HomeMy WebLinkAbout03.a. Presentation (Handout)Handout Item 3.a. March 6, 2024 Electric Blower Improvements, District Project (DP) 100015 and Treatment Plant (TP) Piping Renovations, Phase 10, DP 7369 Additional Budget and Change Order Request Engineering and Operations Committee Meeting Edgar J. Lopez, P.E. Capital Projects Division Manager 1 Two Projects Combined 1.Electric Blower Improvements: Three New 1MW Magnetic Bearing Electric Blowers and Electrical Panels Three New Chillers Three New Filter Houses Canopy Covered Medium Voltage Switchgear and Transformers 2 Attachment 1 i Fkl :r -70 ✓ -"._- ��C$DCENTRALSAN rim' ±tw- Pil II� ,/ ACO CENTRAL SAN oil 1, Second Project Background 4 2. TP Piping Renovations, Phase 10: Replaced Scum Piping, Gates, and Electrical for Both North and South Quad Clarifiers Replaced Centrate Piping in the Solids Conditioning Building Replaced 3W HP and LP Piping Replaced Hydropneumatic 1W Tank, Piping, Compressor, and Electrical Panels 3WHP Pumps 1 and 2 Variable Frequency Drive (VFD) Replacements Boiler Chemical Piping Replacementk4 S. Hypo Site 1 Improvements Replace Primary Effluent VFD 5 _PpWEREX ._ 1 � Awarded Project Budget July 2021 General Contractor: Auburn Constructors, LLC (Auburn) Construction Contracts: Contingency: Construction Costs: Construction Management: Prebid Expenditures (Design): Total Estimated Project Budget: I $ 13,104,300 $ 1,440,700 (10.9%) $ 14,545,000 (100%) A $ 2,250,000 (15.5%) B S 2,050,000 (14.1%) C $ 18,845,000 (A+B+C) Contract Status Today Construction Contracts: $13,104,000 ($800K remains) Contingency Approved: $1,440,700 (98% allocated) Change Orders: Agreed Extra Work at Roughly $1,333,000 To Date $450 nnn of Casts Being Revie we-d Time Extensions, Auburn Demobilized on September 1, 2023 Current Plan to Finish Auburn Demobilized after Blowers Commissioned Waiting for Electrical Gear to Arrive and Schedule Work after April Issue a Change Order to Remobilize and Complete the Remaining Work All Equipment Must Be Onsite Prior to Moving Forward to Be More Efficient and , Cost Effective_ Major Work includes Hypo Site 1 Improvements and Primary Effluent VFD ' �, Replacement ��-• '� - E:3 M 0 Change Order Scope Total Cost of $405,000 and Includes: Mobilization and Demobilization Costs Costs for Subcontractors, Such as Coatings Costs of Labor and Installation Equipment Insurance and Bonding Costs Extended Time to Complete the Work within 90 Calendar Days Weather Related Construction Constraints Prevents Future Claims IN Overall Budget Request Change Order: $ 405,000 Additional Construction Management: $ 430,000 ** Contingency to Close Out: 60,000 Total Budget Needed: $ 895,000 Original Completion Date: November 1, 2022 Estimated Completion Date: August 1, 2024 (20 mo.) * Change order costs of $405K and $800K contract work remaining, total of $1.2 million. ** CM budget overspent by $230,000 to date due to extended construction time. 11 Reasons for Extended Time Major Electrical Equipment Procurement i Electric Blower Improvements �. MV Switchgear oil Busway r� Selector Panel TP Piping Renovations, Phase 10► VFDs (3) 0 Motor Control Centers (3) 12 M Reasons for Extended Time CIO r. and Project Costs �� COVID Supply Chain Issues � ` ` Operational Constraints and.` Coordination —� Complex Project Specialized Equipment Temporary Equipment Used.. Change Orders for Additional Work Longer Duration for Construction Management Costs 13 Revised Project Budget Construction Contracts: Change Orders: Contingency Close Out: New Construction Costs Construction Management: Prebid Expenditures: 14 $ 13,104,000 $ 1,738,000 (13.3%) $ 60,000 $ 14,902,000 (100%) $ 2,686,000 (18.0%) $ 2,050,000 (13.8%) $ 19,638,000 (4.2% Overrun) 7 Bid Results and Initial Cost Savings PROJECT NOS.: 100015 & 7369 NO. CF ADDENDA: 2 DATEFFIME: JULY 1. 2021112.00 PM PROJECT NAME: ELECTRIC BLOWER IMPROVEMENTS& TREATMENT PLANT PIPING RENOVATIONS. PHASE 10 PROJECTMANAGER: NANCYMOLINA PROJECT LOCATION: 5019 IMHOFF PLACE MARTINEZ. CA ENGINEER'S ESTIMATE: $14,000000 NO. BIDDER BID PRICE 1 Aubum Constructors, LLC S9,394,390 Sacramento, Califomia 2 C. Overaa & Co. 510,462.,000 Richmond, California 3 Mountain Cascade, Inc. 510,979.,D47 Livermore, Califomia 15 A Recommended Board Actions Staff recommends the following: Authorize the General Manager to execute a construction contract change order in the amount of $405,000 with Auburn Constructors, LLC to remobilize and complete the Electric Blower Improvements, District Project 100015 and Treatment Plant Piping Renovations, Phase 10, District Project 7369; and Authorize a budget transfer in the amount of $895,000 from the Capital Improvement Budget Contingency to fund the Project. 16 r go 17