HomeMy WebLinkAbout11. Award a construction contract in the amount of $665,676 to Mesa Energy Systems, Inc., for the Headworks Chiller Replacement District Project 100010O��ENTRAL
MEETING DATE: AUGUST 15, 2024
BOARD OF DIRECTORS
POSITION PAPER
Page 1 of 7
Item 11.
SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $665,676 TO
MESA ENERGY SYSTEMS, INC., THE LOWEST RESPONSIVE AND
RESPONSIBLE BIDDER FOR THE HEADWORKS CHILLER
REPLACEMENT, DISTRICT PROJECT 100010; AUTHORIZE THE GENERAL
MANAGER TO EXECUTE THE CONTRACT DOCUMENTS SUBJECT TO
SUBMITTAL REQUIREMENTS; AND CONSIDER PROJECT EXEMPT FROM
THE CALIFORNIA ENVIRONMENTAL QUALITYACT (CEQA)
SUBMITTED BY:
INITIATING DEPARTMENT:
NANCY MOLINA, ASSOCIATE ENGINEER ENGINEERINGAND TECHNICAL SERVICES -
NATHAN HODGES, SENIOR ENGINEER CAPITAL PROJECTS
REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
GREG NORBY, DEPUTY GM - ENGINEERING & OPERATIONS
Roger S. Bailey
General Manager
ISSUE
On July 16, 2024, three sealed bids were received and opened for the construction of the Headworks
Chiller Replacement, District Project 100010 (Project). The Board of Directors (Board) must award the
contract or reject bids within 50 days of the bid opening.
BACKGROUND
The Headworks Control Building (Headworks) is a critical facility at the wastewater treatment plant in
Martinez used to pump and convey all influent flows from the collection system to the primary process
facilities and/or the wet weather basins during peak rain events. Headworks houses six Influent pumps and
motors, their associated variable frequency drives, major electrical gear, electrical systems for the
automated bar screens, screenings handling, and disposal facility. To cool and maintain safe operating
temperatures for the electrical equipment, Headworks has an existing 50 -ton chiller (chiller) as part of the
HVAC system serving the building. The chiller is located on the roof and also serves the cooling needs for
August 15, 2024 Regular Board Meeting Agenda Packet - Page 43 of 189
Page 2 of 7
the operator control room.
The chiller began to fail last year and currently is out of service. Operations installed a rental chiller and will
continue to use the temporary system until the chiller can be replaced and upgraded.
This Project will replace the chiller and associated components and upgrade the controls. In addition, the
scope of work includes upgrades that will allow for future permanent connections for more accessible
power and backup systems (rental or fixed). The project site is identified in Attachment No. 1.
Central San, Taylor Engineering (HVAC Specialist), and Complete Project Solutions, Inc. (Structural)
prepared the plans and specifications for the Project. The Engineer's Estimate for construction was
$420,000. This Project was advertised on June 12 and June 17, 2024. Three sealed bids ranging from
$665,676 to $867,000 were received and publicly opened on July 16, 2024. The Capital Projects Division
conducted a technical and commercial review of the bids and determined that Mesa Energy Systems, Inc.
(Mesa) is the lowest responsive and responsible bidder with a bid amount of $665,676. References for
Mesa were contacted, and staff received satisfactory feedback. A summary of bids received is shown in
Attachment No. 2.
The lowest bid received was approximately 58 -percent above the engineers estimate and was due to the
new chiller and electrical work costs being higher than anticipated. Staff is recommending to award to
Mesa based on receiving several bids from qualified bidders and that Central San continues to incur rental
chiller costs of $7,000 a month.
Central San will administer the construction contract and provide contract administration, office
engineering, manage consultant services, inspection, and submittal.
CEQA:
Staff has concluded that this Project is exempt from the CEQA under Central San's CEQA Guidelines
Section because it involves minor alterations to existing public facilities involving no expansion of use.
Approval of this Project will establish the Board's independent finding that this Project is exempt from
CEQA.
ALTERNATIVES/CONSIDERATIONS
Reject all bids, which is not recommended, due to the need to replace the Headworks chiller and to stop
incurring rental fees associated with the temporary system. Rebidding the project will likely not result in any
cost savings.
FINANCIAL IMPACTS
The total estimated project cost is $950,000 which includes planning, design, construction contract,
contingency, consultant, and staff time as detailed in Attachment No. 3.
The chiller replacement was identified under the Air Conditioning and Lighting Renovations (AC &
Lighting). This title was renamed to the current Project name to replace the Headworks chiller. The scope
and implementation of the AC & Lighting has changed, as the lighting will be handled under a PG&E
lighting program using the Operating budget. The air conditioning replacements will be handled under
other Treatment Plant Program projects.
The Project requires $875,000 to be completed and staff is recommending to use the Capital
Improvement Budget contingency account, which has adequate funds remaining. To date, there is
$1,480,000 available for the current fiscal year. Pending award, the remaining contingency funds will be
$605,000, as detailed in Attachment No. 4.
August 15, 2024 Regular Board Meeting Agenda Packet - Page 44 of 189
Page 3 of 7
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this matter at its meeting on August 7, 2024 and
recommended approval.
RECOMMENDED BOARD ACTION
Award a construction contract in the amount of $665,676 to Mesa Energy Systems, I nc., the lowest
responsive and responsible bidder for the Headworks Chiller Replacement, District Project 100010;
authorize the General Manager to execute the Contract Documents subject to submittal requirements; and
consider project exempt from the California Environmental Quality Act (CEQA).
Strategic Plan Tie -In
GOAL ONE: Customer and Community
Strategy 1— Deliver high-quality customer service
GOAL TWO: Environmental Stewardship
Strategy 1 - Achieve compliance in all regulations, Strategy 4 - Identify and advance sustainability initiatives, including
reducing energy usage and emissions
GOAL FIVE: Safety and Security
Strategy 2 - Protect personnel and assets from threats and emergencies
GOAL SIX: Infrastructure Reliability
Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program
ATTACHMENTS:
1. Project Location Map
2. Summary of Bids
3. Post-Bid/P reconstruction Estimate
4. CI B Contingency Summary
August 15, 2024 Regular Board Meeting Agenda Packet - Page 45 of 189
N
i
0 150 300
FEET
PROJECT AREA
CONSTRUCTION
ACCESS ROUTING
/ �,I
CFF
CMN
NORTH
BASIN
Page 4 of 7
v
CNORTH P o `\0
LARIFIERS
O�
O
AERATION
TANKS
AyO,�� O SOUTH 02
BASIN ,
O SOUTH O
�•e
CLARIFIERS
O O
O \\\ t
O
O
n
0 EADWORK�
BUILDING
�O PRIMARY
o TANKS
680
as
4
CENTRAL SAN Attachment
HEADWORKS CHILLER REPLACEMENT 1
' DISTRICT PROJECT100010
Page 5 of 7
ATTACHMENT 2
HEADWORKS CHILLER REPLACEMENT
DISTRICT PROJECT 100010
SUMMARY OF BIDS
PROJECT NO.: 100010 NO. OF ADDENDA: 2 DATE/TIME: JULY 16, 2024/2 PM
PROJECT NAME: HEADWORKS CHILLER REPLACEMENT
PROJECT MANAGER: NANCY MOLINA
PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ, CA 94553
ENGINEER'S EST.: $420,000
NO.
BIDDER
BID PRICE
1
Mesa Energy Systems, Inc.
$665,676
San Leandro, California 94577
2
S&H Construction, Inc.
$698,600
Fremont, California 94538
3
C. Overaa & Co.
$867000
Richmond, California 94801
'
BIDS OPENED BY: /s/ Katie Young
August 15, 2024 Regular Board Meeting Agenda Packet - Page 47 of 189
DATE: July 16, 2024
Page 6 of 7
ATTACHMENT 3
HEADWORKS CHILLER REPLACEMENT
DISTRICT PROJECT 100010
POST-BID/PRECONSTRUCTION ESTIMATE
No.
Item Description
Amounts
% of
Construction
Cost
1
CONSTRUCTION
a. Construction Contract
$665,676
b. Contingency at 15%
$99,324
SUBTOTAL - CONSTRUCTION
$765,000
100%
2
CONSTRUCTION MANAGEMENT
a. District Forces
- Risk Management/IT/Controls
$25,000
- Operations
$15,000
- Construction Management/General Inspection
$50,000
b. Outside Services
-Specialty Inspection
$5,000
-Taylor Engineering (ESDC)
$10,000
-Complete Project Solutions (ESDC)
$5,000
SUBTOTAL - CONSTRUCTION MANAGEMENT
$110,000
14%
3
PREBID EXPENDITURES
a. Engineering (Staff and Consultant)
$75,000
SUBTOTAL - PREBID EXPENDITURES
$75,000
10%
4
TOTAL ESTIMATED PROJECT COST
$950,000
August 15, 2024 Regular Board Meeting Agenda Packet - Page 48 of 189
Page 7 of 7
ATTACHMENT NO. 4
CIB CONTINGENCY SUMMARY
FY 2024-25 CIB Contingency:
Original Amount $ 5,000,000
Large Diameter Pipeline Inspection Program, Phase 1, DP 8443, Transfer $ (1,200,000)
Filter Plant & Clearwell Improvements, Phase 1A, DP 7361, Transfer $ (2,320,000)
Headworks Chiller Replacement, DP 100010, Transfer (Pending) $ (875,000)
Remaining amount available: $ 605,000