Loading...
HomeMy WebLinkAbout10.(Handout 3) Revised Exhibit 1 to Staff Report10. (Handout 3) CENTRAL CONTRA COSTA SANITARY DISTRICT ATTACHMENT 3 COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee % Change DEVELOPMENT Review of new sewer and recycled water plans and related documents; review of plans for and processing of residential and commercial permit applications; installer reimbursement of sewer construction costs from subsequent connectors; identification of right-of-way conflicts. (A-1) Application Fees: Basic Application (side sewer work, easement $170 $170 0.0% staking, permit renewal) Application for new sewer service - new parcel $352 $353 0.3% Application for new sewer service - existing parcel $255 $255 0.0% Commercial Application (for review of plans for a change in use or expansion of a commercial facility; $363 $363 0.0% includes up to one hour of plan review) Commercial Application - Each additional hour $183 $183 0.0% Overflow Protection Device Installation (OPD only) no charge no charge no change Side Sewer Cleanout installation (to facilitate $25 $25 no change installation of OPD only; permit not upgradable) Non -Residential Capacity Fee Installment $533 $540 ° 1.3/° Payment Program Application Fee Residential Capacity Fee Installment Program and $533 $540 1.3% Promissory Note Program Application Fee (A-2) Mainline Extensions: Plan Review (Sewer Service): Sewer Service Review (Base fee - up to 3 $3,825 $3,859 ° 0.9/o submittals) Restart Application (where design concept previously approved & complies with current Std $1,844 $1,860 0.9% Specs, up to 3 submittals Each additional hour $206 $209 1.50 Manhole only (design & plan review) $1,182 $1,185 0.3% Plan Review (Recycled Water): Recycled Water Review (Base fee - up to 8 hours) $3,457 $3,494 1.1% Each additional hour $206 $209 1.5% Recycled Water Connection only (design & plan $1,402 ° 1.4/o review)$1,382 Right of Way Document Review: Appurtenant Easements (Base fee - up to 3 $669 ° 2.0/° hours)$656 Subdivision Map (each) $605 $634 4.8% Separate Instrument (Base Fee) $779 $809 3.9% Each additional hour $219 $223 1.8% Page 1 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee IF % Change (A-3) Private Pumping System Plan Check: System Compatibility Review for Pump (up to 2 hours) $437 $446 ° 2.1/° Each additional hour $219 $223 1.8% (A-4) ISpecial Approvals $419 $419 0.0% (A-5) Annexation Fee (per District Code 6.08.030): New Annexations Actual Expense Actual Expense 1po change Annexation Recovery Fee $675 $676 1 0.1% (A-6) Reimbursement Accounts: Set-up fee $1,487 $1,492 0.3% Transaction fee $207 $207 0.0% (A-7) Special Studies: Base fee - up to hours; plus misc. costs $905 4 $921 1.8% -4 Each additional hour $185 $189 11 2.2% (A-8) Environmental Compliance Reviews: Environmental Compliance Business Review - base fee - up to 4 hours; includes plan review, site visit and inspection time $1,086 $1,086 0.0% Each additional hour $222 $222 0.0% Grease Variance Review (includes site visit) $469 $469 0.0% Environmental Compliance Enforcement Review and Inspection $587 $588 0.2% Page 2 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee % Change CONSTRUCTION INSPECTION Inspection of new sewer main construction and new sewer and recycled water connections and other related work on private property (includes TV inspection when appropriate). Hours of operation, including premium and holiday schedules, are available at.- t.www. www.centralsan. orp/pod/hours-directions (B-1) Inspections by type: Mainline base fee $1,001 $1,021 2.0% Mainline per foot (includes in-line manholes or $15.73 $16.04 2.0% structures) New Manhole or structure (e.g. recycled water $1,144 $1,144 ° 0.0% meter) Overflow Protection Device installation (OPD only) no charge no charge no change Side Sewer Cleanout installation (to facilitate $50 $50 no change installation of OPD onl Side Sewer Installation / Repair per 100 feet: $265 $265 0.0% Single Inspection Charge (e.g. sewer connection; encroachment verification; side sewer cap on property; tap and lateral (new or replacement); air $265 $265 0.0% test; reinspection; homeowner preconstruction inspection) Recycled water connection cross-testing $692 $700 1.2% Manhole tap; lateral abandonment at main; pipe bursting; trash enclosure w/o trap; side sewer CIPP $530 $530 0.0% repair; outdoor grease trap only Manhole Alteration; trash enclosure with trap; $795 $795 0.0% grease interceptor abandonment Outside pump installation $1,060 $1,060 0.0% Grease / Sand / Oil Interceptor $1,590 $1,590 0.0% (B-2) Overtime inspection: First Hour (if responding from off-site) $152 $153 0.7% Weekend/Holiday - 4 hour minimum $449 $453 0.9% Each additional hour $99 $100 1.0% (B-3) Inspection of non-permitted work; plus avoided $1,192 $1,192 0.0% charge(s) Page 3 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Application of Fee (B-4) INSPECTION CHARGES FOR NEW CONNECTIONS (Informational Only) Current procedure at the Permit Counter is to collect all connection and inspection fees for new construction when a structure's roof is on and the rough plumbing is installed ("Roof and Rough"). Under the new procedure, a developer can choose to: 1. Connect at Roof and Rough, or 2. Connect at building foundation following the procedures outlined in the Standard Specifications. For either scenario, connection fees will be due and payable prior to permit issuance (consistent with District Code). The changes affect Category (B) Construction Inspection as shown below: Residential Connections (up to and including four units) at Roof and Rough: This fee is for inspection of new residential units connecting to CCCSD's mainline after the structure's roof is on and $530 per unit $530 per unit 0.0% the rough plumbing has been installed. This fee includes: one building connection inspection and one side sewer inspection (up to 100 feet). Additional insipections and related fees may be re uired. Residential Connections (up to and including four units) at building foundation: This fee is for inspection of new residential units connecting to CCCSD's mainline prior to structure being roofed and rough plumbing being installed. This fee includes: $1,060 per unit $1,060 per unit o 0.0% one building connection inspection, one side sewer inspection (up to 100 feet), and two additional inspections as required per CCCSD Standard Specifications. Additional inspections and related fees maV be required. Commercial/Multiple Residential Connections (more than four units) at Roof and Rough: This fee is for inspection of new commercial or multiple residential units connecting to CCCSD's mainline after structure's roof is on and the rough plumbing $530 per unit $530 per unit 0.0% has been installed. This fee includes: one building connection inspection and one side sewer inspection (up to 100 feet). Additional inspections and related fees may be required. Commercial/Multiple Residential Connections (more than four units) at building foundation: This fee is for inspection of new commercial or multiple residential units connecting to CCCSD's mainline prior to structure being roofed and rough plumbing being installed. This fee includes: one $1,325 per unit $1,325 per unit 0.0% building connection inspection, one side sewer inspection (up to 100 feet), one pre-construction meeting, and two additional inspections as required per CCCSD Standard Specifications. Additional ins ections and related fees may be required. Page 4 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee % Change COLLECTION TV inspection of sewers conducted separate from a construction inspection activity; verification of sewer location and sewer service connection. (C-1) TV Inspection: Weekday, hourly rate $298 $302 1.3% Minimum Charge (2 hour minimum) $596 $604 1.3% Overtime - First Hour $213 $215 0.9% Overtime - Each Additional Hour $166 $169 1.8% Overtime - Weekend / Holiday (4 hour minimum) $711 $722 1.5% (C-2) Dye test $339 $342 0.9% (C-3) Collection system repair Actual Expense Actual Expense no change (C-4) Cancelled TV Inspection without prior notice $563 $567 0.7% (C-5) Sewer locating and marking $339 $342 0.9% • Establishing right-of-way agreements and resolving conflicts. (D-1) Process Quitclaim Deeds$1,267 $1,267 0.0% Process Quitclaim Deed - plat and legal by others $805 $807 0.2% (D-2) Process Real Property Agreement, License, or Easement: Base Fee - Up to 4 hours $1,251 $1,255 0.3% Each Additional Hour $168 $173 3.0% (D-3) Right-of-way hResearch / Encroachment Resolution Actual Expense Actual Expense no change (D-4) Right of Entry / Encroachment Permit Fee Base Fee - Up to 2 hours $457 $469 2.6% Each Additional Hour $168-4 $173 3.0% Page 5 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee % Change (E) MISCELLANEOUS District services provided for private sewer projects; interest rates for CCCSD programs; copying fees. (E-1) Engineering - private sewer projects Actual Expense Actual Expense no change (E-2) Soil evaluation - private sewer projects Actual Expense Actual Expense no change (E-3) Surveying Actual Expense Actual Expense no change Annual interest rate for CADs, Septic to (E-4) Sewer,Lateral Replacement, Non-residential 3.84% 4.50% 17.1% Capacity Fee Programs Multiplier to be applied to Alhambra Valley Assessment District (AVAD) 2010-11 Parcel (E-5) Assessment Amount listed in Ordinance 262 -Exhibit 1.11496 1.13916 2.2% B to determine AVAD Reimbursement Fee amounts applicable to connections in FY 2024-25. Multiplier to be applied to St. Mary's Road (E-6) Contractual Assessment District (CAD) 2011-1 1.01511 1.03714 2.2% Reimbursement Fees listed in Ordinance 279 -Exhibit B. Applicable to connections in FY 2024-25. (E-7) Returned Check / Insufficient Funds Fee $40 plus $40 plus no change bank fees bank fees Up to 10% of Up to 10% of unpaid amount unpaid amount (E-8) Delinquent / Late Payment Fee due plus 1.5% per due plus 1.5% per no change month on unpaid month on unpaid balance balance (E-9) Document / Plan Copying Fees: 8 1/2" x 11"; 8 1/2" x 14"; 11" x 17" (per sheet) $0.20 $0.20 0.0% 24" x 36" Plan (per sheet) $4.00 $4.00 0.0% CCCSD Standard Specifications $25.00 $25.00 0.0% CCCSD Standard Specifications (Pocket Guide) $5.00 $5.00 0.0% Page 6 Page 7 CENTRAL CONTRA COSTA SANITARY DISTRICT COMPARISON OF CURRENT & PROPOSED FEES & CHARGES FOR FY 2024-25 Fee Category Current Fee Proposed Fee % Change (F) INDUSTRIAL PERMIT FEES Permitting and inspection of industries and other commercial dischargers to ensure availability and use of pretreatment processes. (F-1) Class I Fees (Base fee plus cost of District's lab Actual Expense Actual Expense no change analysis) (F-2) Class II Fees (Base fee plus cost of District's lab $4,168 $4,168 0.0% analysis) (F-3) Class III Fees (Base fee plus cost of District's lab no charge no charge no change analysis) (F-4) Industrial user permit application fee no charge no charge no change (F-5) Special discharge permit application fee (*): No on-site inspection, no capacity review $385 $385 0.0% On-site inspection $952 $953 0.1% Additional charge for capacity review (Required $261 $270 o 3.4/o for discharges >50 m)(G) SEPTAGE -• Sampling and disposal of septic waste and grease. (G-1) Annual permit fee $1,532 $1,536 0.3% (G-2) Residential septic/toilet waste: < 2,000 gallons $40 + $0.15/gal. $40 + $0.15/gal. no change > 2,000 gallons $80 + $0.15/gal. $80 + $0.15/gal. no change (G-3) Restaurant grease waste: < 2,000 gallons $40 + $0.03/gal. $40 + $0.03/gal. no change > 2,000 gallons $80 + $0.03/gal. $80 + $0.03/gal. no change (*) Additional charges to be billed separately if staff time incurred is above that included in the base fee. (**) Other approved waste will be charged at the residential septic and portable toilet waste rate unless actual strength characteristics are provided. Page 7