HomeMy WebLinkAbout04.a. Presentation (Handout)Handout Item 4.a. Attachment 1 FY 2023-24 Capital Improvement Budget with Current Expenditures as of 12/31/23 (November Billings) Totals: $147,456,461 $34,820,420 24% * Includes FY 2024 and carry forward from FY 2023 wed Program Approved Actual %Actual Budget Spent Expenditures* Expenditures to Date Collection System (CS) $67,604,000 $15,613,585 23% Treatment Plant (TP) $65,697,622 $14,789,229 23% General Improvements $7,596,181 $1,986,713 26% Recycled Water $6,558,658 $2,430,893 37% Collection System - Sewer Renovation and Pump Station Projects In Construction Pleasant Hill, Phase 2 — 6,600 feet of sewers (75% complete) Downtown Walnut Creek Locust —1,500 feet of sewers (40% complete) Walnut Creek, Phase 16—11,000 feet of sewers (97% complete) Martinez, Phase 7 — 6,200 feet of sewers (100% complete) Martinez, Maltby, Fairview, San Ramon Pump Stations Replacement ongoing Martinez Urgent Force Main (FM) Replacement — construction this spring Urgent projects as needed In Design Bid projects from Collection System Sewer Renovation, Phase 2, include the next phases of Orinda, Walnut Creek, Pleasant Hill, and Lafayette Final design of abandonment of Buchanan Lift Stations 3 Pleasant Hill, Phase 2 4 2 Downtown Walnut Creek Locust AN .- Walnut Creek, Phase 16 7 Martinez Urgent FM Replacement t � *Y , p r I M Pump Station Upgrades Phase 1 (Completed) Moraga Orinda Crossroads Flush Kleen Phase 2 (Ongoing) San Ramon Fairview Maltby Martinez d 10 o concore 9erkeley [�; ori�a. - � 0aki—d aamo� � N • ,re���P��;�a��w��e�Fa � Pna 'o Pumping Stations 5 i i It'TC d 41i >600 M qa e Marti GAG 1nittates 2600 Marina Vista Ave. Martinez CA 94553 Uni"d States 1211123, 10:213 AM A- if .. flttyv, CENTRAL SAN t NTPA COSiA SnN iAPY D Si -odsD CENTRAL SAN ClITIAL t2-1 Cl- S-1-sl D I.PIC, 13 Other CS Projects and Items to Come Projects in Process Planning phase work for Large Diameter Pipeline Program and update to the Collection System Master Plan 39-inch sewer crossing Grayson Creek being evaluated Caltrans relocation of the A -line Sewer Interceptor Cedar Lane Sewer Modifications Project in Orinda Force main assessments 14 7 Solids Handling Facility Improvements, Phase 1A (Phase 1A) Construction Contractor: C. Overaa & Company Contract Price: $126,288,000 (4% paid as of November) Total Estimated Project Budget: $199,964,000 Schedule: October 1, 2023 - October 2, 2027 (4% spent) CDM/ArcSine Designers and MWH Construction Manager Work Completed: Mobilized, schedule, submittals, etc. Site demolition for Seismic improvements ongoing. Utility re-routing ongoing. b„_ Electrical investigation and verification for submittals. 15 16 M. Phase 1A Utility Re-routing 17 Phase 1A Basement Floor Demo for Wet Scrubber 2. +�� � ��� � 1'� � - �k is "•~� r I M Other Related Activities Taking Place Maior Eauioment Procurement Updated major equipment contracts executed. Change orders have been executed to incorporate updates made since bidding through the start of construction. Mechanical components have been released for fabrication with vendors. Control shop drawings being coordinated and finalized. Staffing uo with internal and outside resources 19 Electric Blowers Improvements Filter Door Modification 20 Blower 4 Commissioning —.99111111111 10 Piping Renovations Phase 10 21 Hypo Site 1 and PE Pump VFD Replacement Filter Plant and Clearwell Improvements, Phase 1A Substation & Electrical Bldg. - Busway Issues 22 Tracer Testing 11 23 RAS Piping Renovations Bypass Piping III d2 � �A n'� u . . . . . r� 24 12 Aeration Basin Diffusers Replacement, Phase 1 • C. Overaa & Company (Filter Plant, Pump Stations, Solids) • Construction Contract $12,662,000 • Total Estimated Project Budget $20,879,000 • HDR - Design Engineer (Electric Blowers, RAS Piping) • Construction over summers 2024 (Tank 1A/1B) and 2025 (1C/1D) • Scope Seismic & Structural work including baffles Floor slab/plenum demolition Aeration Diffuser installation • Sub 32 Electrical Work 25 Aeration Basin Diffusers Replacement, Phase 1 P11 13 Wet Weather Improvements Wet Weather Improvements 27 QUESTIONS? 2s Basin levee Raise 14