Capital Projects Quarterly Status Report
APRIL - JUNE 2024
r, '�►" r
WW
�s
Since 1946, Central Contra Costa Sanitary District (Central San) has provided safe and
reliable wastewater collection and treatment for residents in central Contra Costa
County. Today we serve over 481,600 residents and 3,000 businesses in 147 square
miles. Our services include supplying recycled water for parks and golf courses,
providing both commercial and residential recycled water pickup programs, operating a
household hazardous waste collection facility and running a sophisticated water quality
laboratory. Our core mission is to protect public health and the environment, and our
customers can count on us for vital services 24 hours a day, every day.
Central San's infrastructure includes a 1,500-mile collection system and a treatment
plant that have been well maintained, but due to their advanced ages, now require
replacements and upgrades. Already, the equipment at the plant and in the system have
been extended well beyond their typical useful life due to responsible and robust
maintenance practices. Some of the collection system facilities are over 100 years old,
and many are over 50 years old. The treatment plant facilities were primarily
constructed in the 1970s and some are now at the point where maintenance alone
cannot maintain reliable performance. These recommended extensive replacement and
upgrade projects will provide for continued reliable operation. Central San funds an
extensive Capital Improvement Program (CIP) designed prepare, maintain, and enhance
Central San's assets; meet regulatory requirements, accommodate the community
needs; and protect public health and the environment. Capital improvement are
construction or renovation activities that add value to Central San's fixed assets
(pipelines, budlings, facilities, and equipment) or significantly extend their useful life.
This report summarizes the CIP's progress and highlights accomplishments from April to
June 2024.
Project Highlight
PROJECT NAME
Project Description, Benefit, Project Milestones,
Progress, and other key achievements.
How the CIP Delivers Projects
The CIP uses Design -bid -build model. Design -bid -build is a commonly used delivery method in which an owner first procures
a professional engineering firm to prepare detailed design plans and specifications for a project. The owner then solicits bids
for the project and procures a general contractor to construct the project based on the design completed by the engineer.
Appr°ve Confirm Authorization APPMe Authorization Authorization Substantial Final
Project Protect To Proceed Preliminary to Bid To Award Completion Acceptance
Altemative Design
Conceptual Preliminary
y
Project ConcepI Deiailed I Bid & Award II construction
Post-
Nternatiue Construction &
Soaping (Technology) Adesign r Design Design li� contract ,AcommissicningiNt construction II
C I P PROJECTS
This update outlines accomplishments for the past quarter in two sections: Projects in and Projects in Construction.
For projects in construction and post -construction phases, the CIP uses cost and schedule baselines monitored through the
District's Capital Project Management System.
Projects in Design
• Collection System Program
Pumping Station
Project 1 Design Progress during this period
Project 2
Project 2 Design Progress during this period
• Treatment System Program
Walnut Creek/Grayson Creek Levee
Design Progress during this period
Steam and Aeration Blower Systems Renovations
Project 2 Design Progress during this period
UV Disinfection Replacement
Project 3 Design Progress during this period
• General Improvement
• Project 1
Project 1 Design Progress during this period
• Project 2
Project 2 Design Progress during this period
• Recycled Water Program
• Filter Plant & Clearwell Improvements — Phase 1 B
Project 1 Design Progress during this period
• Project 2
`Project 2 Design Progress during this period
HOW ARE WE DOING?
Key Performance Indicators
(KPIs) Year -to -Date:
LEGEND
2 *GRAVITY SEWERS
TOe.
SturIIfSawtws-K.--ihuI%-v-w41Li, 'WIdLedi0
the ntxi �4 K{+}:p mAarolhrr la7 n:: ry: .: :rm7lifed
volin then m I Din 25veers.
1
4
NIIIIIIIIIIIII' . w, . I -
3 PUMP STATIONS
�11;t�4 _k
Rump StMiwd-5Y 1d: HPIV Ilm uls Eo She pueT
"y':;Im�alrim1wdWrihtrKCIfr,Cyou. ShtI»gN
Or"L'L'"" IN Irlldbiidlim cr the ianiew, Mellhti
rhlse foul pmjeLls rclrcseul apgwirsdAdF9Fu1[be
dP }S nyhon VL UMP slit on rCO.yN
+ _ S
N
E'+ 1E{C�EffNTREAr`L }A
L 1 1 Y L L AREA
SERVICEL \E l
{iRAYII}5l wLll}
\j
I
.WAiTEWLTER COLLECTIOH &
SAN RAN
TREir+ TNT iNP I IMISEHOI F+
liAQ-"NL'Ai5. w+.SE F I M IWI s LILwnL %
PROW IDEU
WMTE—TW TrLln7.uIr lr nnll 14FIri-
irKWE; WCOk7RACT
■ I Ell I W 11 ILm:11 0111LY
y
! PL
vC NTPwL 5r HE ME &iAXT IO%
GULLEHNG. TREATMENT fLhr•E S: HI 1W
FAC tLITY
vrMLL'UTIMr iywirA} OPrKATKN5
FkCILITY
Page 6 of 13
Capital Projects Quarterly Report I APR — JUN2024
1
SAFETY
0 Incidents
EXPENDITURE
On Target
SCHEDULE
On Target
3 Pumping Station Upgrades - Ph 2A
2
q.000.000
D,000.000
t0,000,Om
88888880 088-
0 Incidents
EXPENDITURE
On Target
SCHEDULE
On Target
4 Walnut Creek Sewer Renovation
Purpose: To address aging Purpose: To replace and renovate
infrastructure and reliability needs at the small diameter sewers within the
Fairview and Maltby Pumping Stations. city of Walnut Creek and
unincorporated Walnut Creek.
The project includes replacing corroded
steel dry pits with new wet wells at the
Fairview and Maltby Pumping Stations,
along with backup generators,
instrumentation, flow meters, pumps,
valves, gates, all piping and concrete, major electrical controls
per Arc Flash Study recommendations, worn control panels with
seismic bracing, and enhancing safety devices such as gas
detection systems and eye wash stations.
SAFETY
0 Incidents
EXPENDITURE
On Target
SCHEDULE
On Target
Project Budget: $24.7 million
Expected Completion Date: MMM YYYY
Update:
During this period,
The Walnut Creek Sewer Renovation —
Phase 16 Project will replace or
rehabilitate up to approximately 10,000
feet of small diameter sewers located in
both public right-of-way and easements. This project includes a
creek crossing.
SAFETY Project Budget: $6.4 million
• Expected Completion Date: MMM YYYY
0Incidents Update:
EXPENDITURE During this period,
On Target
SCHEDULE
On Target
Page 7 of 13
Capital Projects Quarterly Report I APR — JUN2024
Projects in Construction - Treatment Plant
Q AGING WRASTRUCTVRE
O CAPACITY
O REGULATORY
@5SUSTAINABILI1
reeu�P �atmFm�p,�a:mmeRma mm :EAR
<a,ia+�m:amtln�mmr:.a.lmp m..i:m�upg�:�,a.b,w sa�eo�ainom�e
gel.lr�n..to:.pla.:n..�,:.m.«emaz: n. e�ld wo ��.•�
t s«enmya.tRlu Ren.bilhstive Replaxdanr,amea�.nxmaam:wenapunw
f uV neWnmem:Replateulna+iolntli:mf:mion.ynern
r 1 nmu�wl.a W,�.e.,,:..+<
""`"�'"`f'e"n`u'�.rnm ��
a �
x'dW�1'aedRMH py.evPwaealyno:nmreevuvmemamiheTuen,a.nmpeem
u.wnlamsyaumwpa,e«Rema<a geamblmvearnma�e�m�amrea.t.pua
lase:opmligcanv::wmrenv.
� s w .� al,x .�b�rw.a rea a„mor..�a e=xa�:�aom�l
oua.waal.5l:.i o...a a I..
a vrn�vwr Up�af:•e:fml�u � irtret:��rrm'�'�'•ml x
e.aeaen�litwxeo
a w+�woe
v..1V�atie�sa
F x.kY:edaed ltHlnexmr:xroavMumpkne.M r�„ate; NAHIila[tM1emeM[nexu:cr�l
panty an 9uorsp .�Mizp
bervrtendarnmc
e9.steH Ya n,icaebeel���xwe:al:�_e�morm.uElv.w
low,f.m.e..asamH�.:o���moe<o:nam��.ama:nwe<,:.,tn�fds.:em:..
vwamarYav�hrbadfrymnc Atl
acer,,.totne,.er.,,�,m..nm�„ w,.ma v mrel r
Y Claa.rcall Rnfl*oeam.nx Reolacetlevwzll linrvedre¢anaNftwzt;atltl xwgcXlenver.
f aVMyevwRa: adtlltm'IIR Wmwm WtlwmelaNawaANfrel
�wnt�
�..tn,
ACN'A lwval ltO b�lYilircshnmeit:Hun�q�eaai%NemiulyenN�d
tl•.�n bad wamwaretNvntM1e MNIn9 Wsinzaw
m ReRav�Nevyaea YM1brp:olealM 6�aaM1.e�z
--aatAlllmpnovenrerna
e tvf�.arnt
e.r.ba..rnkmr�ia�n:�.iewe�.Rw...md.nd�..po.. p..b�+s�e„v.
. e ..p'n M.
It Bll[11NbeveIL3:Impkmmtnrhlnilremwal upgradabmtluteammWa��
m�.laol...:e �m,Baf�Odtl w.aea ¢�M1vpv
11 HSM'MvelvRp ledY4:�dM119nslrnglM1was1e f16Wlttcelvin9fadMy wtlM1
•advicen re
t tnea
napnospxwusn irtlryas[M unrK•
1~_
np pam sm m-Rm.efaottlesto remo:z
Iwwabw[n.yvver..esdaror.a.d.•
catrsmvaamE mvpYq ConcevltEGl.•
gepa rmagHmeRegCC:elvw•ewp:wttl M1ome SQD-vm: am:m e.tnt,ewd
19 �
�eplx;e me mwvs rumdlnnuem pumpaxuClmmdtLlCmbttn.waaum
16 -
mn�ant p�mprwwmt,K.mFt mm�.
� sr..e1 ppssNn
Page 8 of 13
Capital Projects Quarterly Report I APR — JUN2024
Solids Handling Facility Improvements
- Ph 1A
Purpose: To rehabilitate and replace,
the sludge dewatering centrifuges,
cake pumps, and furnace air pollution
control equipment. M
The project involves replacing the wet
scrubber with a Venturi scrubber
,�y��i_� ■'M�r capable of waste heat boiler bypass,
replacingOntrifuges and cake pumps, upgrading furnace
burners, replacing electrical and control systems to
accommodate new equipment, and performing seismic
upgrades in Solids Phase 1 B.
?ct Budget: $41.5 million
acted Completion Date: MMN
Y
ate:
OI \
During this period
Aeration Basins Diffuser Replacement - Ph 1
Purpose: To replace the existing
aeration tanks' diffusers to increase
aeration system performance and
a; optimize the activated sludge process.
MMW The project involves mechanical
rehabilitation, concrete repairs, and
seismic improvements to extend the
life of aeration basins and diffuser systems. It includes replacing all
diffusers and some air piping, optimizing sludge process, upgrading
controls for better air flow, and replacing large underground
aeration valves with accessible concrete structures. Phase 1
covers two aeration basins, with Phase 2 covering the remaining
two. Seismic upgrades are included in Phase 1.
Project Budget: $13.5 million
Expected Completion Date: MMM YYYY
Update:
➢ During this period,
Projects in Construction — General Improvements
Vehicle Replacement Program FY2O16-26
Purpose: To provide safe
and cost-effective vehicle
replacement.
The following vehicles are
being considered in FY
2023-24:
'/2 Ton 4x2 Truck (2),
'h Ton 4x4 Truck (6), 3/4 Ton 4x2 Truck (1), Vactor Hydro -Vac
and Water Recycler Unit (1), Midsize 4x2 Truck (1) and
Electric Vehicle upgrades as available
Project Budget: $7 million
Expected Completion Date: MMM YYYY
Update:
Electric Vehicles Charging Infrastructure - Ph.1
Purpose:
To install electric vehicle charging
stations (EVCS) infrastructure at
Central San's facilities.
This project, the first of three phases,
will extend electrical infrastructure at
Central San's Martinez campus and
Pumping Stations. It will install
charging stations at the Laboratory,
Annex Building, Warehouse, and
Collection System Operations, with
the potential to include Moraga and
San Ramon Pumping Stations if
funds allow. The following phases are
planned for 2030 and 2035.
Project Budget: $1.3 million
Expected Completion Date: MMM YYYY
Update:
L
$150
$130
$110
$90
$70
$50
$30
$10
-$10
Program Budget
Performance
Summary
Sewer Construction Fund (SCF) Budget,
Commitments and Financial Capacity
1
1
1
i 0 I 1
� 1 !
1 1
i53.75i i i
i
{ j j iif7 j
i
1 i i
i 1
1 1
i 1
22/23 23/24 24125
1=1Approved and Projected Budget per FY Fiscal Year
IMIAdditional capacity with contemplated rate increases
(not vet approved)
rMJRernainingcapacitywithexistingrates
M� Committed already (contracted)
Existing SCf Revenue (includes growth in non-55C revenue but no SSC rate increases)
$150
1 I
$13❑
N 1
1 44
I
$11a
1 �
$90
I 1
i I i
1
$70
I 1
I 1
j 1 I
95
$54
IIt
1 1
1 1
I 1
1 1
$30
l 1
1 1
i
$10
25/26
-$10
Page 11 of 13
Capital Projects Quarterly Report I APR — JUN2024
r�
$150
$140
$130
$120
$110
$100
$90
$ao
$70
%0
$50
$40
$30
$20
$10
July
Fiscal Year 2023-2024
Program Budget Performance
Summary
Budget to Actual Spending Trend
Sewer Construction Fund
(in millions)
$149.6
$J2G1
#
r
r r r $130.3
r
iJ
rr �J.A
� xc
�r
r +
#rt
August September Dunker Nrnember December January Februar; March April
#Budget Target!90}5 of Budget} —F Projected
May lure
0
Capital Projects Quarterly Report I APR — JUN2024
Page 12 of 13
M6101101IN IQ
Glossary
Beneficial Use When a C17project rs eornplete rrt accordance with cont
occupied by the City, it has achieved beneficial use.
A renewable energy source produced by the breakdown of sewage waste M" the "absence of oxygen.
Biogas is composed of methane, carbon dioxide and small amounts of hydrogen sulfide.
Treated sewage sludge.
ndS ..... Open acreage used by wastewater treatment plants as a buffer between plant operations and
nearby communities. Bufferlands minimize odor and operational impacts on plant neighbors and
often serve as wildlife habitat.
The process of assuring that all systems and components of a facility, building or plant arc
design € 6stalied, tested, operated and maintained according to the owner's requireme
Dissolved air flotation thickener to=i ks is pj e-ir flotation, or DAF, is a treatment p
clarifies wastewater by removing suspended rrtMer.
uted control system. A computerized system that allows treatment plant staff to remotely
monitor and control treatment processes.
EIR Environmental Impact Report. A public docume"N"Tdtjuired under the California Environmental
rmit program regulates point sources such as pipes and other conveyances that discharge
Ilutants into water. In California, NPDES permits for the discharge of treated wastewater
ued by the Regional Water Quality Control Boards.
Polymer
Preliminary The preparatory wastewater treatment stage, in which influent passes through headworks, which
Wastewater Water that enters the sanitary sewer system for treatment at a pollution control plant
...............................................................................................
Wastewater Cake Sludge that is compressed after dewatering.
WAS Waste -activated sludge, or the excess quantity of bacteria and microbes removed from the
secondary wastewater treatment process.
Page 13 of 13