HomeMy WebLinkAbout03.a. Review Proposed Fiscal Year 2024-25 Capital Improvement Budget (CIB) and Ten-Year Capital Improvement Plan (CIP)Page 1 of 9
Item 3.a.
F__1_448�411C_S0
May 8, 2024
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
REVIEWED BY: GREG NORBY, DEPUTY GENERAL MANAGER - OPERATIONS
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: REVIEW PROPOSED FISCAL YEAR 2024-25 CAPITAL IMPROVEMENT
BUDGET (Cl B)AND TEN-YEAR CAPITAL IMPROVEMENT PLAN (CIP)
Staff will present a summary of the proposed Fiscal Year 2024-25 CI B and 2024 Ten -Year Cl P for review
and discussion.
Strategic Plan re -In
GOAL ONE: Customer and Community
Strategy 1— Deliver high -quality customer service, Strategy 3 - Build neighborhood and industry relations
GOAL TWO: Environmental Stewardship
Strategy 1 - Achieve compliance in all regulations
GOAL FOUR: Governance and Fiscal Responsibility
Strategy 1 - Promote and uphold ethical behavior, openness, and accessibility, Strategy 3 - Maintain financial stability
and sustainability
GOAL FIVE: Safety and Security
Strategy 1 - Reduce and eliminate risks of injury or illness, Strategy 2 - Protect Personnel and assets from threats and
emergencies, Strategy 3 - Understand and reduce impacts of cybersecurity attacks
GOAL SIX: Infrastructure Reliability
Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program
GOAL SEVEN: Innovation and Agility
Strategy 1 - Leverage data analytics to become a more efficient utility
ATTACHMENTS:
1. Presentation
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 3 of 23
Page 2 of 9
Attachment 1
May 8, 2024
Proposed Fiscal Year
2024-25
Capital Improvement
Budget (CIB) and
Ten -Year Capital
Improvement Plan (CIP)
Engineering and Operations Committee
Meeting
Edgar J. Lopez, P.E.
Capital Projects Division Manager
Fiscal Year (FY) 2023-24
Major Accomplishments
Regulatory and Safety
Started construction of the Solids Handling Facility Improvements,
Phase (Ph.) 1Awith new air pollution control equipment, seismic
modifications and other needed improvements at the Solids
Conditioning Building.
Sewer Infrastructure Replacement
Replaced or rehabilitated up to 4-5 miles of public sewers in the
service area, public streets, and backyard easements.
Treatment Plant Infrastructure Replacement
Continuing construction of the Filter Plant and Clearwell
Improvements, Ph. 1Afor reliable recycled water storage and electrical
improvements.
Completed construction of the Influent Pump Electrical Improvements
and Electric Blower Improvements.
Continuing construction of the Pump Station Upgrades, Ph. 2 (A & B)
for new stations at Maltby and Fairview, and renovation of Martinez.
Completed electrical improvements at San Ramon.
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 4 of 23 1
Page 3 of 9
Closing Projects in FY 2023-24
Pump Station Upgrades, Phase 1, District Project (DP) 8436
Collection System Modeling Support, DP No. 8449
COVID-19 Response, DP No. 8253
Martinez Sewer Renovation, Phase 7, DP No. 8464
Laboratory Roof and Seismic Upgrades, DP No. 100008
Hearth Replacements, DP No. 100009
San Pablo Watershed Improvements, DP No. 100038
Easement Acquisition, DP No. 100043
Houston Court CAD, DP No. 100053
Aeration Unit 1 Steam Turbine Overhaul, DP No. 100054
Influent Pump Electrical Improvements, DP No. 7348
Fire Protection System, Phase 3, DP No. 7373
CIB and Project Prioritization
Aging Infrastructure — Reliability (Max. 20 points)
Key Asset Replacement
Consistent with Asset Management Program
Improves Reliability and System Performance
Increases Capacity to Meet Projected Build -out
Improves Facility -Wide Resiliency
Driven or complies with Regulatory Requirements or Mandates
Impacts or needed improvements to continue Regulatory
Required for Safe & Reliable Operations
Reduces Potential Health or Safety Hazards
Optimizes Capital or Operations and Maintenance Costs
Increases Sustainable Use of Natural or Existing Resources
Reduces Social and or Environmental Impacts
Supports Timely Adoption ofTechnology Improvements
Meets Commitment with Outside Agency or Existing Contract
Implements Board of Directors' Policy/Priority
Impacts Phasing or Implementation Schedule
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 5 of 23 2
Page 4 of 9
Proposed FY 2024-25
CIB per Program
..2024-25
Program (1)
Collection System $81,099,256
CIB
Forward
$27,000,000
(2)
$23,327,000
Future FYs
(3)
$73,775,000
Total Estimated
Project Budgets
$184,201,256
Treatment Plant
118,610,332
18,000,000
46,900,000
349,694,000
515,204,332
General Improvements
14,823,000
2,200,000
5,235,000
14,775,000
34,833,000
Recycled Water
43,687,000
2,000,000
250,000
14,121,000
58,058,000
Total
$264,219,588
$49,200,000
$75,712,000
$452,365,000
$792,296,588
CIB Contingency
55,000,000
* The Budget to Date 11) above includes approximately 81% of the budget projected to be spent for on -going projects, not including
contingency. The remaining budget is carry forward to FY 2024-25.
MCA
TREATMENT PLANT PROJECTS OVERVIEW
0 n�lxc wP9asmuav9E 01-11Tr REIULA—Y Osunuxn9lulr
m m m.m.�°l ee r �u.e wA� e� P n. AmP m mm mmn �s Aa ae ro �!mk mm m gA firo wl r o ��e n �m mino.AAm lm� mmmm I,A
_ _ �makmor,q�r,mmm.roemmy�an _
ane Aegxe Vranmemmv mm menuwems,us P+�oxnwswew �HWauIICAtlAbn BM1pmgroWtlunrNatlaprmndlmal �nJnrgemmlNp� �Mlmd'mclun�.sPl�awnAlnr�IM� u ss�irvnm�iranMre�fimlmnregx¢aYPgna< la-xq �mM1�m!
Imgawmera nllaremrcMpr„oYepuny,rEYlPGmknmma l]In mnnc.�minonki nYlralm.anA ��mmmlmoaw+smrmi�orwerpoaurnnsy.iem
lerlrtpureWrsxupe�MmaMrwfi+YhwmanPol. �^'�'�"'�^`�"^r'�"'i'"°""` re:ueaum eire+neieon, aeWrearc°aatwnmmmm n°mil°ua m°�rewmeraln backwzzm.asv
_ _ �imgememssnsmicupgnae.mrlmxiA�s [mximwg
re emrxeewa xE eee3a mllmm,naaxevsllwer �ro�OaNim�Yu •nrnerrynxgwwatxmgmlmmnal: nee men, vureize mmmblrol.
�Oeor[ann°lupmnxaa mryiNxalxsrmnmxlwnmrymv. aaai��mrs °geCucesxyewwner,a mvby SwArne rmorvrmmrin�
lq;ale sneaexxn9xel .ngilsw ecwila .+Aurywnn naesnonlelm
_ Ioum Ww n w�m.+u.� Ib
Ks. >t.nwimswce�npF.eem°wc>,mlrer rer:nxwswremme am°rgeaesaar orww�
19 a redxcmzm�nnlm n�mle ��pirPawimimmsemis�m�mme ewes m
• smmY We�ws�a*anwa
IB _- _ _ ion mmmmem�m.�amena.cw.
IE fi- fi
.�. 9
18 I
11
1
16
'nljx ma Ifi
Pmpe 19
tea!
i n
l9
17
14 __� •
M
6
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 6 of 23 3
Page 5 of 9
Major Treatment Plant Projects Overview (2017)
0 •
a Hiradworks Screenings Upgrade
Ol 0V • PLC Sysems Upgrades Phases 1 and 2
0
as Pump B Blower Building Seismic Upgrade
1 2 3 a Traatment Plant Urgent Repairs
Ol a
S odchgear Refudushmerd-Phase 2
1 2 �3 Naa Appked Research a conwations
Oi as a Influent Pump Stat on Elec cal Impro amens
1 2 0• Uutfall lmpre—onto- Phase 7 to 0
Oi a
Mechanical and Concrete Henwadens
O1020 a TP Worry Enhancements - Phases dto I
a
Ram Control S"Won If(l Raplsaament
TWO a Annual Infrastructure BepNaemant Program
;lO
0 a
a Equipmert Replacement
Ol O2 O3 a Recycled Water Distribution System Renovations
Ol •
a Fire Pmtect'wn System-Phases2t¢B
0O3 a Plant C¢niml System Network Upgrade Phasesland2
IN
afiping Renovation-Phsai
DODO • Odsr Control Upgrades - Phosel and
lO
a Walnut Creek/Graysan Creak Levee Rehab
O as Wat Weather Flow Manugemam
0 •
0UV➢isimemien Upgrades
O2 N o PrimaryFrpansisn Project
Ol
aT—bnem Plant Security Improvements
0 as Warehouse Saismic Upgrades
Ol
a Flout Wide Instrumentation Upgrades
O as Ludaratory Secsmio Upgrades
lO • alnno ive Biocnergy Bamonstration
O N Mlscellaoaom Seismic Upgrades
O•
Solids Conditioning Building Roof flaptrcement
O2 • • Cleary oll imp—r-cr nts
0 a• UV Hydraulic Improvements
0O3 as Secondary Treatment Hydraulic Impmuements
Ol a
Condition Assessment ofBunedPipelines
0O3 • WWTPSCADABeplscemsnt
•Ram 11,—tiens BLah Date lmpmvemants
pose a Solids Handling Facility lmpmvemants-Phi
1 •
•Filler Plant Improvements
O3 • a Solids Handling Facility lmpmvemants - Phase 3
Ql O2 •
aaAerationand Energy Upgrades
O3 • a a Toned lmpmvemema
1 2 aaaa Solids Handling Facility Improvements
O• Secondary Clarifier Improvements
O1 O2
as Plant Operations Building Seismic Upgrades
0• DAFT Imprwemertts
OOa
Surcharge Sol RIe Ralacatin.
OO•
Nutrient Removal (BACWA Leval I1
• Aging Infrastructure O phase 1 (Dta 5 years)
QQ a
aUVEI-fantian Rspi o—o t
Capacity 0Phase2(5to10years)
TO a
Tmaonem Plum SCAOA Improvements
• Regulatory OPh— 3(10 to 20
• Sustamsbility years)
Plant Projects
Progress
Major Treatment
1 • • Haedworks Screenings Upgraded
1 O2 O3 • PLC Systems Upgrades Phases 1 and 2 V
Completed or
ongoing Projects
since 2017, not
including
emergency or
new contingency
projects
Completed
or Phase(s)
completed
8
Treatment Plant Projects end The, Drivers
Oi
as Pump B Blmxer Buikiirg Seismic Upgrade 0®
1 O2 O3 a Treatment Plant Urgent fiepairs �
0 a
54vdchgear Refur6ishmerrt-Phase 2
1 2 3 Nb Appdled Research & Innwmions �
Ol as almluent Pump Station ElemricallmprovervttPn
1 2 0a Ou[{aillmprovemems-Phase7tog �
Ol a
Mechanical and Concrete Renwationsc/
1QQ a TP Safety Enhancements-Phases4to iid
Da
Rem Control System lfU Replacemant�
lO2 Oa Annuslinfmstructure Rep cement Program
0 •
a Equipmert Replecemam V
1 OOa flecycdad Water Qistrihution System flenwations
Ol •
a Fire Pmtectmn System -Phases 2t¢ B �
0O3 a Plant ConFml System Network Upgrade Phases 1 and
Q •
a Riling Renovation - Phase 0 d
OO• • Odor C¢ntml Upgmtles - Phase t and 2 e�
lO
aWalnut Creak(Gmysnn Creekievea Rehuh
2 as Wet Weather Fl¢w Management
Ol .
•llV➢isimarti¢n Upgrades
2•a aPdmaryExpansion Project
Qi
•Traatinam Plant sanarny Imprwamam¢
o n Upgrades
0
aRan1-Wide lnmmmmrtetion Upgrades
O as Luhomfnry Saismic Upgmdesv�
lO • • Innovative Bioenergy Uam¢nmmtion 0®
0 as Miscellaneous Seismic Upgrades
O•
Solids Conditioning Building Roof flep€ecevs�
2Oa • Clearwell Impmuements
Qas IN Hydaulin Improvements
1
on nran s memo a rile ones
2 3 a WWTP SCAQA Repls¢emant
1
aRem Opmations6 Leh Qata lmpmvement
2 ; Solids Handling Facility Improvements-Phase2
1 •
a Filter Plant Impmuements
3 Solids Hendpn Fecillt Ion rovements-Phase 3
3 a NTunnel lmpravemems
1 O2 • as Aemiion and Energy Upgrades e®
1 Q ease Solids Handling FacilVry Improvements
'
Oa RAFT Improvements
1 2 sapient Operations Building Selamic Upgrades
1 2
a Sumherge Sol File Relocetlon
.Aging Infrastructure Ophasel(OTo Syears)
1 2 a NrNient Removal �BACWALarel l�
1 2 •
• UV➢isim lion Reptcamem
0 Capacity O2 Phase 2 (5 to 10 years)
•Regulatory O3 Phase 3(16 to 2-0
1 2 a Traamrem Plant SCAOA Improvements
• Sustainability years)
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet -Page 7 of 23 4
Page 6 of 9
Major Projects Summary for Next FY:
TREATMENT PLANT
• Solids Handling Facility Improvements, Ph. IA (Construction)
• Steam Renovations, Ph. I (Design/Construction)
• UV Disinfection Replacement (Design)
• Aeration Basins Diffuser Replacement (Ph. I Construction)
GENERALIMPROVEMENTS
• Technology Strategic Plan
• Permit Counter Software and Information Technology Development
• Vehicle Replacement and Equipment Acquisition (Purchases)
• Electric Vehicle Charging Infrastructure (CSO andTP)
RECYCLED WATER
• Filter Plant and Clearwell Improvements, Ph. I A (Construction)
• Filter Plant and Clearwell Improvements, Ph. I B (Electrical Design)
COLLECTION
SYSTEM
Sewer Renovation Projects:
Design:
• Orinda/ Pleasant Hill/Walnut
Creek
Construction:
• Walnut Creek, Ph. 16
• Pleasant Hill, Ph. 2
• Downtown Walnut Creek —
Locust
• Urgent Projects
Pump Stations (Construction):
• Ph.2: Martinez/Fairview/Maltby
• Buchanan Lift Stations
Abandonment & Sewer
New Projects in FY 2024-25 by Program
Collection System and Recycled Water:
None scheduled
Treatment Plant:
Central Chilled Water Evaluation ($0.6M);
Nutrient Management ($60M Total) 10-year TBD
General Improvements:
• Equipment Acquisition ($3.OM Total), 10-year project
• Mt. View Sanitary District Feasibility Study ($.75M Total)
M = million
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 8 of 23 5
Page 7 of 9
CIB Modifications: FY 2023-24 Major Budgets Adjusted
The following budgets were adjusted to lower carry forward in FY 2024-25:
DP No.
Description
FY 2023-24
FY 2023-24
Description
100012
UV Disinfection Replacement
$ 7,980,000
$ 5,500,000
$21V moved to Future years and $480k
returned to Fund 20.
Solids Handling Facility
Savings of $2.9M and returned to Fund 20.
100030
Improvements Phase 2
5,700,000
2,800,000
Predesign was not needed.
100032
Steam Renovations - Phase 1
8,500,000
7,000,000
Estimate has been reduced by $1.51M.
Orinda-Moraga Pumping
100037
Stations Architectural
1,450,000
450,000
$11V reallocated to future years.
Improvements
100062
PS SCADA & PLC Upgrades
350,000
-
postponed aligning with other work at the
treatment plant and Dynac replacement.
Total:
$23,980,000
$15,750,000
$8.2M decrease in carryforward budget,
not including closed project variances.
CIB Modifications: Updated Total Project Estimates
The following total estimated project budgets were modified:
Total Budget
IFY '
Total Budget
DescriptionProjects
Decrease of $3.5 million; estimate lowered in
Steam Renovations- Phase 1
16,000,000
12,500,000
detailed design.
Solids Handling Facility Improvements
Increase of over $4 million to include additive
- Phase 1A
195,518,687
199,963,687
bid prices at award.
Increase of $9 million based on rear term
Wet Weather Basin Improvements
1,900,000
10,900,000
safety improvements and reliability for
intense storm weather and raising basin levee
roadways.
Aeration Basins Diffuser Replacement
Received bids and project split with Phase 2
- Phase 1
59,480,000
20,879,000
to bid later in CIP, deferring $38.6 million.
Increase of $7.5 million for optimization and
Secondary Clarifier and Channel
10,000,000
17,500,000
flow improvements and channel
Improvements
rehabilitation.
MRC Building Modifications and
Increase of $1.6 million for expansion of
Maintenance Shops Improvements
2,100,0c0
3,700,000
facility and remodel.
Total
$ 284,998,687
$ 265,442,687
Overall decrease of approx. $19.56 million
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 9 of 23 6
Page 8 of 9
Proposed Ten -Year CIP
FY 2024-34: $1,003M
Program
Collection System
$303,802,000
Treatment Plant
633,744,000
General Improvements
32,660,000
Recycled Water
32,876,000
Subtotal
$1,003, 082,000
Contingency
5,0 00,000
Total with Contingency
$1,008,082,000
New Updates:
Adjustments to future projects (3%) for
construction market.
Increase in Nutrient Management project
by $30M. This budget was developed
using assumptions that the existing
infrastructure will be used to help lower
nutrients to meet pending regulations.
New facilities for Nutrient Removal, or
potential Water Exchange Project or
Concord Community Reuse costs are not
included in CIP.
Proposed Ten -Year CIP FY 2024-34: $1,003M
Tan-Y-r rip
1
2
3
4
5
6
7
8
9
10
FY 24-25
FY 25-26
FY 26-27
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
FY 32-33
FY 33-34
Treatment Plant$ 46.9
Collection System$ 23.3
General - $ 5.2
Recycled Water$ 0.3
$ 65.8
$ 34.0
$ 5.1
$ 2.3
$ 67.6
$ 31.3
$ 4.5
$ 3.3
$ 70.8
$ 31.6
$ 2.7
$ 3.3
$ 67.5
$ 32.7
$ 2.7
$ 3.0
$ 65.9
$ 29.9
$ 2.5
$ 2.9
$ 61.4
$ 30.0
$ 2.5
$ 2.7
$ 65.0
$ 30.0
$ 2.5
$ 1.3
$ 62.8
$ 30.5
$ 2.5
$ 6.8
$ 60.3
$ 30.5
$ 2.5
$ 6.8
$ 5.0
2024-25 Proposed CIP
$ 75.7
$ 107.2
$ 106.7
$ 108.4
$ 105.9
$ 101.2
$ 96.6
$ 98.8
$ 102.6
$ 100.1
$ 1,003.2
not included in total $140.0
$120.0
$100.0
$80.0
$60.0
$40.0
$20.0
FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 2&29 FY 29-30 FY 30-31 FY 31-32 FY 32-33 FY 33-34
■Treatment Plant ■ Collection System ■ Geneml lmprwemerrc ■Recycled Water ■Contingency
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 10 of 23 7
Page 9 of 9
May 8, 2024 EOPS Regular Committee Meeting Agenda Packet - Page 11 of 23 8