HomeMy WebLinkAbout05-08-75 AGENDA BACKUPIV. Hearings
1
5/8/75
May 5, 1975
TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
FROM: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: HEARING ON CHANGES AND MODIFICATIONS ON LID 55
1. On April 17, 1975, Resolution No. 75-19, A Resolution of Intention
to Make Changes and Modifications, was adopted and the hearing set for
May 8, 1975.
2. Resolution was published in the Lafayette Sun.
3. HEARING - Protest is on reducing the assessment and increasing the
interest rate on bonds to 8%.
4. ADOPT RESOLUTION NO. ORDERING CHANGES AND MODIFICATIONS.
Respectfully submitted,
!:. A. Horstkotte, Jr.
General `tanager -Chief Engineer
VI. OLD -BUS. taw"'"'•
1
5/5175,
May 1, 1975
MEMORANDUM TO: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: AUTHORIZE $20,000.00 FOR PURCHASE OF PIPE FOR DISTRICT
PROJECT 2570, GAS LINE INSTALLATION FOR TREATMENT PLANT
(3900 L.F. 6.625 x 0.156 API 5L x 42 PIPE)
PROBLEM: In researching the availability of pipe specified by P.G. & E.
for this project, (3900 L.F. 6.625 x 0.156 API 5L x 42 Pipe), it is evident
a scarcity exists. Area distributors have only heavier wall pipe on hand
and fabricators do not expect to produce such pipe and have it available
much before mid -July this year, and even then production is not guaranteed.
BACKGROUND: Right of way clearance for the work will take 4-5 weeks once
notice is given to proceed. Actual construction time is estimated at
2 weeks. If the contractor waits until award of contract to order pipe,
construction could be delayed until late July or early August which is
undesirable in view of existing scheduled contract operations at the
treatment plant site.
The following tabulates the staff's findings on pipe availability.
DISTRIBUTORS:
FARRTCATORS:
Pacific Pipe Co., Oakland - no 0.156 wall pipe on hand, have
3600± 6.625 x 0.280 and would have to finish order with
X52 pipe.
Kaiser Steel - no 0.156 wall pipe on hand; may roll some in
June or July depending on demand. Coating available.
Earliest delivery - mid -July, early August.
U. S. Steel - no 0.156 in stock - no rolling planned, not
available coated. Do have 0.188 wall pipe in Provo, Utah,
stock. Must be coated elsewhere.
U. S.--Steel (0.188 wall pipe only) $10,850.00
Tax 750.00
Frt. (Provo, Utah, to Pittsburg, California) 610.00
Coating (Std. Pipe Protect. Co., Pittsburg, Ca) 2,115.00
Tax 135.00
Frt. (Pittsburg to site) 75.00
Sub Total (Pipe Only) $14,490.00
Incidentals (Fittings, etc.) 5,510.00
Estimated Total $20,000.00
As last resort, P.G. & E. was contacted and their Dakota yard can sell,
on purchase order, sufficient quantity of pipe as specified, however,
their supplies, too, are dwindling and the offer time is limited.
P.G. & E. (0.156 wall pipe, coated) $13,455.00
Tax 875.00
Frt. (Dakota, California to site) 200.00
Sub Total (Pipe Only) 14,530.06
Incidentals (Fittings, etc.) 5,470.00
Estimated Total $20,000.00
RECOMMENDATION: Authorize $20,000.00 for purchase of pipe directly from
P.G. & E. and contingent materials specified to be installed by contractor
for District Project 2570.
Respectfully submitted,
Jack L. Best
"•f:nager-Engineering Department
JLB:rm
Recommendation approved:
'A.'
G. Horstkotte,. Jr.
General Manager -Chief ngineer
May 2, 1975
VII. NEW BUS.
2 -
5/8/75
MEMORANDUM FOR: THE HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: AUTHORIZATION OF $75.00 FOR THE PACIFIC PIPE TOOL
COLLECTION SYSTEM SEMINAR
PROBLEM: This is one of the few pertinent courses available to
Maintenance personnel. I want to send 5 of our staff to this
seminar.
BACKGROUND: This is a one -day collection system seminar. Its purpose
is to present the newest ideas, techniques, innovations and equipment
in the maintenance field to the maintenance man.
RECOMMENDATION: Authorize attendance.
Respectfully submitted,
Robert H. Hinkson
Manager, Maintenance Department
RHH:yb
Recommendation Approved:
G.:A.orstkotte, Jr.
Gesera}' Manager -Chief En ineer
I
May 1, 1975
VII. New Bus.
2
5/l/75
MEMORANDUM TO: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: AUTHORIZE PREPARATION OF DRAFT EIR, DSP 2587,
TOPAZ LANE, PLEASANT HILL
PROBLEM: Satisfy the conditions of the District's Ordinance 95 implementing
the California Environmental Quality Act.
BACKGROUND: Mr. William Dahn has canvassed his neighborhood and has received
support from a majority of the owners in the area for the extension of a
public sewer main. Before the group of owners proceeds with the project,
they want to insure that the environmental impact requirements are satisfied.
Attached is the "Environmental Assessment" Exhibit B of Ordinance 95. Staff
study has shown that the project will have a significant effect on the
environment.
RECOMMENDATION: Approval. (Preparation of EIR will be by owners' consultants.)
Respectfully submitted,
W. C. Dalton
Deputy
General Manager -Chief Engineer
Recommendation Approved:
General Manager -Chief Engineer
JLB:rm
Attachments: Environmental Assessment
Map
' 3.2,14.0 r
3, 84 A�
Nl� '
T
i4t. Go.
r GE Pp • � '�-;- � lsE�' PGEi9S i
YCAZ
r
Ea _ Jesus
m.
Or9t -
•Ca..
Vq
i
CENTRAL CONTRA COSTA SANITARY DISTRICT
1250 Springbrook Road
.Walnut Creek, California 94596
ENVIRONMENTAL IMPACT ASSESSMENT
Name of P_roj_ect: 2587
Location: Topaz Lane, Pleasant Hill
Entitty gr.Person-Undertaking Project:
A. District:.
B. Other:
1. Name: William Dahn
2. Address: 619 Paso Nogal., Pleasant Hill
Staff Determination
. The District's staff, having undertaken and completed as initial study
of this project in accordance with Section 16-603 of the District's guide-
lines entitled, "Local Guidelines Implementing the California Environmental
Quality Act of 1970, as Amended," for the purpose of ascertaining whether
the proposed project might have a significant effect on the environment, has
reached the following conclusion:
( ) 1. The project :could:_mot have:;a signifiicant,.effect, oni the..:euvironm
ment; therefore, a negative declaration should be prepared.
X) 2. The project could.have a significant effect on the environment;
therefore, an EIR will be required.
May 1, 1975
Date
gene al Manager -Chief- gineer
2066-5-73
VII. NEW BUS.
3
5/1/75
May 1, 1975
MEMORANDUM FOR: HONORABLE MEMBERS OF THE BOARD OF DIRECTORS
VIA: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: AUTHORIZE $3,150.00 FOR PAYMENT OF SEWER ASSESSMENT
LID 54-1-3-17
PROBLEM: The final assessment spread did not reflect the reduction from
two assessment units to one assessment unit which was authorized by the
Board on September 20, 1973, subsequent to the protest submitted by
Patrick and Linda Furlong, the owners of the two parcels (17 and 18).
As of this date, there appears to be a sufficient surplus in the LID 54
account to cover this.
RECOMMENDATION: Approval.
Respectfully submitted,
Jack L. Best
Manager -Engineering
JLB:rm
Recommendation Approved:
G:'A. Horstkotte, Jr.
General Manager -Chief Engineer
.