Loading...
HomeMy WebLinkAbout03.c. ADVISE THE BOARD OF THE CLOSEOUT OF THE SEWER TV INSPECTION PROJECT, DISTRICT PROJECT 5547Central Contra Costa Sanitary District ' BOARD OF DIRECTORS , POSITION PAPER Board Meeting Date: June 17, 2010 ~ No.: 3.c. Consent Calendar Type of Action: INFORMATIONAL subject: ADVISE THE BOARD OF THE CLOSEOUT OF THE SEWER TV INSPECTION PROJECT, DISTRICT PROJECT 5547 Submitted By: Initiating Dept/Div.: Tom Godsey, Associate Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: ~~~,~ nn /~ ~~~~ ~ -"' t~~ N . H Q~9tG.~L T. Godsey M. Penny A. Antkowiak A. Farrell es .Kelly, neral Manager ISSUE: All work has been completed on the Sewer TV Inspection Project, District Project 5547, and this project can now be closed out. RECOMMENDATION: Close out the project. FINANCIAL IMPACTS: This closeout will result in approximately $351,210 being returned to the Collection System Program. Attachment 1 shows the project expenditures by category. ALTERNATIVES/CONSIDERATIONS: Not applicable. BACKGROUND: In 2002, the District began the Sewer TV Inspection Program. The intention of this program was to assess the condition of the collection system by televising every sewer in the District. The scope of work was bid in seven (7) different phases. Almost the entire service area has been inspected and the data has been used for planning sewer renovation projects. Outstanding work entails completing complex segments (force mains, siphons, and tunnels). The sewer inspection. program included extensive coordination with Collection System Operations (CSO) as hundreds of sewer system defects were discovered and communicated to CSO. Follow-up work will include evaluating sewer manhole conditions and repairs, addressing easement encroachments, and using the results in an asset management plan for the collection system. In accordance with the District's SSMP requirement, the results will also be used to establish a future sewer television inspection schedule. The details of the future inspection program will be presented to the Board for input prior to implementation. N:\PESUP\Cbradley\POSITION PAPERS\Godsey\5547 Closeout PP.doc Page 1 of 3 POSITION PAPER Board Meeting Date: June 17, 2010 subJeor. ADVISE THE BOARD OF THE CLOSEOUT OF THE SEWER TV INSPECTION PROJECT, DISTRICT PROJECT 5547 The Board of Directors authorized the award of service contracts for this work to Roto-Rooter on August 9, 2001; April 17, 2003; July 15, 2004; June 2, 2005; June 7, 2007; September 4, 2008; and August 4, 2009. In all cases, Roto-Rooter was the lowest cost of several bidders. The Contractor was issued Notices to Proceed that were effective from 2002 through 2008, with a completion date for the final phases (Phase 6 and Phase A = Minicam) of June 30, 2010. The original contracts were unit price agreements with estimated quantities of work. There were no cost change orders. The total amount paid to the Contractor for all seven phases was $6,101,544. The total authorized budget for the project was $7,792,000, which included a contingency of $15,000. The total project cost was $7,440,790, which is approximately 4.5 percent less than the budgeted amount. The project closeout will result in $351,210 being returned to the Collection System Program (see Attachment 1 for Expenditure Summary). RECOMMENDED BOARD ACTION: This item is presented to the Board of Directors for information. No action is necessary. N:\PESUP\Cbradley\POSITION PAPERS\Godsey\5547 Closeout PP.doc Page 2 of 3 ATTACHMENT1 SEWER TV INSPECTION DISTRICT PROJECT 5547 EXPENDITURE SUMMARY ACTIVITY COST Total Budget $7,792,000 Total Cost of Seven Service Contracts $6,101,544 Change Orders $0 Change Order % of Construction 0% Total Amount of Seven Individual Contracts $6,101,544 Engineering, Design, CM, Admin. $1,339,246 Engineering, Design, CM, Admin. - % of Construction 22% TOTAL PROJECT EXPENDITURES $7,440,790 Amount to be Returned to the Collection System Program $351,210 N:\PESUP\Cbradley\POSITION PAPERS\Godsey\5547 Closeout PP.doc Page 3 Of 3