Loading...
HomeMy WebLinkAbout03.b. Award construction contract in the amount of $2,342,000 to C. Overaa & Co. for Steam Renovations, Phase 1A DP 100032; authorize general manager to amend agreement with HDR Engineering; Amend agreement with MWH Constructors, Inc. and exempt from CEQPage 1 of 10 Item 3.b. DCENTRALSAN BOARD OF DIRECTORS POSITION PAPER DRAFT MEETING DATE: OCTOBER 2, 2024 SUBJECT: REVIEW DRAFT POSITION PAPER TO AWARD A CONSTRUCTION CONTRACT I N THE AMOUNT OF $2,342,000 TO C. OVERAA & CO., THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER FOR THE STEAM RENOVATIONS, PHASE 1A, DISTRICT PROJECT 100032; AUTHORIZE THE GENERAL MANAGER TO AMEND A PROFESSIONAL ENGINEERING SERVICES (PES)AGREEMENT WITH HDR ENGINEERING, INC. INAN AMOUNT OF $200,000 FOR ENGINEERING SERVICES DURING CONSTRUCTION; AMEND APES AGREEMENT WITH MWH CONSTRUCTORS, I NC. I N AN AMOUNT OF $300,000 FOR CONSTRUCTION MANAGEMENT SERVICES; AND CONSIDER THE PROJECT EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) SUBMITTED BY: MIKE ZUBRZYCKI, ASSOCIATE ENGINEER NATHAN HODGES, SENIOR ENGINEER INITIATING DEPARTMENT: ENGINEERING AND TECHNICAL SERVICES - CAPITAL PROJECTS REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER GREG NORBY, DEPUTY GM - ENGINEERING & OPERATIONS ROGER S. BAILEY, GENERAL MANAGER ISSUE On September 4, 2024, two sealed bids were received and opened for the construction of the Steam Renovations, Phase 1A, District Project 100032 (Phase 1A). The Board of Directors (Board) can award a contract or reject bids within 50 days of bid opening. Authorization is also required for the General Manager to amend a PES agreement for amounts greater than $200,000. BACKGROUND The existing steam system is a vital and critical component of Central San's wastewater treatment plant energy profile as it is designed to capture and recover energy from the heat produced by electrical power generation and furnace operations. The steam system was recently investigated under detailed condition assessments and has significant overall life remaining in the system. However, several safety improvements and or replacement items have been identified and included into the Capital Program to maximize the system's performance and useful life. October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 14 of 42 Page 2 of 10 On March 3, 2022, the Board authorized the Steam Renovations, Phase 1 project and a PES with HDR Engineering, Inc. (HDR) for final design and bidding services. On May 16, 2024, the Board authorized an amendment to the PES agreement with HDR, and the Steam Renovations, Phase 1 project was split into two phases, 1 A and 1 B. Phase 1 A focuses on needed improvements to the steam system in the Pump & Blower Building, while Phase 1 B is located in the Solids Conditioning Building. The Phase 1 B design is expected to be completed later this year. The Phase 1 A work consists of relocation of several pipelines, replacement of two waste steam heat exchangers, and tube replacement in the two aeration turbine exhaust condensers. The condensers, installed in 1976 and located under the aeration turbines, use final effluent to cool steam into condensate. Each condenser contains 2,300 copper cooling tubes that are heavily corroded. This project will rehabilitate the condensers with retubing, internal recoating, and recertification. Staff and HDR prepared the Phase 1A project documents. The project was advertised on July 16 and July 23, 2024. The engineer's estimate for construction was $2,500,000. Two sealed bids at $2,342,000 and $3,095,000 were received and publicly opened on September 4, 2024. Capital Projects conducted a technical and commercial review of the bids and determined that C. Overaa & Co. is the lowest responsive and responsible bidder with a bid amount of $2,342,000. A summary of bids received is shown in Attachment 2. Central San, with the support of MW H Constructors, I nc. (MW H), will administer the construction contract and provide construction management of the project. MW H is currently working with C. Overaa & Co. and staff on the large Solids Handling Facility I mprovements, Phase 1 A project and including these services is the most efficient and best use of resources for the project. Using the Solids Handling Facility I mprovements, Phase 1 A project construction management team will be more efficient for Central San staff (Engineering and Operations) for this construction work. It will reduce the number of meetings and coordination that would be typical if other parties were involved. MW H's current agreement is valued at $11,000,000 and including the proposed services at $300,000 will result in a new cost ceiling of $11,300,000. HDR will provide engineering services during construction, submittal review, and inspection on an as - needed basis. HDR's fee for construction phase services is $200,000; the current agreement is valued at $1,850,000 and including the proposed services will result in a new cost ceiling of $2,050,000. HDR was hired to perform the construction duties; however, Central San does not include the costs until at time of award. Pending award of the project, the General Manager shall execute the Contract Documents subject to submittal requirements. CEQA Staff has concluded that the project is exempt from CEQA under Central San's CEQA Guidelines because it includes minor alterations to existing public facilities involving no expansion of use. Approval of this project will establish the Board's independent finding that this project is exempt from CEQA. ALTERNATIVES/CONSIDERATIONS Reject all bids, which is not recommended, due to the need to replace equipment and rehabilitate the condensers. Other options for construction management exist; however, the action recommended by staff is the best alternative for costs and staff delivery. October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 15 of 42 Page 3 of 10 FINANCIAL IMPACTS The total estimated project cost is $5,408,000, which includes planning, design, consultant, construction contract, contingency, and staff costs as detailed in Attachment 3. Note that this cost includes the Uniform Public Construction Cost Accounting Act Project 2022-12, Phase 1 A, and Phase 1 B costs through August 2024. The amount is expected to increase as the Phase 1 B design progresses. The project is listed in the Fiscal Year 2024-25 Budget on page 275, Steam Renovations, Phase 1, District Project 100032, with a total estimated project budget of $12,500,000. There is adequate funding this and next fiscal year for the project improvements as approximately $4,100,000 is available in the budget to date. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this matter at its meeting on October 2, 2024 and recommended RECOMMENDED BOARD ACTION Staff recommends the following Board actions: 1. Award a construction contract in the amount of $2,342,000 for the construction of Steam Renovations, Phase 1A, District Project 100032 to C. Overaa & Co., the lowest responsive and responsible bidder; 2. Authorize the General Manager to amend a professional engineering services agreement with HDR Engineering, Inc. in an amount of $200,000 for engineering services during construction; 3. Authorize the General Manager to amend a professional engineering services agreement with MW H Constructors, I nc. in an amount of $300,000 for construction management services; and 4. Find that District Project 100032 is exempt from CEQA. Strategic Plan re -In GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations, Strategy 4 - Identify and advance sustainability initiatives, including reducing energy usage and emissions GOAL FIVE: Safety and Security Strategy 1 - Reduce and eliminate risks of injury or illness, Strategy 2 - Protect Personnel and assets from threats and emergencies GOAL SIX: Infrastructure Reliability Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program ATTACHMENTS: 1. Project Location Map 2. Summary of Bids 3. Post-B id/P reconstruction Estimate 4. Presentation October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 16 of 42 Page 4 of 10 N i 0 150 300 FEET a PROJECT AREA CONSTRUCTION ACCESS ROUTING /�,I PUMP AND BLOWER BUILDING E I F: � 7@muC-S DW CENTRAL G S i'7A COSTA S.kN.7kVY O1S3 i K � n \ NORTH CLARIFIERS AERATION TANKS SOUTH BASIN El STEAM RENOVATIONS PHASE 1A DISTRICT PROJECT 100032 NORTH BASIN 41 n�F0 e Attachment 1 Page 5 of 10 ATTACHMENT 2 STEAM RENOVATIONS, PHASE 1A DISTRICT PROJECT 100032 SUMMARY OF BIDS PROJECT NO.: 100032 NO. OF ADDENDA: 2 DATE/TIME: SEPTEMBER 4, 2024/2:00 PM PROJECT NAME: STEAM RENOVATIONS, PHASE 1A PROJECT MANAGER: MIKE ZUBRZYCKI PROJECT LOCATION: 5019 IMHOFF PLACE. MARTINEZ. CALIFORNIA ENGINEER'S ESTIMATE: $2,500,000 NO. BIDDER BID PRICE 1 C. Overaa & Co. $2,342,000 Richmond, California 94801 2 Saboo Inc. $3,095,000 Brentwood, California 94513 BIDS OPENED BY /s/ Katie Young DATE: September 4, 2024/2 PM October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 18 of 42 Page 6 of 10 ATTACHMENT 3 STEAM RENOVATIONS, PHASE 1A DISTRICT PROJECT 100032 POST-BID/PRECONSTRUCTION ESTIMATE % Of Construction No. Item Description Amounts Cost 1 CONSTRUCTION a. Construction Contract 1A $ 2,342,000 b. Contingency at 15% $ 351,000 SUBTOTAL - CONSTRUCTION $ 2,693,000 100% 2 CONSTRUCTION MANAGEMENT a. District Forces - Operations $ 30,000 - Construction Management $ 75,000 b. Outside Services - HDR Engineering, Inc. (ESDC and Inspection) $ 200,000 - MWH Constructors, Inc. (CM Services) $ 300,000 - Specialty Coating Inspection (Blanket Agreement) $ 20,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $ 625,000 23% 3 PREBID EXPENDITURES ESTIMATE* a. Engineering (Staff and Consultant) Phase 1A $ 300,000 11% b. Engineering (Staff and Consultant) Phase 1B $ 1,595,000 c. UPCCAA Project 2022-012 Safety Related Work $ 195,000 SUBTOTAL - PREBID EXPENDITURES $ 2,090,000 4 TOTAL ESTIMATED PROJECT COST $ 5,408,000 * Original project scope has been phased to UPCCAA 2022-012, 1A and 1 B. Design costs for all phases have been included in the estimate. October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 19 of 42 Attachment 4 Page 7 of 10 Background Steam Renovations, Phase 1 project authorized in March 2022 Steam Renovations, Phase 1 split into two phases in May 2024 Phase 1A— Pump & Blower Building Phase 1B — Solids Conditioning Building 100% design expected in November 2024 Work completed through Uniform Public Construction Cost Accounting Act (UPCCAA) Project 2022-012 New boiler sample stations installed Safety related work October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 20 of 42 Page 8 of 10 Phase 1A: Pump & Blower Building Scope Waste Steam Exchangers Aeration Blower Turbine Condensers Phase 1A: Pump & Blower Building Scope Temporary relocation of 20" 3W pipe, installation of new 20" valve, relocation of miscellaneous pipelines to provide access Replacement of 2,300 copper tubes in each condenser, coating of tube sheets and water boxes, cutting and welding shell Inspection, testing, and recertification of condensers Aeration Blower Turbine Condensers (Internal) October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 21 of 42 2 Page 9 of 10 Bid Results Advertised on July 16 and July 23, 2024 Engineer's Estimate: $2,500,000 Bid Opening on September 4, 2024 Two bids received: C. Overaa & Co. was low bidder at $2,342,000 Saboo Inc. was second bidder at $3,095,000 Total Budget Current total estimated project cost is $5,408,000 Includes planning, design, consultant, construction contract, contingency, and staff costs i Includes UPCCAA Project 2022-012, Phase 1A, and Phase 16 costs through August 2024 Project is listed in Fiscal Year 2024-25 Budget er '�'I Steam Renovations, Phase 1 listed on p. 275 Total estimated project budget is $12,500,000 I � I Adequate funding this and next fiscal year, with approximately $4,100,000 available in the allocated budget to date October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 22 of 42 3 Page 10 of 10 Recommended Board Action Award a construction contract in the amount of $2,342,000 for the construction of Steam Renovations, Phase 1A, District Project 100032 to C. Overaa & Co., the lowest responsive and responsible bidder; Authorize the General Manager to amend a professional engineering services (PES) agreement in an amount of $200,000 with HDR Engineering, Inc. for engineering services during construction; Authorize the General Manager to amend a PES agreement in an amount of $300,000 with MWH Constructors, Inc. for construction management services; and Find that the project is exempt from CEQA. Questions October 2, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 23 of 42 4