MEETINGDATE: JULY15,2024
SUBJECT: REVIEW DRAFT POSITION PAPER TO 1)AWARD A CONSTRUCTION
CONTRACT IN THE AMOUNT OF $854,200 TO CATO'S GENERAL
ENGINEERING, INC., THE LOWEST RESPONSIVE AND RESPONSIBLE
BIDDER FOR THE PLANT OPERATIONS BUILDING (POB) PARKING LOT
IMPROVEMENTS, DISTRICT PROJECT 100067; 2)AUTHORIZE THE
GENERAL MANAGER TO EXECUTE THE PROJECT CONTRACT
DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS; AND 3) FIND
THAT THE PROJECT IS EXEMPT FROM THE CALIFORNIA
ENVIRONMENTAL QUALITYACT (CEQA)
SUBMITTED BY:
INITIATING DEPARTMENT:
NANCY MOLINA, ASSOCIATE ENGINEER ENGINEERINGAND TECHNICAL SERVICES-
NATHAN HODGES, SENIOR ENGINEER CAPITAL PROJECTS
REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
GREG NORBY, DEPUTY GM - ENGINEERING & OPERATIONS
ROGER S. BAILEY, GENERAL MANAGER
ISSUE
On July 2, 2024, four (4) sealed bids were received and opened for the construction of the POB Parking
Lot Improvements, District Project 100067 (Project). The Board of Directors (Board) must award the
contract or reject bids within 50 days of the bid opening. Authorization is also required for the General
Manager to execute a Construction Contract in an amount over $200,000.
BACKGROUND
The POB parking lot paving and security cameras have been in use for decades and have reached the
end of their useful life. As a result, this project will replace the vehicle automated gate, security equipment,
and upgrades; make paving and concrete sidewalk improvements; and install a new staff entrance for
Operations based on the latest security recommendation by Central San's consultant, Guidepost
Solutions.
In addition, this project will make improvements to the security badging system for employee access,
provide new camera locations and information technology improvements, add more parking spaces in the
POB lot, and expand the laboratory parking area. I n total, twenty-one (21) additional parking spaces will
result from the project. These new spaces are needed to accommodate employee parking as new security
July 15, 2024 Special EOPS Committee Meeting Agenda Packet - Page 68 of 85
Page 2 of 6
measures have been implemented to eliminate personal parking within the treatment plant and for event
parking at the Multipurpose room. The POB and Laboratory areas are known for contaminated soil; and
due to the likelihood of encountering contamination, removal and disposal of the materials have been
included into the scope of the contract as it pertains to the planned excavations. The project is located at
the Martinez campus outside the treatment plant, as shown in Attachment 1.
Central San prepared the plans and specifications for the project. The Engineer's Estimate for
construction was $750,000. This project was advertised on June 12 and June 17, 2024. Bids ranging from
$854,200 to $1,090,000 were received and publicly opened on July 2, 2024. The Capital Projects
Division conducted a technical and commercial review of the bids and determined that Cato's General
Engineering, I nc. is the lowest responsive and responsible bidder. The low bidder did not include a
Certificate of Reported Compliance for the I n-Use Off -Road Diesel -Fueled Fleets Program; however,
staff confirmed that the low bidder is properly registered and the failure to submit the certificate is
immaterial. References provided for Cato's General Engineering were contacted, and staff received
satisfactory feedback. A summary of bids received is shown in Attachment 2.
Central San will administer the construction contract and provide contract administration, office
engineering, inspection, and submittal review.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA):
Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA)
under Central San's CEQA Guidelines Section because it involves minor alterations to existing public
facilities involving no expansion of use. Approval of this project will establish the Board of Directors'
independent finding that this project is exempt from CEQA.
ALTERNATIVES/CONSIDERATIONS
Central San has hired a security consultant, Guidepost Solutions, to assist in planning, specifying,
prioritizing, and recommending security improvements. This project includes services provided by
Guidepost Solutions and the approval of Central San's Risk Management staff.
Reject all bids, which is not recommended due to the needed infrastructure replacement and improved
security measures for the project area.
FINANCIAL IMPACTS
The total estimated project cost is $1,347,000, which includes planning, design, consultant, construction
contract, contingency, and staff costs as detailed in Attachment 3.
This project is being funded by two budgets included in the Fiscal Year 2024-25 Budget. These budgets
are on page 300, Security Improvements District Project (DP) No. 100033, and page 305, POD Parking
Lot Improvements DP No. 100067. Combined, the total estimated budget to date is $1,350,000. There is
adequate funding this fiscal year for the project or proposed improvements.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this matter at its special meeting on July 15, 2024
and recommended
July 15, 2024 Special EOPS Committee Meeting Agenda Packet - Page 69 of 85
Page 3 of 6
RECOMMENDED BOARD ACTION
Staff recommends the following:
1. Award a construction contract in the amount of $854,200 for the construction of the POB Parking Lot
Improvements, District Project 100067 to Cato's General Engineering, Inc., the lowest responsive and
responsible bidder; and
2. Authorize the General Manager to execute the project contract documents subject to submittal
requirements; and
3. Find that the Project is exempt from CEQA.
Strategic Plan Tie -In
GOAL ONE: Customer and Community
Strategy 1— Deliver high -quality customer service
GOAL TWO: Environmental Stewardship
Strategy 1 - Achieve compliance in all regulations, Strategy 4 - Identify and advance sustainability initiatives, including
reducing energy usage and emissions
GOAL FIVE: Safety and Security
Strategy 2 - Protect Personnel and assets from threats and emergencies
GOAL SIX., Infrastructure Reliability
Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program
ATTACHMENTS:
1. Project Location Map
2. Summary of Bids
3. Post B id/P reconstruction Estimate
July 15, 2024 Special EOPS Committee Meeting Agenda Packet - Page 70 of 85
Page 4 of 6
N
i
0 150 300
FEET
PROJECT AREA
CENTRALSAN
,,A4Z0-0`Dh-.-
CENTRAL C OMTk4 :d;'iA :1nN:F,;RY tir- c
FILTER
PLANT
U \MNOFF
�n
CN
ORTH P o
ARIFIE�
n�
O
\ AERATION
C TANKS
SOUTH
BASIN
0
POB PARKING LOT IMPROVEMENTS
DISTRICT PROJECT100067
NORTH
BASIN
O
e
n
T7 V� (
Attachment
1
Page 5 of 6
ATTACHMENT 2
POB PARKING LOT IMPROVEMENTS
DISTRICT PROJECT 100067
SUMMARY OF BIDS
PROJECT NO.: 100067 NO. OF ADDENDA: 2 DATE/TIME: JULY 2, 2024/2:00 PM
PROJECT NAME: POB PARKING LOT IMPROVEMENTS
PROJECT MANAGER: NANCY MOLINA
PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ CA
ENGINEER'S ESTIMATE: $750,000
NO.
BIDDER
BID PRICE
1
Cato's General Engineering, Inc.
$854,200
Hayward, CA 94541
2
S&H Construction, Inc.
$898,600
Fremont, CA 94538
3
Kerex Engineering
$900,000
Martinez, CA 94553
4
C. Overaa & Co.
$1,090,000
Richmond, CA 94801
BIDS OPENED BY: /s/Eileen Hansen
DATE: July 2, 2024 at 2:00 PM
July 15, 2024 Special EOPS Committee Meeting Agenda Packet - Page 72 of 85
Page 6 of 6
ATTACHMENT 3
POB PARKING LOT IMPROVEMENTS
DISTRICT PROJECT 100067
POST-BID/PRECONSTRUCTION ESTIMATE
No.
Item Description
Amounts
% Of
Construction
Cost
1
CONSTRUCTION
a. Construction Contract
$854,200
b. Contingency at 15%
$128,800
SUBTOTAL - CONSTRUCTION
$983,000
100%
2
CONSTRUCTION MANAGEMENT
a. District Forces
- Risk Management/IT/Ops
$25,000
- Construction Management
$70,000
Inspection
$150,000
b. Outside Services
- Specialty Inspection
$25,000
- Convergint
$25,000
SUBTOTAL - CONSTRUCTION MANAGEMENT
$295,000
30%
3
PREBID EXPENDITURES
a. Engineering (Staff and Consultant)
$69,000
SUBTOTAL - PREBID EXPENDITURES
$69,000
7%
4
TOTAL ESTIMATED PROJECT COST
$1,347,000
July 15, 2024 Special EOPS Committee Meeting Agenda Packet - Page 73 of 85