Loading...
HomeMy WebLinkAbout03.b. Amend a Professional Engineering Services Agreement up to $450,000 with HDR Engineering, Inc. Increasing the Cost Ceiling to $1,850,000 for Additional Design Services & Improvements Under the Steam Renovations, Phase 1, DP 100032Page 1 of 10 Item 3.b. DCENTRALSAN MEETING DATE: MAY8, 2024 BOARD OF DIRECTORS POSITION PAPER DRAFT SUBJECT: REVIEW DRAFT POSITION PAPER TO AUTHORIZE THE GENERAL MANAGER TO AMEND A PROFESSIONAL ENGINEERING SERVICES AGREEMENT UP TO $450,000 WITH HDR ENGINEERING, INC., INCREASING THE COST CEILING TO $1,850,000 FOR ADDITIONAL DESIGN SERVICES AND IMPROVEMENTS UNDER THE STEAM RENOVATIONS, PHASE 1, DISTRICT PROJECT 100032 SUBMITTED BY: INITIATING DEPARTMENT: MIKE ZUBRZYCKI, ASSOCIATE ENGINER ENGINEERING AND TECHNICAL SERVICES- NATHAN HODGES, SENIOR ENGINEER CAPITAL PROJECTS REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER GREG NORBY, DEPUTY GENERAL MANAGER - OPERATIONS ROGER S. BAILEY, GENERAL MANAGER ISSUE Authorization of the Board of Directors (Board) is required for the General Manager to execute an amendment to a professional engineering services agreement for amounts greater than $200,000. BACKGROUND On March 3, 2022, the Board authorized the Steam Renovations, Phase 1 (Project) and a professional engineering services agreement for $1,400,000 with HDR Engineering, I nc. (HDR) for final design and bidding services. The Project addresses the treatment plant steam system's immediate needs and is coordinated with other potential steam system phases. The scope of work was developed after extensive condition assessment evaluations under the Aeration and Energy Upgrades project. Staff and HDR have been progressing with the bid package and with design at 90 percent for the initial scope items in the Pump and Blower Building (P&BB) and the Solids Conditioning Building (SCB). Approximately 50 percent of the construction work is within the SCB, which consists of replacing portions of the boiler feed water (B FW) system that are critical for the operation of the waste heat boilers, auxiliary boilers, and cogeneration heat recovery boiler. Boiler operation produces steam which drives the aeration system, a large part of why the steam system is so critical to treatment plant operations. The BFW system was installed in the 1970s as part of the 5A Treatment Plant Expansion project, and the original design was based upon additional equipment and loads in the SCB that were never installed. A May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 12 of 23 Page 2 of 10 detailed evaluation of the BFW system was part of the final design scope and was submitted in June of 2023. HDR's evaluation included a detailed piping stress analysis which staff agreed would be necessary to address safety and operational concerns with the system. The analysis has exposed deficiencies and concerns with the existing BFW system beyond the initial project. For example, pipe fittings not rated for system pressure and insufficient pipe supports for thermal expansion and seismic restraint. The project team attempted to resolve the deficiencies identified in the BFW evaluation within the original scope and fee, however, it became clear that the effort required was greater than anticipated. The entire BFW system needed to be analyzed and subsequently designed as a complete system. In other words, the BFW pump replacement (an original scope of work item) could not be finalized independently from the BFW piping. The BFW system deficiencies, combined with the need to maintain an operational and reliable steam system during construction, led to the decision to design an entirely new BFW system (pumps and piping) parallel to the existing system. This design effort was not anticipated nor included in the original scope of work. This additional effort by HDR will result in a new BFW system that meets current safety standards and operational requirements for the steam system. The design effort includes replacing two steam -driven BFW pumps and one electric pump with three electric pumps sized to current steam demands and redundancy needs, and new piping sized for current flows and pressures. However, due to the additional time required to design the BFW system and the urgent need to complete the improvements in the P&BB, HDR will be splitting the work into two separate bid packages. The first package will include replacement of the steam condenser units and all work within the P&BB. These units have shown degrading condition over recent inspections and the loss of these units would remove a steam aeration turbine from operation. The design work for the BFW and other improvements in the SCB will be completed by the end of the year. By separating these scope items into two separate construction contracts with staggered schedules, staff can better mitigate risks to treatment plant operations. The additional design identified with the BFW system and splitting the original bid package requires more design budget at a level of effort that is estimated not to exceed $450,000. As completion of the SCB bid package nears, staff will evaluate the coordination with the Solids Handling Facility Improvements, Phase 1 A (Solids Phase 1 A) project construction. California Environmental Quality Act (CEQA) At the March 4, 2022 Board meeting, the Board independently found that the Project is exempt from CEQA under Central San's CEQA Guidelines Section 15301, since it involves repairs, maintenance, and minor alterations to an existing sewage facility with no increase in capacity; and Section 15302 since it involves replacement of existing public facilities at the same location and with the same purpose. Any capacity increases are for non -growth inducing, wet weather purposes. No further action is anticipated. ALTERNATIVES/CONSIDERATIONS The authorization being requested will allow the design to include the additional BFW scope needed to properly replace the major system components and allow the construction flexibility recommended by Operations and Engineering. Staff has already started evaluating the timing of the SCB work, including the increased BFW scope, with the Solids Phase 1 A project and determining the best time for its replacement. The Board could provide other direction or not authorize the design amendment, however rejecting the amendment is not recommended since the major BFW equipment (pumps) has known deficiencies and is nearing the end of its useful life. May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 13 of 23 Page 3 of 10 FINANCIAL IMPACTS The existing HDR agreement (No. 32135) has a cost ceiling of $1,400,000. The amendment would add $450,000, resulting in a new cost ceiling of $1,850,000. The current engineer's estimate for construction is $8,000,000, therefore the design represents approximately 23 percent of the estimated construction costs. This design percentage is higher than seen in typical District projects (15 percent); however, this project is highly specialized, and the BFW evaluation needed for making decisions added significant time and cost. In addition, the design requires a high level of accuracy and detail to renovate the system considering safety and operational constraints. The Project is listed in the Fiscal Year 2023-24 Budget on page 267 with a total estimated project budget of $16,000,000. There is adequate funding available in the Project budget. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this matter at its meeting on May 8, 2024 and recommended RECOMMENDED BOARD ACTION Authorize the General Manager to amend a professional engineering services agreement up to $450,000 with HDR Engineering, Inc., increasing the cost ceiling to $1,850,000 for additional design services and improvements under the Steam Renovations, Phase 1, District Project 100032. Strategic Plan Tie -In GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations, Strategy 4 - Identify and advance sustainability initiatives, including reducing energy usage and emissions GOAL FIVE: Safety and Security Strategy 1 - Reduce and eliminate risks of injury or illness, Strategy 2 - Protect Personnel and assets from threats and emergencies GOAL SIX. Infrastructure Reliability Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program ATTACHMENTS: 1. Presentation May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 14 of 23 Page 4 of 10 Attachment 1 Extensive Condition Assessments (Secondary and Steam Assets) Sub 33 Aeration Basins Diffuser Replacement, District ®ii a®� ° r ,_ nF9 Project (DP) 100019 Sub34 •r Electric Blower � A cam.. Improvements, DP - - 100015 A� IlYllllli°°' Sub 73 2 May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 15 of 23 1 Page 5 of 10 Steam Renovations, Phase 1 Project Background 2019 2020 2021 2022 rL December 2018 July 2020 September 2020 Board approved Board approved Electric P January May 2021 March 2022 Staff provided Staff provided Board approved Board approved Final Steam Project for Blower Improvements, Board updates Board updates on Aeration Basins Design for Steam Condition Assessment DP 100015 for Final Design on Condition Comprehensive Diffuser Renovations, Phase 1 and Preliminary Assessment Asset Evaluation Replacement for Project Design under Project Results Results Final Design DP 7349 Steam System Overview E Legend: Steam Renovations, Phase 1, DP 100032 Scum Centrifuge Syalem ..,Water Q Support Operations & Maintenance -- Haater Exchanger No Work Anticipated: Remaining useful life > 15 years Copolymer (to Boilers) Heat . ,• Chemical Feed I Electric Blower Exchanger condenser Ber CoM) War Hot Icwl amps wa Loop Final Return Eir% Water Heaters Potable Conch Deaerator 1 1 Makeup Storage Tank 1 -CB Water �sY6erJ VAU Waste Steam CW `Sca=en&e! Amine j CW Return I I Cwurn Solids Conditioning Building (SCB) 4 IGSC II Vacuum, Hogger,&Aeration Unit Hotwell Pumps I E IIIIIIIIIIIIIIIIIIIIIIIIIIII mI Condensate Return Condensate Return Pump and Blower Building (P&BB) May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 16 of 23 2 Page 6 of 10 Steam Project Design Scope In general, original scope of work based on extensive condition assessment and safety needs: 1. Work in P&BB: Two waste steam exchangers Two aeration blower turbine condensers At the end of useful life and significant maintenance concerns; Replacement ASAP Requires 20" #3 water piping reroute for installation 2. Work in SCB: Two deaerator pumps Replacing two steam -driven boiler feed water (BFW) pumps and one electric pump with three electric pumps with variable frequency devices Two boiler chemical feed tanks Limited BFW items (i.e. valves) Replace sample panels - Complete (Safety Concerns) Construction Completed to Date Construction Completed . Date via Uniform Public Construction Cost Accounting Act Project due to Safety Needs: Installed New Boiler Sample Stations led D CENTRAL SAN h W{# CENTRAL CONTRA COSTA SANITARY DISTRICT Ilk May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 17 of 23 3 Page 7 of 10 1. P&BB Scope Items Waste Steam Exchangers 5 iY 2. SCB Scope Items Deaerator Pumps Aeration Blower Turbine Condensers rH wl+ Pump Replacement — Replace steam driven pumps with electric '' Nj,, May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 18 of 23 4 Page 8 of 10 Current Design Status Steam Regulators Original Scope of Work at 90% Detailed Design However, additional scope was identified: HDR Engineering, Inc. (Designer) has completed analysis to identify new pipe sizing, supports/braces, and initial pump sizing BFW piping and fittings do not meet current mechanical code Piping fails stress analysis for thermal and seismic Some fittings do not meet current steam operating pressures Design Agreement Revision & Costs BFW piping system stress analysis and modeling exposed deficiencies Sizing the BFW system for current demands Keeping BFW system operational while completing project scope Additional time needed to design the BFW system to include with the original scope in the SCB Coordinate impacts with the Solids Handling Facility Improvements, Phase 1A (Solids Phase 1A) Project Separate bid package for the P&BB work as items cannot wait due to tube condition and operational risks Revision to add $450,000 to the $1.4 million (M) Agreement with HDR Engineering, Inc. May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 19 of 23 5 Page 9 of 10 Anticipated Construction Schedules Project scope will be bid separately 1. P&BB to bid first: Bid expected mid 2024 Equipment lead time —3 months Construction begin in early 2025 2. SCB to be evaluated: Design expected by December 2024 Bidding and construction TBD due to Solids Phase 1A Estimates & Budget 1. P&BB Scope: Current Construction Cost Estimate $21VI 2. SCB Scope: Current Construction Cost Estimate $61VI Sufficient budget available; project listed on page 267 of Fiscal Year 2023-24 Budget: Design $3.5M Construction $12.5M Total Budget $16.01VI May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 20 of 23 6 Page 10 of 10 Recommended Board Action Authorize the General Manager to amend a professional engineering services agreement up to $450,000 with HDR Engineering, Inc., increasing the cost ceiling to $1,850,000 for additional design services and improvements under the Steam Renovations, Phase 1, District Project 100032. May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 21 of 23 7