HomeMy WebLinkAbout06.a. Award a Construction Contract to R-E Corporation for the Construction of the SCB Mechanical Room Improvements (DP 7277) Central Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER Board Meeting Date: March 18, 2010 No.: 6.a. Bids and Awards Type of Action: AWARD CONSTRUCTION CONTRACT/AUTHORIZE EXECUTION OF CONTRACT DOCUMENTS subject: AWARD A CONSTRUCTION CONTRACT TO R-E CORPORATION AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS FOR THE CONSTRUCTION OF THE SCB MECHANICAL ROOM IMPROVEMENTS PROJECT, DISTRICT PROJECT 7277 Submitted By: Initiating Dept./Div.: Gary Rathunde, Associate Engineer Engineering /Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: Rathunde ~an ----~~%~~ r . art I mes KeIIY~ eneral Manager ISSUE: On February 16, 2010, eight sealed bids were received and opened for the construction. of the SCB Mechanical Room Improvements Project, District Project 7277. The Board of Directors must award the contract or reject bids within 50 days of the bid opening. Authorize the General Manager to execute the contract documents subject to SUBMITTAL requirements. RECOMMENDATION: Find that the project is exempt from the California Environmental Quality Act (CEQA), award a construction contract to R-E Corporation and authorize the General Manager to execute the Contract Documents subject to favorable review of insurance certificates, bond submittals, appropriate Contractor license, and any other required submittals (SUBMITTALS). FINANCIAL IMPACTS: Approximately $570,000 including design, bid price, contingency, and construction management. ALTERNATIVES/CONSIDERATIONS: Reject all bids, which is not recommended. BACKGROUND: The mechanical room located on the first floor of the Solids Conditioning Building (SCB) contains pumps, a chiller, steam and water piping, and an air-handling unit used to provide conditioned air to the Motor Control Center Room on the second floor and to various areas within the Furnace Control Room on the third floor. The chiller, pumps, and some piping were replaced during the SCB Ventilations Improvements, Phase 2 (DP 7227) to provide chilled water for new air handling units N:\PESUP\Position Papers\RathundeV277_Award_Contract_Final.doc Page 1 Of 6 POSITION PAPER Board Meeting Date: March 18, 2010 Subject. AWARD A CONSTRUCTION CONTRACT TO R-E CORPORATION AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS FOR THE CONSTRUCTION OF THE SCB MECHANICAL ROOM IMPROVEMENTS PROJECT, DISTRICT PROJECT 7277 . serving the centrifuge and cake pump areas. However, the original air-handling unit that was installed during the treatment plant expansion in the mid 1970s is still in service. The scope of work for this project includes design and construction to install a new air handling unit, a chilled water recirculation pump, and replace five existing roof top exhaust fans that have reached the end of their useful life. Attachment 1 shows the location of the project work. In June 2009, District staff executed a Professional Engineering Services agreement with Taylor Systems Engineering, Inc. (TSE) to prepare design drawings and specifications for improvements to the existing heating, ventilation, and air conditioning (HVAC) system. The Engineer's pre-bid estimate for construction cost was $260,000. This project was advertised on January 22 and 27, 2010. Eight sealed bids ranging from $316,675 to $424,500 were received and publicly opened on February 16, 2010. The Engineering Department conducted a technical and commercial review of the bids and determined that R-E Corporation is the lowest responsive bidder with a bid amount of $316,675. A summary of bids received is shown in Attachment 2. The higher than expected bid prices for the project are primarily due to two factors. First, price quotations received during the design phase for the HVAC control system were less than the quotes given to the contractors. These higher bid-day quotes from the control system supplier are attributed to changes in the scope of supply, more difficult electrical wiring than originally assumed, and additional programming and training requirements. Second, the engineer's estimate overlooked costs, such as mobilization/demobilization and preparation of record drawings. District staff will perform construction management and will provide contract administration, inspection, survey, office engineering, and submittal review. However, staff recommends retaining TSE to provide support services during construction because they prepared the plans and specifications and, therefore, has a solid understanding of the project design. Staff negotiated a contract amendment with TSE not to exceed $10,000. This will bring the total professional service contract with TSE to $46,000, which is within staff limits and, therefore, does not require Board action. The funds required to complete this project, as shown in Attachment 3, are $510,000. The total cost of the SCB Mechanical Room Improvements Project, District Project 7277, is anticipated to be $570,000. N:\PESUP\Position Papers\Rathunde\7277_Award_Contract_Final.doc Page 2 of 6 POSITION PAPER Board Meeting Date: March 18, 2010 subject. AWARD A CONSTRUCTION CONTRACT TO R-E CORPORATION AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS FOR THE CONSTRUCTION OF THE SCB MECHANICAL ROOM IMPROVEMENTS PROJECT, DISTRICT PROJECT 7277 This project is included in the fiscal year 2009-2010 Capital Improvement Budget (CIB) on pages TP-54 and TP-55. Staff has conducted acash-flow analysis of the Treatment Plant Program budget and concluded that adequate funds are available for this project. Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15301 since it involves minor alterations to an existing public facility involving negligible or no expansion of use, Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. RECOMMENDED BOARD ACTION: Staff recommends the following 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $316,675 for the construction of the SCB Mechanical Room Improvements Project, District Project 7277, to R-E Corporation the lowest responsive bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. N:\PESUP\Position Papers\Rathunde\7277_Award_Contract_Final.doc Page 3 of 6 ~~. IE ~~ ,,. ,. ~ \ ,,, I ~, I ~ ` ,,~ ,,,\ ,`., I f 1 I I ~. . ` o~aoo ': ~ I ~ ~ • ~ •,, i ,. ~ ~ )~~i ~ ~ SOLIDS ~`~ ~\ ~:\,\ ~.;~` ~~, ~ ~ ~ --~ ._ CONDITIONING i'~ \ `;~ ~ .(I 1 BUILDING i ~ t N I i ~. I '~ \':. ~~ . ,~~ ~ i~ ~~ I~I i ~ ~ i 4 ?i~ ,''; i l ~ ~ ~i' I ~ f ~i. S ~ I! •~~ ~, ~ I ~ ~ 'I I ~~ .r ,,__ ~' I `, , ~ ~ :...Y ...+..- ~. 111 f ~4,r" ~ .~~~~ 1~ - - ~~ .~i r~~ -. ~ - - ~, ., ~,i - ~ -- i ~ I r,. ,.- ~ ~ - ~ _..._..... b "l ~. ~... ~ .Std i~~«i, ..._~.,o-. _i ~ i ~ ~ ,\ , r ~ }~ I ~ ~ \ ~ - i_ ., ....... ~ i .......... if .~ D ~ 9 E - ~ B ~~ -~~-_, . ~ ~\ , , Q: ~ / ~ _ \\ ~i, ~~ Central Contra Costa Sanitary District SCB MECHANICAL ROOM IMPROVEMENTS ATTACHMENT ' DISTRICT PROJECT 7277 - 1 LOCATION MAP N:\PESUP\Position Papers\Rathunde\7277_Award Contract Riv..doc Pag@ 4 Of 6 ATTACHMENT 2 SCB MECHANICAL ROOM IMPROVEMENTS PROJECT DISTRICT PROJECT NO. 7277 SUMMARY OF BIDS PROJECT NO.: 7277 DATE/TIME: FEB. 16, 2010/2:00 PM PROJECT NAME: SCB MECHANICAL ROOM IMPROVEMENTS PROJECT PROJECT MANAGER: GARY E. RATHUNDE PROJECT LOCATION: MARTINEZ, CALIFORNIA ENGINEER EST.: 260 000 NO. BIDDER BID PRICE 1 R-E Corporation $316,675 250 Colgan Avenue Santa Rosa, CA 95402 707-545-5460 2 American Mechanical Services, Inc. (AMS) $326,000 1275 Boulevard Way Walnut Creek, CA 94595 925-946-9101 3 Smith Electric Service $332,949 1340 Betteravia Road Santa Maria, CA 93455 805-621-5000 4 American Air Conditioning, Plumbing & Heating $374,400 820 Aladdin Avenue San Leandro, CA 94577 510-351-7578 ~ 5 Bobo Construction, Inc. $378,000 9728 Kent Street _ Elk Grove, CA 95624 916-685-2285 6 Blocka Construction, Inc. $403,000 4455 Enterprise Street Fremont, CA 94538 510-657-3686 7 Martinez Sheet Metal $413,527 4040 Pacheco Boulevard Martinez, CA 94553 925-228-3380 8 Monterey Mechanical Company $424,500 8275 San Leandro Street Oakland, CA 94621 510-632-3173 BIDS OPENED BY /s/ Randall Muspraves DATE February 16, 2010 N:\PESUP\Position Papers\Rathunde\7277_Award Contract Riv..doc Page 5 of 6 F Z W W O M d F- ~ W O 2 ~ Q J ~a aZ a x U w m U N W F Q H N W Z F U 7 K F N Z O U w a 0 00 0 a n N F U W O a F U 0 .r 0 U c 0 U ° 0 0 ~ .., O r ~ M ~ ~ N C O U 0 O p O O p O O p O ~ N Efl ~ O O O ~ O O O O p CO rM M ~ ~ Q M EA ~ EA COM ~~ O 00 ~ ~ ~ M M O ~ M ~ V) EA N M ~ ~ H z W m c rn ~ c w w O ~ C U_ Q ~ ~ ~ ~ p c U ~ W o ~ .~ o- O w ~~ rn c 'c Z O o ~ w J w U H ~ N~ ~ ~ W ~ ~ Z N ~ U w ~ o ~ Q ~~ m ~ W w ~ ~ ~ N Q ~ m w ~ ~ ~ O ~ V U o Z Z ~ w ~ ~ Z U m 0 ~~ p ~ .. O ~ ~ ~ O o ~ U O ~° ~ w >, ~ w ~ -- d w O ~ Q H U ~ aci ~ ~ Q H U ~i ~ °- ... m~ .. ~ J Q d i° m ' ~ ~ O 2 ~ J a Q W rn ~ X .-- J O (n O O CD (n y U O O~ ~ m O W N O O J (n J Z UU~ Z O" ~ ~ U ~ O U m H Z 0~ O ~ ~ cA O co ~ cn d ca ~ ~ p LL Q O O .-- N M ~ ~ CO Z w 0 a~ rn m a