Loading...
HomeMy WebLinkAbout03.i. ACCEPT THE CONTRACT WORK FOR THE NORTHERN PUMPINGCentral Contra Costa Sanitary District ' BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: Apr111,2010 No.: 3,i. Consent Calendar Type otAction: ACCEPT CONTRACT WORK/AUTHORIZE NOTICE OF COMPLETION subject: ACCEPT THE CONTRACT WORK FOR THE NORTHERN PUMPING STATION UPGRADES, DISTRICT PROJECT 5971, AND AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION Submitted By: Initiating Dept./Div.: Clint T. Shima, Associate Engineer Engineering /Capital Projects R~E6VIEyW~ED<AND RECO/MM/E~ ND~ED ~FOR~ BOARD ACTION: J~ C. Shima A. Antkowiak cki A. Farrell James .Kelly, Genera Manager ISSUE: Construction has been completed on the Northern Pumping Station Upgrades, District Project 5971, and the work is ready for acceptance. RECOMMENDATION: Accept the contract work for the Northern Pumping Station Upgrades, DP 5971, and authorize the filing of the Notice of Completion. FINANCIAL IMPACTS: None related to this action. ALTERNATIVES/CONSIDERATIONS: Not applicable. Filing the Notice of Completion is advisable under the California Civil Code, Section 3093. BACKGROUND: Pumping Station Operations staff identified a number of improvements needed at various pumping stations. At the Concord Industrial Pumping Station the project replaced obsolete variable frequency drives, installed a new grinder, and added other operational and safety improvements. The Clyde Pumping Station was equipped with a new standby generator and flood protection measures. An emergency bypass vault and pump connections were installed at the Martinez Pumping Station. A replacement bar screen was installed at Orinda Crossroads, and new valve vault covers were placed at Maltby Pumping Station. On June 4, 2009, the Board of Directors authorized the award of a contract for the construction of the project to California Trenchless, Inc. The Notice to Proceed was issued on June 24, 2009. The work was substantially completed on March 12, 2010. The remaining items of work consist of minor punch-list items, which do not affect the project acceptance. N:\PESUP\Cbradley\POSITION PAPERS\Shima\5971 PP Accepl Contract Work.doc Page 1 of 2 POSITION PAPER Board Meeting Date: April 1, 2010 Subject. ACCEPT THE CONTRACT WORK FOR THE NORTHERN PUMPING STATION UPGRADES, DISTRICT PROJECT 5971, AND AUTHORIZE THE FILING OF THE NOTICE OF COMPLETION Immediately upon acceptance, the Contractor is relieved of the duty of maintaining and protecting the Contract work. Guaranty and warranty periods required by the Contract and the statutory period for filing of liens and Stop Notices start on the date of acceptance by the Board of Directors. Final payment to the Contractor is made after expiration of the statutory period for filing of liens and Stop Notices, provided no liens or Stop Notices have been filed, and provided the punch-list items have been completed. The total authorized budget for the project is $1,361,000. The budget includes the cost of engineering design, District forces, contractor services, etc. An accounting of the project costs will be provided to the Board at the time of project closeout. It is appropriate to accept the contract work at this time. RECOMMENDED BOARD ACTION: Accept the contract work for the Northern Pumping Station Upgrades, District Project 5971, and authorize the filing of the Notice of Completion. N:\PESUP\Cbradley\POSITION PAPERS\Shima\5971 PP Accept Contract Work.doc Page 2 of 2