Loading...
HomeMy WebLinkAbout05.a.1. AWARD A CONSTRUCTION CONTRACT WITH MCNAMARA AND SMALLMAN CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE HALL DRIVE SEWER RENOVATIONS, PHASE 2B, DISTRICT PROJECT NO. 5932 Central Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: May 20, 2010 No.: S.a. Bids and Awards Type of Action: AWARD CONSTRUCTION CONTRACT/AUTHORIZE EXECUTION OF CONTRACT DOCUMENTS Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH MCNAMARA AND SMALLMAN CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE HALL DRIVE SEWER RENOVATIONS, PHASE 2B, DISTRICT PROJECT NO. 5932 Submitted By: Initiating Dept./Div.: Nancy Molina, Assistant Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: A ~M _ ~~ - N. Molina Rozul T. i ecki .Farrell ~ m Ily, eneral Manager ISSUE: On May 5, 2010, two (2) sealed bids were received and opened for the construction of the Hall Drive Sewer Renovations, Phase 2B, District Project No. 5932. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt.from the California Environmental Quality Act (CEQA), award a construction contract, and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $1,611,000, including design, bid price, contingency, and construction management. ALTERNATIVES/CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: In 1991, the Hall Drive Sewer Improvements, Phase 2A, DP 4331 A, constructed a deep sewer main in Hall Drive, Orinda. The sewer was installed using the traditional open-cut method and construction was extremely disruptive to the neighborhood. The second half of the project, Phase 2B, was delayed due to concerns of disruption to the neighborhood. N:\PESUP1Cbradley\POSITION PAPERS\Molina\5932 -Award Contract PP- Hall Dr Ph 2B.doc Page 1 of 6 POSITION PAPER Board Meeting Date: May 20, 2010 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH MCNAMARA AND SMALLMAN CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE HALL DRIVE SEWER RENOVATIONS, PHASE 2B, DISTRICT PROJECT NO. 5932 ~, The current Hall Drive Sewer Renovations, Phase 2B Project, will renovate or replace 2,600 linear feet of 6-inch sewer lines within easements. The existing rear yard easement sewer crosses several creeks and is located in unstable soil. Construction of these sewers will involve close cooperation with customers for site access and property restoration. The Phase 26 Project will construct new sewers in front-yard easements and tie them into the deep main within Hall Drive. The new sewers will be installed. using horizontal directional drilling, a trenchless technology method. The house laterals will be rerouted around or under the homes from the rear yard sewer to the new sewer in the front yard. At 200 Hall Drive, the homeowner will install a private sewer lift station in lieu of aDistrict-installed gravity sewer lateral, portions of which would have been installed aboveground. The District will reimburse the property owner for the cost of the lift station, which is estimated at $25,000. The project will also replace a line on Queensbrook Place and a line on Camino Encinas (see Attachment 1). District staff prepared the plans and specifications for the project. The Engineer's estimate for construction of the Hall Drive Sewer Renovations, Phase 2B, is $850,000. This project was advertised on April 16 and 21, 2010. Two (2) sealed bids, $741,870 and $798,557, were received and publicly opened on May 5, 2010. Only two bids were received due to the specialized nature of the horizontal directional drilling trenchless technology. The Engineering Department conducted a technical and commercial review of the bids and determined that McNamara and Smallman Construction, Inc. is the lowest responsive bidder with a bid amount of $741,870. A summary of bids received is shown in Attachment 2. The District will administer the construction contract and will provide contract administration, survey, office engineering, and submittal review. Inspection services will be provided by JN Engineering, a consultant. An agreement with JN Engineering is the subject of a separate position paper. The funds required to complete this project, as shown in Attachment 3, are $1,306,470. The total cost of the Hall Drive Sewer Renovations, Phase 2B, is anticipated to be $1,611,470. This project is included in the fiscal year (FY) 2009-10 Capital Improvement Budget (CIB) on pages CS-21. Staff has conducted acash-flow analysis of the Collection System Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines, Section 15302, since it involves replacement of existing facilities with the same purpose and level of activity as the N:\PESUP\Cbradley\POSITION PAPERS\Molina\5932 -Award Contract PP- Hall Dr Ph 26.doc Page 2 of 6 POSITION PAPER Board Meeting Date: May 20, 2010 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH MCNAMARA AND SMALLMAN CONSTRUCTION, INC. FOR THE CONSTRUCTION OF THE HALL DRIVE SEWER RENOVATIONS, PHASE 2B, DISTRICT PROJECT NO. 5932 facilities being replaced. Authorization of the construction contract for this project will establish the Board of Directors' independent finding that the project is exempt from CEQA. RECOMMENDED BOARD ACTION: Find that the project is exempt from CEQA, award a construction contract in the amount of $741,870 for the construction of the Hall Drive Sewer Renovations, Phase 2B, District Project No. 5932, to McNamara and Smallman Construction, Inc., the lowest responsive bidder, and authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. N:\PESUP\Cbradley\POSITION PAPERS\Molina\5932 -Award Contract PP- Hall Dr Ph 2B.doc Page 3 of 6 CAMINO ENCINAS SITE ORINDA ~qY HALL DR JN SITE 1 LOCATION MAP .., N.T.S. ,'\ ~ ,Q ~R r ~. •: T \ \ I N FEET \. LEGEND: NEW SEWER ty~ ~•~•~ ABANDONED SEWER r , ~~~~~• EXISTING SEWER Central Contra Costa Sanitary District .Drawing No. HALL DRIVE SEWER RENOVATION PROJECT PHASE 26 - CCCSD DP 5932 Page 4 of 6 ATTACHMENT2 HALL DRIVE SEWER RENOVATIONS, PHASE 2B DISTRICT PROJECT 5932 SUMMARY OF BIDS PROJECT NO.: 5932 DATE: MAY 5, 2010 PROJECT NAME: HALL DRIVE SEWER RENOVATIONS. PHASE 26 PROJECT LOCATION: ORINDA NO. OF ADDENDA: 1 ENGINEER EST.: $850,000 BIDDER BID PRICE McNamara & Smallman Construction Inc. $741,870.00 1756 Holmes Street Livermore, CA 94550 California Trenchless, Inc. $798,557.00 2283 Dunn Road Hayward, CA 94545 $. $ $ BIDS OPENED BY/s/ Elaine Boehme DATE May 5, 2010 N:\PESUP\Cbradley\POSITION PAPERS\Molina\5932 -Award Contract PP- Hall Dr Ph 2B.doc Page 5 Of 6 m N W W ~ a a 2 ~ aNy y" ~ W Z~Z ~ZO H ~ U ~ ~ W ~ W ~ !n ~ ~ Z Sao W ~ V W~a N H . Wy_p ~ ~ m , ~ ~ J y J 0 Q a N O U c O e u o e o e v ° o 7 ~ ~ M LLY M V ~ tD ~ ~ ~ N ~ V N C O U 0 0 0 ° a o .- ui o fD M r ~ ~ o ° 0 0 o N N N O O C N O O ~ r G T w r w w ~ 0 0 0 o 0 0 0 0 o o O N O O O O aD V O O O O O O O O r OO O ~O i0 f0 N O O ~ O ~ 7 R ~ N r tq M f~ ~- r ~ M a 0 n ~ f9 ip /fl N r M fA w w w w ~ z J a W p O W U F Q y y N O ~, o -~ ~ Z a = W ~ ° C ~ a U' ~ w u i a ~ . ~ j a Z F- E m o Z ¢ m ~' w v O W ~ ~ n ` 0 ~ ~ p W w ayi g rn ~ H a u Z Q Z p o ~ w m y w a ~ 3 ~ a o z C N c O 0 ' O ~ C C O 0' O - - U is .A„ y Z H O A I w m N F K 'o D N O G a c C ~` fn Z r u U d N C Z = m ( j W U J o u '~ 2 ~ ~ .. o F C O ~ F' 10 >. W N Z C _ U 2 O ~ >, C « jp t U p O1 la F J a 0 7 O J O W N V d .0+ y 'C d ~ Z C~ d V Q J d ~ C ..• r J ~' C L ~ ~ « ~ W a , „ E U d ' a Z O = J ~ c c > F- j N m c c g s F - X c r m Q I - Q U a O Z ' a Q F U a ~ ~ o U G ~ rn ~ F- p U ~ a i v A c z c y Z . ~ a w ~ m H z D O m u v v a ~ ~ o. ¢a ° 2 `-' N ri v ui m r O a~ m m rL 0 m a` 0 d a m U m Q N m w a as z O F= rn a a m n` U a w w a z