-24:
during working hours
26.95 minutes
Average onsite response time
for collection system emergency calls,
:540 minutes
Seitz
27 minutes
after hours
Sewer Service Charge (SSC) affordability
<2%
Q1: Planned for Q3 after Financial Workshops.
(EPA Lowest Quintile Residential Indicator)
(or lower than
Gemmell
High Impact)
Participants in public tours
>!500
Lavender /
Q1: Two hundred and eighty (280) participants were served
and presentations
Barnett
280
at local events, and through community presentations and
facilities tours.
Participants in Central San Academy
>_35
Gee
Q1: There were 43 participants in the 2024 Central San
Academy.
01: Esri Special Achievement in GIS and Presentation at the
Awards or recognitions received
>_10
Young
2
User Conference Plenary and CAPIO - Excellence in Public
Information & Communications Award from the California
Association of Public Information Officials.
Key Metric Tracker color coding
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
OCompleted O On Track / Revised Approach O On Hold / Delayed /At Risk • Off Track
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed, (Target is in danger of not being met for the FY)
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
Page 3
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 79 of 102
Page 6 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and implement measures to reduce contributions to climate change and mitigate its impacts
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Q1: Received Platinum 26 for cy 2023; on track to be eligible for
Continue to attain National Association of Clean Water Agencies (NACWA)
Weer
Platinum 27.
Platinum Peak Performance Awards.
Ongoing. See Key Metrics Tracker table for performance.
Continue to keep sanitary sewer overflows at a reduced level.
Seitz
Meet all regulations to protect our
environment.
Ongoing.
Develop and submit an updated Sewer System Management Plan.
Waples / Frost /
Gemmell / Seitz
Goel / LaBella /
01: RFP for consultant selection prepared for release in Q2.
Develop along -term compliance plan for nutrient regulations.
Schectel
Comply with All
Ongoing.
Environmental
Regulations
Schectel — BACWA Exec Board Member, Co -Chair CASA
Regulatory Water Committee, participate on CASA State Leg
Committee, participate in NACWA and CASA conferences,
member of SFEI Board of Directors, Regional Nutrient
Participate in Bay Area Clean Water Agencies, California Association of
Schectel /
Management Steering Committee alternate.
Sanitation Agencies, NACWA, and other like organizations.
Barnett
Foster relationships
with regulatory agencies.
Barnett — BACWA Communications Committee; CASA
Communications and Legislative Committee participant; CASA,
CSDA, CAPIO conferences; CPSC legislative committee; NSAC
legislative committee, CSDA appointed member legislative
committee; CAPIO conference speaker.
Ongoing. Staff has regular meetings with RWQCB, BAAQMD,
Engage regularly with local, state, and federal regulatory authorities.
Schectel
and other regulatory agencies as needed.
Ongoing
Continue to collaborate with Contra Costa Water District (CCWD) and Valley
Water in advancing the water transfer policy discussions with the United States
LaBeIIa
Bureau of Reclamation on the Refinery Recycled Water Exchange Project.
Ongoing. Met with developer re: projected land use and
Continue to work with CCWD and the City of Concord to supply recycled water
Gemmell /Frost
wastewater loadings.
to the Concord Community Reuse Project.
Be a Partner in
Explore and advance
Q1: Diversion was not operated in summer of 2024. DERWA
Regional Development
cooperative opportunities.
of Local Water Supply
Continue to divert raw wastewater to produce recycled water to meet Dublin
requested its final 1-year extension under the Temporary
San Ramon Services District — East Bay Municipal Utility District Recycled
LaBeIIa
Diversion Agreement.
Water Authority (DERWA)'s peak summer irrigation demand.
Q1: Attended DERWA Board meeting to support update
Collaborate with the DERWA agencies to evaluate making the raw wastewater
presentation on next steps with DERWA-Central San diversion.
diversion permanent to expand recycled water use in Central San's service
LaBeIIa
Met with our legal counsel to initiate the development of a long -
term agreement and reviewed draft term sheet with Executive
area.
Team members.
Page 4
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 80 of 102
Page 7 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and implement measures to reduce contributions to climate change and mitigate its impacts
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Ongoing
Facilitate recycled water solutions (e.g., satellite water recycling facilities),
LaBella
consistent with the Guiding Principles.
Ongoing.
Operate and maintain a reliable recycled water distribution system.
Seitz / Gemmell /
Foss
Ongoing.
Continue the Residential Recycled Water Fill Station and Commercial Recycled
Gemmell / Foss /
Water Truck Fill Programs.
Frost /Wyatt
Continue to provide recycled water to
residents and businesses; evaluate and
Increase reliability and capacity under the Filter Plant rehabilitation and
01: On track. Expect 60% by end of Q2. Coordination continues
"Increase
process new customer requests.
electrical improvements.
with Capital, Consultant, and O&M Staff. KSM of
(Formerly: Initiate design -build for Filter Plant rehabilitation and electrical
Lopez / Mizutani
reliability and capacity under the Filter Plant rehabilitation and
improvements.)
electrical improvements" is more accurate given the project is no
longer being delivered via design -build.
Ongoing.
Confirm future capacity for Title 22 plant systems as needed for capital renewal
Gemmell / Frost
and replacement projects.
Q1: This will be accomplished as part of the Energy
Develop alternative options to reduce Central San's carbon footprint.
Goel/LaBella
Management Planning and Pre -design Project. The RFP for
consultant selection was issued in Q1 for contract award in Q2.
01: On track. Capital Projects developing RFP for 1st phase of
Cheng / Seitz/
EV charging infrastructure design -build project. RFP expected to
Implement the Fleet Electrification Strategic Plan.
Lopez
be posted during Q2. EV Implementation workgroup, consisting
of staff from Capital, CSO, and Regulatory meet biweekly to
ensure ongoing coordination.
Develop an energy optimization roadmap to maximize value of cogeneration
Goel / Hodges
Q1: RFP posted for consultant selection in 02.
Reduce reliance on non-renewable
equipment and plan future investments.
energy.
//
Lee Shima
Ongoing. Plant energy usage tracked monthly and reported
Track and review energy usage.
Meyer
quarterly to Admin Committees.
Optimize Energy
Explore the viability of a steam turbine generator to convert incineration waste-
Goel / Lopez /
Ongoing — included in the Energy Roadmap effort below.
Usage and Reduce
Greenhouse Gas
heat steam into electricity.
Meyer / Weer
Emissions
Q1: Construction for Phase 1 is in progress with projected
Replace the existing diffusers and associated control system with the latest
Lopez
completion in 2025.
state-of-the-art high efficiency diffusers and smart control systems.
Ongoing. Plant energy usage tracked monthly and reported
quarterly to Admin Committees.
Maximize landfill gas usage.
Weer / Lopez
Responsibly manage greenhouse gas
(GHG) emissions.
Ongoing. Plant energy usage tracked monthly and reported
Track and report GHG emissions as part of the energy usage report.
Lee / Shima /
quarterly to Admin Committees.Meyer
Page 5
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 81 of 102
Page 8 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and implement measures to reduce contributions to climate change and mitigate its impacts
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1 Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Ongoing. See Key Metrics Tracker for number of students
Present student education programs that meet Next Generation Science
Lavender /
served.
standards.
Barnett
Provide industry -leading public and
01: Social media outreach on wipes, FOG, pharmaceuticals, and
student education programming.
Conduct imaginative public education outreach that encourages positive
Lavender / Vallee
HHW
customer behavioral changes.
/ Zumbo / Barnett
Promote Pollution
Q1: Continued focus on diverting solid waste from Central San's
Prevention and
Environmental
Implement internal sustainability initiatives through the Green Team.
LaBella
operation to the landfill.
Protection
Q1: Held initial discussions on approach with Green Team.
Expand internal sustainability practices.
Complete Green Business re -certification for the Martinez campus.
LaBella
Q1: The Warehouse has procured several products that meet
Advance circular economies with suppliers and contractors towards a smaller
King / Gaines
the Green Team qualified ingredients as Green.
ecological footprint.
Page 6
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 82 of 102
Page 9 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and identify and reduce contributions to climate change and mitigate its impacts
KEY METRICS
Metric
Target
Responsible
Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
National Pollutant Discharge Elimination
0 violations
Weer
100%
System compliance
Recycled Water Title 22 compliance
0 violations
Weer
100%
Q1: 9/27 PG&E power outage led to the Emergency Bypass Damper opening on
3 different occasions. The 1st opening we have asked for Breakdown Relief; the
Title V compliance
0 violations
Weer
FY 2023-24:
0 violations
2nd and V were the result of process difficulties while trying to get Cogen back
online.
Regulatory Title V work orders
100%
Lee / Shima /
100%
completed on time
Meyer
Q1: 4 spills this quarter / 0.26 spills per 100 miles.
Sanitary sewer overflows
<_1.3 spills per 100 miles
Seitz
.26 spills per 100
of pipeline
miles
Spills to public water
151
Seitz
1 spill
Q1: There was 1 CAT 1 spill.
Spills greater than 500 gallons
:53
Seitz
0
Environmental Compliance inspections and
100%
Henry
100%
permitting completed on time
Household Hazardous Waste (HHW)
0 violations
Wyatt
100%
management compliance
Q1: 110.9MG (46% of target).
Recycled water distributed to external
>_240 million gallons (MG)
Foss
110.9 MG
customers
Electricity produced by co -generation using
>_18 million kWh (reported
Lee / Shima /
21 kWh
natural gas
as a rolling average)
Meyer
Solar power produced at Collection System
>_220,000 kWh (reported
Lee / Shima /
283,000 kWh
Operations and HHW Collection Facility
as a rolling average)
Meyer
Solar power produced
>_3.5 million kWh
Lee / Shima /
(pending staff
by a new solar array near the treatment
(reported as a rolling
Meyer
acquiring access to
plant campus
average)
data)
Anthropogenic greenhouse gas (GHG)
525,000 metric tons (MT)
Cheng /
Q1: On track to meet CY 2024 GHG target.
emissions
CO2e per calendar year
Schectel /
Weer
Students served by education programs
>_6,000
Lavender/
Barnett
1,954
Page 7
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 83 of 102
Page 10 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 3 — WORKFORCE DIVERSITY, EQUITY, AND DEVELOPMENT IN AN INCLUSIVE WORKPLACE CULTURE
Recruit, empower, and retain a workforce from diverse backgrounds and foster their trust
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
O'Malley /
Ongoing. Summer student and internship positions are offered in
Offer internships and summer student opportunities in cross -disciplinary positions.
All Managers
multiple workgroups, including Engineering, Plant Maintenance,
the Lab, Information Technology, and Communications.
Q1: Externship Program held in August. BAYWORK has
Host the Externship Program for college students and recent graduates.
Gee /O'Malley
requested a presentation on the program and to discuss a
potential collaboration with them on a future session.
Recruit from a Diverse
Pool of Qualified
Broadlysolicit a
applications to attract
Staff re collaborates with schools e. Los
Ongoing. g g' regularly ( g''
Applicants
a diverse talent pool.
Medanos College) and BAYWORK.
Form a talent pipeline by collaborating with schools and apprenticeship programs.
O'Malley / Meyer
/ All Managers
Q1: Associate Engineer in Reliability Engineering will serve as a
panelist for a freshman engineering course at UC Merced in fall
2025.
Ongoing. Staff regularly collaborates with schools (e.g., Los
Participate in intra-agency workforce development efforts.
Gee / O'Malley
Medanos College) and BAYWORK.
Continue the Supervisory and Management Academies, Mentorship Program, and
Gee / O'Malley
Q1: Supervisory Academy continues with 25 participants,
Mentorship Program with three mentees. Several employees are
Job Shadowing Program.
enrolled in the Job Shadowing Program.
Ongoing.
Encourage staff to obtain professional or technical certifications and registrations.
All Managers
Invest in Equitable
Support employees to grow to their
Talent Management
fullest capacity while contributing to
Ongoing.
Practices
Central San's success.
Conduct performance planning and appraisals with a coaching and career
All Managers and
Planning to roll out new appraisal hard copy forms in
development approach, while also establishing and conveying clear expectations.
Supervisors
No
November.
Ongoing.
Continue to promote and expand internal training opportunities.
Gee / O'Malley
Q2: Launched Pryor Learning as a learning management system,
with the ability to send staff to in -person trainings.
Foster a sense of community through interdepartmental cooperation and internal
Ongoing. Clarifier Speaker Series is held as topics arise and the
events and communications.
All Managers
Lateral Connection employee newsletter is released monthly.
Q1: Held Employee Appreciation Picnic on September 21.
Promote employee engagement and
inspire dedication.
Ongoing. Lateral Connection employee newsletter is released
Relay important initiatives to increase staff's understanding of our operations and
All Managers
monthly.
their role in our success.
Q1: Held open houses of the Membrane Aerated Biofilm Reactor
pilot through the Clarifier Speaker Series.
Ongoing. Lateral Connections highlight staff accomplishments in
Engage Employees and
Recognize staff accomplishments.
All Managers
Central San Happenings section.
Conduct Labor
Relations in a
Transparent and
Celebrate employees'
Q1: Draft Employee Appreciation and Recognition Board and
achievements.
Expand the employee recognition program.
Gee / O'Malley
Administrative Policies are being reviewed internally.
Collaborative
Environment
Continue to hold the Employee Appreciation Event and Innovations Fair to
Parks / Gee /
Q1: Employee Appreciation Event and Innovations Fair were held
recognize and thank employees.
O'Malley
in August.
Engage the bargaining units in informal discussions to implement collaborative
O'Malley
Ongoing.
Sustain and grow collaborative
solutions to workplace issues.
relationships with the bargaining
units.
Track and implement action items from quarterly Labor Management Committee
Gee /O'Malley
Ongoing.
meetings.
Page 8
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 84 of 102
Page 11 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 3 — WORKFORCE DIVERSITY, EQUITY, AND DEVELOPMENT IN AN INCLUSIVE WORKPLACE CULTURE
Recruit, empower, and retain a workforce from diverse backgrounds and foster their trust
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Meetings currently set up for November with Bargaining
Continue General Manager and Board Member meetings with the bargaining
Bailey / Crayton
Presidents and meetings with bargaining groups will be set up
representatives.
based on information out of those meetings.
Accept the DEI
Accept the plan;
Q1: Facilitated Inclusive Leadership Workshop for the Executive
Framework and
assign responsibilities;
prioritize and implement
(There are no KSMs listed in the Strategic Plan. Major accomplishments toward
Johnson
and Management Teams.
Strategic Plan and
key initiatives;
this initiative are listed in the comments section.)
Uphold Its Pillars
and report on progress.
Page 9
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 85 of 102
Page 12 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 3 — WORKFORCE DIVERSITY, EQUITY, AND DEVELOPMENT IN AN INCLUSIVE WORKPLACE CULTURE
Recruit, empower, and retain a workforce from diverse backgrounds and foster their trust
KEY METRICS
Metric
Target
Responsible
Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Average time to fill vacancy
<_60 day s
O'Malley /
51
(from request to hire)
Manor
Jul rec'd 65%;
Q1: Jul rec'd 65%; Aug rec'd 86%; Sep rec'd 70%.
Aug rec'd 86%;
Sep rec'd 70%
Completion of
100%
O'Malley /
performance evaluations
Howard
FY 2023-24:
Jul reed 71 %;
Aug rec'd 79%;
Sep rec'd 69 %
Average training hours per employee
>_15
3.12
(external and internal training)
Smith
Internal promotions
>25%
O'Malley /
46.15%
(excludes entry-level positions)
Granzella
1.06% excluding
Turnover rate
<D
_6.5 /°
O'Malley /
retirements
(including retirements)
Granzella
1.42% including
retirements
Formal grievances processed
0
O'Malley / Manor
0
Page 10
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 86 of 102
Page 13 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Operate a well -run, responsible, and ethical organization emphasizing integrity and transparency
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Keep apprised of changes to laws, regulations, and policies.
All Managers
Ongoing.
Comply with all laws, regulations,
Display policies in a visible location for staff to access.
All Managers
Ongoing.
and policies.
Incorporate potential impacts of regulatory changes into long-range infrastructure
Gemmell /
Ongoing.
and financing plans.
Schectel / Lopez
Live our values and conduct all business ethically.
All Managers and
Staff
Ongoing.
Update website with the latest Board agendas, public notices, financial documents,
Barnett / Young
and other content.
Govern and operate with
Promote and Uphold
transparency.
Respond promptly to Public Records Act requests.
Young
Ethical Behavior,
Openness, and
Accessibility
Renew California Special District Leadership Foundation Transparency Certificate
Young
Process will start in 2025 — award due September 2025
of Excellence.
Issue the Annual Comprehensive Financial Report no later than six months after
Mizuno
Audit is underway and expected to be delivered to Finance
the end of the fiscal year.
Committee in November and full Board in December.
Earn the Government Finance Officers Association Certificate of Achievement for
Completed and submitted application for FY 24-25 budget award.
Excellence in Financial Reporting and the Distinguished Budget Presentation
Mizuno
Produce accurate, timely, and
Award.
meaningful financial reports.
Q1: Oracle "Celebrate" went live, Continuing work on Treasury
Continue to enhance functionalities and outputs of the enterprise resource
and Cash management module implementation as well as
'Redwood'
planning (ERP) software and associated systems.
Mallory / Leiber
addressing OPAL issues. Preparing for Oracle
upgrade and completed legal review of 3 of 4 enterprise contract
templates.
Promote voter registration efforts.
Barnett
Voter registration info shared via social media
Support the elections process.
Enable voting through a secure, public ballot drop box on campus.
Young
Ongoing. Vote box is securely and permanently mounted.
Encourage and
Hold Central San division elections.
Young
Facilitate Public
Adhere to the Brown Act to provide public access to meetings.
Young
Ongoing.
Participation
Livestream Board meetings online.
Young
Ongoing.
Encourage civic engagement.
Maintain the virtual Customer Experience website.
Barnett
Ongoing.
Host public events.
Barnett / Lavender
Mitigate rate increases by leveraging financing opportunities.
Leiber / Gemmell
Q1: Working on Scenarios for Financial Workshop
Develop scenarios to utilize debt prudently in financing the 10-Year Capital
m
Leiber / Gemell
Q1: Working on Scenarios for Financial Workshop
Conduct long-range lannin
planning.
Improvement Plan (CIP).
Maintain Financial
Actively pursue state and federal funding via loans and grants.
Leiber / Gemmell
Ongoing for the UV Replacmeent project.
Stability and
Sustainability
Q1: Working on year-end close and anticipating budgetary
Ensure resilience against recession
Fund Rate Stabilization Account and Pension and Other Post -Employment
Mizuno /Leiber
variance. To deliver budgetary pre -audit budgetary variance
or other economic events.
Benefits Trust with available funds from favorable year-end variances.
recommendations to Finance Committee in October and Board in
November.
Page 11
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 87 of 102
Page 14 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Operate a well -run, responsible, and ethical organization emphasizing integrity and transparency
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Both Pension and OPEB plan latest actuarial results indicate
Strive towards full funding of employee -related obligations in accordance with
Mizuno / Leiber
strong funded status at 99.0% and 95.4% respectively. Future
Board policies.
UAAL contributions designed to achieve fully funded status in
accordance with policies.
Develop budgets in alignment with the Strategic Plan, Enterprise Risk
First quarter of newly adopted FY 24-25 budget plan and results
Management, and 10-Year Financial Plan.
Mizuno / Leiber
indicate Central San is under budget. Budget development to
largely commence in Q3.
Disseminate relevant and reliable interim financial information to management.
Mizuno
Issued monthly and quarterly financials to Management, Finance
Manage costs.
Committee, and Board as planned.
Purchasing transactions conducted in accordance with policies
Encourage competitive, transparent, and fair sourcing of goods and services.
King / Mizuno
and procedures. Worked on revisions to Board Policy for Board
adoption in Q2.
Track, review, and comment on proposed legislation and regulations.
Barnett
Ongoing.
Advocate for Relevant
Participate in legislative and
Support key advocacy initiatives through communications and outreach.
Barnett
Ongoing.
Legislative and Policy
Initiatives
regulatory processes.
Work with elected officials, government agencies, industry groups, and non-
Ongoing.
governmental organizations to support pollution prevention and other beneficial
Barnett
initiatives.
Page 12
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 88 of 102
Page 15 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Operate a well -run, responsible, and ethical organization emphasizing integrity and transparency
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
Board meeting videos posted online
100%
Young
Compliance with Public Records Act
100%
Young
requests on time
Q1: June, July, and August monthly overviews issued, as well as PY Q4 financial
Dissemination of interim financial reports
100%
Mizuno
100%
report.
Reported material weaknesses or
Q1: Independent audit over FY 23-24 ACFR in progress and expected to be
significant deficiencies
0
Leiber / Mizuno
N/A
completed and delivered to Board by December 2024.
in internal controls as part of annual
financial audit
Standard and Poor's and Moody's
AAA/Aa1
Leiber / Mizuno
AAA/Aa1
01: No changes to Central San's credit rating noted.
credit ratings
Year-end only calculation. To be updated in Q4.
Debt service coverage ratio
>_2.0
Leiber / Mizuno
N/A
N/A
N/A
Debt as a percentage of total assets
560%
Leiber / Mizuno
N/A
N/A
N/A
Year-end only calculation. To be updated in Q4.
Debt financing
Year-end only calculation. To be updated in Q4.
of prior 10 years' CIP spending
°
560 /o
Leiber /Mizuno
N/A
N/A
N/A
Debt financing as a percentage
Michalcz k /
Year-end only calculation. To be updated in 04.
of projected 10-year CIP
s60%
Leiber / Mizuno
N/A
N/A
N/A
Total revenue funded collection system CIP
N/A
Year-end only calculation. To be updated in Q4.
spending in past 10 years
°
?100 /°
Leiber /Mizuno
N/A
N/A
Total revenue funded collection system
N/A
Year-end only calculation. To be updated in Q4.
spending in 10-year CIP (projection)
°
?100 /o
Leiber /Mizuno
N/A
N/A
Operations and Maintenance (O&M)
>_41.7%
Year-end only calculation. To be updated in Q4.
reserves
of next year's budget
Leiber /Mizuno
N/A
N/A
N/A
>_50%
Year-end only calculation. To be updated in Q4.
Sewer Construction reserves
of next year's budget
Leiber / Mizuno
N/A
N/A
N/A
(non -debt financed)
Q1: Slightly below target, but expected to increase by close of Q2.
Operating expenditures
88.4%
as a percentage of Board -approved
90-100%
Leiber / Mizuno
operating budget
FY 2023-24: 88.7%
Purchasing requisitions completed within
Q1: 206 purchase requisitions received; 88% met processing time metric.
standard processing time
°
?85 /°
King
D
88 /°
Contractors/consultants in compliance with
01: 173 accounts in full compliance, 42 accounts in partial compliance, and 4
insurance requirements through
79%
accounts in non-compliance.
Purchasing
>80%
King
(excludes construction/public works
FY 2023-24: 83%
contracts done through Capital)
Page 13
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 89 of 102
Page 16 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Operate a well -run, responsible, and ethical organization emphasizing integrity and transparency
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
Actual inventory count value to book value
Q1: Book Value = $1,019,301.16 Count Value = $1,021,236.14.
error rate
D
<_3 /D
Gaines
D
<1 /D
Q1: Avg cost per overflow claim $6,290.
Average cost per overflow claim
:5$25,000
Deutsch
Page 14
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 90 of 102
Page 17 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 5 — SAFETY AND SECURITY
Provide a safe, secure, and healthful workplace that foresees and addresses threats
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Monitor accident/incident causes to identify and mitigate hazards.
Ledbetter
Ongoing.
Maintain low injury and illness
Provide regular analyses to the District Safety Committee, Safety Teams, and
Ledbetter
Ongoing.
rates.
Management Team on accident/incident causation and corrective measures.
Increase visibility of Safety staff in the field.
Ledbetter
Ongoing.
Enhance the safety culture through
improved training and
Conduct training based upon accident/incident causal factors, new processes,
Ledbetter
Ongoing.
Sustain a Safe and
communications.
equipment, or procedures.
Ongoing.
Healthful Workplace
Notify supervisors and managers promptly of upcoming safety -related regulations.
Ledbetter
Revamp and encourage participation in the Wellness Program.
O'Malley /
Ongoing.Howard
Support the mental and physical
Offer comprehensive benefits such as online therapy services and the Employee
O'Malley
wellbeing of all employees.
Assistance Program.
Hold financial and health seminars.
Mizuno / Gee /
Ongoing. Financial webinars are offered regularly through
O'Malley
Mission Square Retirement.
Q1: Team Mtg set for October.
Maintain and report on the Enterprise Risk Management Program and risk
Deutsch
inventory.
Activate and engage Risk Mitigation Teams to develop mitigation plans for key
Q1: Will follow ERM Team Mtg in October.
strategic risks.
Deutsch
Evaluate and apply risk
management practices.
Johnson /
Ongoing: Internal Audit takes arisk-based approach in
Identify internal audit opportunities based on risk assessments.
Deutsch /
developing the annual Audit Plan, collaborating with stakeholders
All Managers
across the District to identify and address risks.
Address findings from regular internal and external audits, including testing and
Johnson /
Ongoing. Internal audits identify opportunities for control
improving internal controls.
All Managers
improvements.
Collaborate with Contra Costa County to maintain and keep updated a Local
Frost
Q1: Planning has taken this over.
Identify, Evaluate, and
Hazard Mitigation Plan.
Mitigate Risks
Train staff and conduct an exercise of the Continuity of Operations Plan.
Deutsch
Q1: COOP Update in Q2, exercise planned for Q3
Maintain the Emergency Operations Plan.
Deutsch
Q1: Major Update completed 9/24
Enhance capability to mitigate,
Maintain planned level of Federal Emergency Management Agency training.
Deutsch
Q1: Planned for, and held on 10/30/24.
prepare for, respond to, and
recover from disasters and
emergencies.
Participate in California Water/Wastewater Agency Response Network.
Deutsch
Ongoing.
Be active partners in regional aid networks.
Deutsch
Ongoing.
Evaluate and implement
Budget and complete the projects identified in the Security Action Plan.
Deutsch
Ongoing
improvements to meet evolving
Ongoing
security needs.
Provide regular security awareness training to staff.
Deutsch
Page 15
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 91 of 102
Page 18 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 5 — SAFETY AND SECURITY
Provide a safe, secure, and healthful workplace that foresees and addresses threats
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1 Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Improve perimeter security at the Martinez campus.
Deutsch
Ongoing.
Ongoing.
Continue to modernize access control systems.
Deutsch
Q1: Extra staff assigned to strengthening OT cybersecurity.
Implement Information Technology (IT) Cybersecurity Roadmap.
Mallory
Corrected identified critical and high-level (CVE 8+)
vulnerabilities. SD -WAN has entered the planning phase to
address network redundancies
Q1: Security Operations Center performing continuous scans for
Stay updated on the latest trends
Conduct third -party cybersecurity assessments focusing on technology, people,
Mallory
network vulnerabilities in technology and physical assets.
and emerging threats in
and physical assets.
Awareness training and phishing simulations continue to evaluate
Understand and
cybersecurity.
staff. 3rd party penetration test scheduled for Nov. 2024
Q1: Cybersecurity awareness campaigns and phishing
Reduce Impacts of
Cybersecurity Attacks
Train staff to increase levels of awareness.
Mallory
simulations run monthly. Risk score dropped 7 points since Q4
2023
1: Quarterly reports replaced with Yearly reports.
Q
Distribute quarterly cybersecurity Reports.
Mallory
Execute the Disaster Recovery Plan.
Mallory
Q1: This is an IT Recovery Plan.
Prevent, detect, and remediate
Q1: Tabletop exercises to identify gaps in response and
effects of attacks.
Evaluate and test redundancies in network and equipment.
Mallory
infrastructure to be scheduled monthly. Completed an exercise
mid -October 2024.
Page 16
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 92 of 102
Page 19 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 5 - SAFETY AND SECURITY
Provide a safe, secure, and healthful workplace that foresees and addresses threats
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
Employee injury and illness
Q1: 142674.01 Hours Worked, 0 Recordable Injuries.
lost time incident rate
<_3.3
Ledbetter
0.0
Safety -prioritized work orders
100%
Lee / Shima /
100%
completed on time
Meyer
Days to implement approved
560
Ledbetter
100%
Safety Suggestions
Temporary modified duty provided
>_95% of recordable
O'Malley/
100%
(Return to Work program)
injuries
Ledbetter
Workers' compensation
01: Ex Mod is .67 for the entire fiscal year.
experience modifier
<-1.0
Deutsch
.67
.67
.67
67
01: There is currently not an expo planned.
There is currently
not an expo
Participation in annual Wellness Expo
+>10% each year
O'Malley /
Howard
planned.
FY 2023-24:
Expo was planned to
be held in Jan/Feb
Emergency response supplies and equipment
Deutsch /
01: This item needs further review with Risk and Safety. Also need input from
in stock
o
100%
Gaines
o
100%
Maintenance
01: Training and phishing simulations run monthly, extra content for October
Employees trained in
o
100%
Mallory
2024.
cybersecurity awareness
Page 17
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 93 of 102
Page 20 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Formalize a condition assessment process for each asset class and complete
Meyer / Goel /
Q1: Process was identified and implemented as part of Steam
Project. Optimization is wrapping up condition assessment on
condition assessments on all critical equipment.
Lopez
Clarifier/Secondary Assets. Will be complete in Q2.
Ongoing. Failure reporting and corrective action system
Follow failure reporting and corrective action system process on critical assets.
Meyer / Lopez
(FRACAS) process in place and followed.
Ongoing. See Key Metrics tracker for number of Planner
Complete Planner Updates to work orders and use other feedback mechanisms for
Lee / Shima /
Updates completed.
continuous improvement.
Meyer
Incorporate asset management
Ongoing. Staff regularly reviews and optimizes pipeline
practices into the Capital
Optimize rehabilitation, replacement, and cleaning of pipelines.
Seitz
cleaning schedules.
Improvement and Maintenance
Programs.
Ongoing. Initiated pump station condition assessments.
Update Sewer System Infrastructure Plan to identify collection system capital and
Waples /Frost /
O&M needs and opportunities.
Gemmell / Seitz
Ongoing. Prepared National Plant Services inspection contract
Manage Assets for
Implement large diameter and force main condition and risk assessment programs.
Lawson / Waples
Frost /Gemmell
package.
Optimal Lifecycle Value
Ongoing.
Continue to implement the recommendations listed in the Strategic Asset
Lopez / Meyer /
Management Plan.
Goel
Q1: Consultant on board and down to final presentations from
Develop an Asset Health and Condition Monitoring framework, including using
Meyer
three vendors for asset health.
reliability -based analysis and condition -based and predictive -based technologies.
Q1: Appling technics to UV project.
Apply reliability -centered design to one or more capital projects.
Meyer / Lopez
Develop and pursue reliability -
centered asset management
strategies and design.
Add service contracts to computerized maintenance management software
Lee /Shima /
Q1: Ongoing effort.
(CMMS) to track work orders.
Meyer
Q1: Ongoing effort working on West side now.
Transfer Pumping Stations Operations preventative maintenance work orders to
Lee /Shima /
CMMS.
Meyer
Ongoing. This is part of routine CAPEX review and CAPEX
Ensure all critical assets and processes in need of repair or replacement are
Meyer / Lopez /
coordination meetings.
Achieve risk -balanced prioritization
appropriately scheduled in the 10-Year CIP.
Weer
using a consistent evaluation and
planning framework with
Ongoing.
interdepartmental coordination.
Develop a prioritization model for vertical assets and update the risk model.
Gemmell / Meyer
Page 18
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 94 of 102
Page 21 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
KEY SUCCESS MEASURES
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Ongoing.
Execute the Approved
Capital Program
Coordinate interdepartmentally and with all stakeholders to prioritize projects.
Lopez
Q1: RFPs for nutrients and electrical/energy drafted.
Develop and continue updating strategic roadmaps for nutrients, electrical, energy,
Goel / Lopez
Consultant selection expected in Q2. Solids is progressing
and solids.
under the Solids Ph 2 effort.
Ongoing.
Update the process for new projects to be accepted within the CIP by Capital
Lopez
Projects.
Q1: Templated completed and reviewed by legal. Includes
Finish updating contract templates.
Lopez
PES for large projects, UPCCAA, and construction. Routine
updates shall be done under the Capital Projects Specification
Committee.
Investigate a single -platform application for project details and shutdown
Lopez / Weer /
Ongoing, scoping and meeting with user groups.
processes.
Goel
Continue project management and project delivery training for responsible staff
Lopez
Ongoing.
and develop onboarding process for new staff.
Ongoing.
Provide Project Management Professional training for all project managers.
Lopez
Completed. Q1 Reviewed FY 23-24 SWOT assessment and
Improve CIP delivery capability.
Perform annual CIP self -assessment.
Lopez
CIP under a series of workshops.
Ongoing. Q1 performed high I;evel review under Annual CIP
Conduct annual forward -looking delivery capacity review.
Lopez
Assessment.
Q1: Identified plan to use Procore for construction payment
Manage all contracts in Procore.
Lopez
review and billing. Also, have the ability to use for planning and
(formerly. Manage all contracts in Enterprise Performance Management (EPM).)
design agreements. Request for approval from the Board in
Q2.
Q1: FY 23-24 items completed. Second phase in progress.
Complete internal audit recommendations.
Lopez
Update all Engineering procedures for Capital Projects.
Lopez
Completed in September.
Page 19
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 95 of 102
Page 22 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
Planner Updates (work orders improved)
>_24
Lee / Shima /
Meyer
38
Planned treatment plant preventative
>90%
Lee / Shima /
98%
maintenance completed on time
Meyer
Planned recycled water distribution system
preventative maintenance
>_98%
Seitz
100%
completed on time
Planned collection system preventative
>98%
Seitz
D
99.24/D
maintenance completed on time
Pipeline cleaning
On >_3% of pipelines
quality assurance / quality control (QA/QC)
cleaned on an annual
Seitz
D
3.56 /a
basis
Pipeline cleaning QA/QC passing rate
>_95%
Seitz
99.39%
01: Slightly below goal. Met with contractor and will add a second CCTV
10% inspected
33.3 miles
truck for inspection work.
Pipeline inspected through
(150 miles per year
Seitz
Closed Circuit Television Program
or 37.5 miles per
FY 2023-24:
quarter)
71 miles
Uptime for vehicles
100%
Seitz
100%
Q1: On July 18, around 11:00 PM, Crowd Strike worldwide automatic update
Information system outages
99%
caused multiple servers and PCs to crash, preventing them from booting up.
affecting normal business operations
D
100% uptime
Mallory
Central San IT responded immediately. Critical systems were back online by 4
FY 2023-24: 98%
a.m. Remaining systems were online by 6 a.m. SCADA and pumping stations
were unaffected.
Q1: No data was lost.
Data backup and recovery
0 lost data
Mallory
100%
Warehouse stockouts of spares
Q1: We have had zero stockouts in terms of a request for an tiem, but said
linked to an asset
<_4
Gaines
0
item has a zero balance, thus we've had a 100% fill rate.
Q1: All new request -to -stock items have been filled within the time period of
Time to fulfill request -to -stock items
<30 days
Gaines
<30 days
s30 days.
Capital expenditures
as a percentage of capital budgeted
>_80%
Lopez / Mizuno
86.4%
cash flow including carry forward
>_6.0
0.1 miles
Q1. Staff vacancies have been filled and new projects out to bid.
Miles of sewers replaced
(running three-year
Mestetsky /
Lopez
FY 2023-24:
average)
0.6 miles
Page 20
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 96 of 102
Page 23 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
KEY METRICS
Metric
Target
Responsible
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Person(s)
>_11 miles per year
Ongoing. Prepared National Plant Services inspection contract package.
All large diameter gravity sewers inspected
in FY 2024-25
Lawson /
Waples / Frost /
within 5 years
>_15 miles per year
Gemmell
in FY 2025-26
All large diameter siphons cleaned and inspected
Lawson /
Ongoing. Prepared National Plant Services inspection contract package.
within 3 years
? 3 siphons per year
Waples / Frost /
Gemmell
All pump station force mains
?5 force mains
Lawson /
Ongoing. Prepared National Plant Services inspection contract package.
inspected within 5 years
per year
Waples / Frost /
starting FY 2025-26
Gemmell
10.25 business
days
Average time to execute Engineering
<_2 weeks (10
King
agreements from complete package submittal
business days)
FY 2023-24:
5.47 business days
Contract renewals executed on time
100%
King
100%
for uninterrupted service
Page 21
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 97 of 102
Page 24 of 26
' FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 1
GOAL 7 — INNOVATION AND AGILITY
Optimize performance through continuous improvement
Strategy
Initiative
Key Success Measures
Responsible
15t
2nd
3rd
Q4 /
Activities/Performance in Achieving KSM
Person(s)
QTR
QTR
QTR
FY-End
(Status, Comments, and Exceptions)
Assess and pilot test digital monitoring, machine learning, and artificial intelligence
Goel / Meyer /
01: Looking at several individual asset condition
monitoring solutions with Al and ML. Also looking at ML
for plant assets.
Weer
and Al as part of asset health initiative.
Develop new reporting dashboards to track strategic, tactical, and O&M
Q1: Asset Health Monitoring efforts continued with
Deploy improved monitoring and
performance metrics, tracking, and
performance metrics.
Goel
selection of tool expected in Q2.
analytics.
Q1: Pilot testing of Aquasight continues. Working with
Apply Data Analytics to
Identify Efficiencies
Identify process improvements and their potential efficiencies.
Goel
Operations and Maintenance staff as needed. On
schedule to complete in Q2.
Ongoing. Managers continue to review optimizations
Communicate progress and results on process measures.
Goel
progress on a quarterly basis.
Make improvements based on
Q1: The FYs 2021-23 Benchmarking Study is in
performance data.
Complete annual Benchmarking Study to assess organizational performance.
Gee / Leiber
production. Staff participates in the AWWA Benchmarking
Advisory Committee.
Initiate design for Secondary Clarifier Improvements to rehabilitate and replace
Goel
Ongoing. Condition assessment and pre -design efforts in
aged equipment, optimize flow split, and evaluate hydraulic baffles to improve
progress.
performance.
Develop Electrical Infrastructure Replacement Program to optimize the treatment
Ongoing evaluation within projects.
plant 12,000 V distribution system and replace existing electrical transformers and
Lopez / Meyer
Construct optimization -related
switchgear.
Plant improvements.
Operate and report findings of a Membrane Aerated Biofilm Reactor Intensification
Q1: Ongoing with completion expected November 2024.
Pilot to assess removing nitrogen in existing tankage.
Goel
Develop long-term solids handling strategy, including exploring feasibility, costs,
01: In progress with Brown & Caldwell with draft TM
and benefits of regionalization of fluidized beds.
Goel
expected to be complete in Q2.
01: FYs 2022-24 Optimizations Program Annual Report
Provide Optimizations Program Annual Reports to Board.
Gee / O'Malley
will be presented to Administration Committee in
December and the full Board in January.
Q1: On track for implementation in 02.
Implement
Organization -Wide
Administer an in-house treasury function.
Mizuno / Leiber
Optimization
Q1: Progress on developing general PO balance report to
Procurement system functionality optimizations/enhancements including develop
King / Mizuno
accompany capital PO and multi -year agreement reports,
of new reports, implementing contract drafting module, and others.
expected to be rolled to production in Q2. Significant
progress on contracts drafting module in Q1 as well.
Develop and implement asset on -boarding technical data flow, including a tracking
Q1: In process of consultant selection.
Support innovation in capital and
operational practices.
system.
Meyer
Document O&M standard operating procedures and Training Plan administrative
Meyer /Weer
Ongoing effort.
procedures.
Develop a 3-D representation of Solids 1A Perpetual As -Built reflecting adopted
Lopez
Ongoing, scope is being introduced to the construction
management team and designers.
BIM/CADD standards.
Ongoing effort.
Implement barcoding of plant assets to create legacy IDs.
Meyer
Page 22
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 98 of 102
Page 25 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 7 — INNOVATION AND AGILITY
Optimize performance through continuous improvement
Strategy
Initiative
Key Success Measures
Responsible
Person(s)
18t
QTR
2nd
QTR
3Td
QTR
Q4 /
FY-End
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
01: On Hold until performance improves on OPAL.
Evaluate, select, and implement new SSC development and billing software.
Gemmell / Mallory
/ Leiber
Continue to configure ERP system
to meet evolving needs.
Administer capital projects using EPM technology.
Lopez / Mizuno
Q1: Completed FY 24-25 adopted CIB interim allocations
utilizing new tool.
01: Staff continues to pilot test the appraisal process in
Launch electronic performance appraisal process.
Gee / O'Malley
the Oracle Goals and Performance module.
Q1: Team is reviewing top three potential vendors for
Execute Enterprise Asset Management roadmap.
Mallory
Enterprise Asset Health Monitoring project in November.
Q1: Stabilizing the current SCADA
Execute Supervisory Control and Data Acquisition roadmap.
Mallory
server/storage/networking infrastructure in preparation for
an RFP within the next year to upgrade SCADA software
Execute roadmaps to improve
enterprise governance of IT.
Execute Cybersecurity roadmap.
Mallory
01: We roadmapcontinue to make progress working through our
Q1: Treatment Plant migrated to VertiGIS in development
Execute Geographic Information Systems roadmap.
Mallory
environment; began GIS 3D/BIM Integration Pilot.
01: Held demo with Oracle Analytics. Contractor
Execute Business Intelligence - Data Governance roadmap.
Mallory
completed DB inventory. We will build a plan to remediate
findings.
Page 23
December 3, 2024 Regular ADMIN Committee Meeting Agenda Packet - Page 99 of 102
Page 26 of 26
ATTACHMENT 1
FY 2024-26 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 1: KEY SUCCESS MEASURES (KSMs) AND KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL 7 — INNOVATION AND AGILITY
Optimize operations for continuous improvement, and remain flexible and adaptable
Metric
Target
Responsible Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Reviews or pilot tests
of new and promising technology and
>3
Frost / Goel / Cunningham /
Ongoing.
Q1: Reviewing Subterra SewerScout technology for possible sewer tunnel
presentations of findings
All Managers
inspections. Optimization Division progressing MABR and Aquasight pilots.
Don't Just Fix It; Improve It
>20
Lee / Shima / Meyer
5
work orders completed
Ongoing. Managers log their optimizations quarterly and review them at
Completed optimizations
>_20
Gee / All Managers
Managers' Forum.
Page 24