Loading...
HomeMy WebLinkAbout05. Set a Public Hearing for June 20, 2024 at 2:30 p.m. to receive comments on confirming and levying final assessments for Houston Court Contractual Assessment District (CAD) No. 2022-1 in DanvilleItem 5. BOARD OF DI RECTORS POSIT ION PA PER M E E T ING D AT E:MAY 16, 2024 S UB J E C T: S E T A P UB L I C HE A R I NG F O R J UNE 20, 2024 AT 2:30 P.M. TO R E C E I V E C O MME NT S O N C O NF I R MI NG A ND L E V YI NG F I NA L A S S E S S ME NT S F O R HO US TO N C O URT C O NT R A C T UA L A S S E S S ME NT D I S T R I C T (C A D) NO. 2022-1 I N D A NV I L L E , D I R E C T I NG T HAT T HE F I S C A L YE A R 2024-25 A S S E S S ME NT S B E C O L L E C T E D O N T HE C O NT R A C O S TA C O UNT Y TA X R O L L ; A ND C O NS I D E R I NG A D O P T I O N O F A N UNC O D I F I E D O R D I NA NC E TO E S TA B L I S H R E I MB UR S E ME NT F E E S F O R T HE P R O P E RT I E S W HI C H C O UL D D I R E C T LY C O NNE C T TO J O B 6745 S UB M I T T E D B Y: G E O F F MI C HA L C Z YK, MA NA G E ME NT A NA LYS T I NI T I AT I NG D E PART M E NT: E NG I NE E R I NG A ND T E C HNI C A L S E RV I C E S- P D S-R AT E S A ND F E E S RE V IE WE D B Y:T HO MA S B R I G HT B I L L , S E NI O R E NG I NE E R D A NE A G E MME L L , P L A NNI NG & D E V E L O P ME NT S E RV I C E S D I V I S I O N MA NA G E R G R E G NO R B Y, D E P UT Y G E NE R A L MA NA G E R - O P E R AT I O NS R oger S . B ailey General Manager IS S UE A public hearing and a resolution are required to direct that the F iscal Year 2024-25 assessment be collected on the Contra Costa County tax roll and to establish reimbursement fees f or f uture connectors. B AC K G RO UND On J uly 7, 2022, the Board of Directors (Board) ordered the construction of sanitary sewer improvements for a portion of the Houston Court neighborhood in D anville. T he work to install the improvements has been completed, final costs have been totaled, and final assessments f or each property can be May 16, 2024 Regular Board Meeting Agenda Packet - Page 39 of 500 Page 1 of 3 determined. T he B oard will be requested to confirm and levy these f inal assessments and to authorize a Notice of A ssessment. After being given an opportunity to pay of f their C A D assessment in a lump sum without interest, participating property owners may instead choose to pay f or sewer improvements over a 20-year period at the Central S an approved and published financing rate, currently 2.61 percent interest. Payments are to be collected by placing assessments on each property owner's tax bill. T he Board must conduct a public hearing prior to considering placement of charges and assessments on the Contra Costa County tax roll for collection and to establish the reimbursement f ees for new connectors to repay participants for covering non-participant costs. ALT E RNAT I V E S /C O NS I D E RAT IO NS T he B oard may elect to choose a dif f erent date f or the public hearing. A public hearing must be held if assessments and charges are to be placed on the C ounty tax roll for collection and C A D participants are to be reimbursed f or covering non-participant costs. F I NANC IAL I M PAC T S None by setting the pubic hearing. C O M M I T T E E RE C O M M E ND AT IO N T he Houston Court C A D was presented to the E ngineering and Operations Committee on D ecember 7, 2022. T he Committee recommended approval of the Resolution of I ntention to form the C A D . T he Board approved the R esolution of I ntention on J anuary 19, 2023. RE C O M M E ND E D B O ARD AC T I O N Set a public hearing for J une 20, 2024 at 2:30 p.m. to receive comments on confirming and levying f inal assessments for Houston C ourt C A D No. 2022-1 in Danville, direct that the F iscal Year 2024-25 assessment be collected on the C ontra C osta C ounty tax roll, and consider adoption of an ordinance (uncodified) to establish reimbursement fees f or the properties which could directly connect to J ob 6745 (Houston C ourt C A D 2022-1). Strategic Plan Tie-I n G O A L O N E: Customer and C ommunity Strategy 1 – Deliver high-quality customer service AT TAC HM E NT S : D escription 1. C A D No.2022-1 Houston C ourt A rea Map May 16, 2024 Regular Board Meeting Agenda Packet - Page 40 of 500 Page 2 of 3 W Li n d a M e s a A v e Ir o n H o r s e T r l M a c o m ber Rd W Pro s pec t Ave Quin n t e r r a L n R a i l r o a d A v e E n t r a d a M e s a Lynn Ln H i g hl an d Dr Mary C t Es t a t e s D r Gl e n d o r a C i r M i r a L o m a L n Willi a m Ct E s t h e r L n H o u s t o n C t H i gh l and Ct Mo n t a i r Dr El D o r a d o A v e D a n v i l l a C t Bon a n z a W a y S o n o r a A v e Ti m C t Sk y Ter Es t a t e s D r 4 3 1 2 Assessment Number Potential Participant Existing Sewer Structure Existing Sewer Main Potential CAD Sewer Main CAD Area Assessment Numbers for Houston Ct. Area Contractual Assessment District No. 2022-1 Map Date: 10/24/2022 0 200 FeetR N: \ G I S \ P r o j e c t s \ E n g i n e e r i n g \ P l a n n i n g \ C A D \ P r o _ C A D . a p r x M M Note: Central San data as of October, 2022. Detail Area 680 Danville Alamo Ston e V a l l e y R d D a n v i l l e B l v d El Cer r o Blvd Sycamore Valley R d E Attachment 1Map Displayed in North American Datum of 1983 California State Plane, Zone III FIPS 0403, US Feet 31 0 30 6 30 9 32 5 May 16, 2024 Regular Board Meeting Agenda Packet - Page 41 of 500 Page 3 of 3