Loading...
HomeMy WebLinkAbout01. Innovations Fair Winner Presentation Page 1 of 5 Item 1. CENTRALSAN Jdf A- hom CENTRAL CONTRA COSTA SANITARY DISTRICT December 21, 2023 TO: HONORABLE BOARD OF DIRECTORS FROM: TEJI O'MALLEY, HUMAN RESOURCES AND ORGANIZATIONAL DEVELOPMENT MANAGER REVIEWED BY: PHILIP LEIBER, DEPUTYGENERAL MANAGER -ADMINISTRATION ROGER S. BAILEY, GENERAL MANAGER SUBJECT: INNOVATIONS FAIR WINNER PRESENTATION Central San held an Innovations Fair October 18, 2023. A new, permanently mounted global positioning system (GPS) base station at Collection System Operations (CSO)took the top prize. Central San's Survey group Greg St. John, Kelly Weir, and Chris Pentes collaborated with Electrical Technicians Nate Hill and Mark Turner, Machinist Josh Powell, CSO Senior Engineer Jason DeGroot, System Administrator Jose Vega, and their supervisors (Sean Sullivan, Bill Bowers, and Matt Hart)to develop an in-house project. The station provides a more accurate and consistent reference point for land surveys, saving time previously required for control surveys. The upgraded signal also allows the Survey team to work more efficiently near large buildings and trees that can block GPS signals. (Reference: Lateral Connection -December 2023) The presentation on the new GPS base station will be given by Greg St. John. Strategic Plan re-In GOAL THREE: Workforce Diversity and Development Strategy 3- Retain skilled workers by investing in resources and opportunities for all employees to grow and thrive ATTACHMENTS: 1. Presentation December 21, 2023 Regular Board Meeting Agenda Packet- Page 6 of 461 Page 2 of 5 Attachment 1 December 21,2023 Global Positioning System (GPS) Base Station at Collection System Operations Building Innovations Fair Winner 2023 a Gu 9 Greg St.John, PLS Land Surveyor a 1 Table of Contents The Background The New Developments TO , The Team The Project The Results ' The Thank You! December 21, 2023 Regular Board Meeting Agenda Packet- Page 7 of 461 1 Page 3 of 5 xN The Background g _ Q Central San has been using GPS since 2006. Geographic locations are calculated using distances from known satellite positions. ® ti Elevations for Central San projects are _,,,, derived using GPS techniques. "Base Stations"transmit corrections to "Rover Positions" in the field. The New �.�. Developments ' "` New Chinese and European constellations are available to augment United States and Russian satellites. New hardware is being used to take advantage of planned improvements to the global satellite system. Central San can reduce private subscription costs by constructing its own "base stations". 4 December 21, 2023 Regular Board Meeting Agenda Packet- Page 8 of 461 2 Page 4 of 5 The Team Survey Support Section Greg St John, Kelly Weir, Chris Pentes !a Collection System Operations Jason DeGroot Electrical Shop Sean Sullivan, Mark Turner, Nate Hill Information Technology Matt Hart,Jose Vega Machine Shop Bill Bowers,Josh Powell The Project , The Steps: 1 Purchased the hardware 2 Selected and tested the location Modified & constructed conduits Made the project cyber-secure Designed and constructed the "Base Station" mount Tested the system for speed and accuracy December 21, 2023 Regular Board Meeting Agenda Packet- Page 9 of 461 3 Page 5 of 5 The Results Two times the number of satellites f available ' Less effort deriving elevations More data under tree canopy and near buildings ° More topographic surveying using GPS (as opposed to Total Station) ' Less opportunity for theft More consistency between projects Thank You! December 21, 2023 Regular Board Meeting Agenda Packet- Page 10 of 461 4