Loading...
HomeMy WebLinkAbout07. Approve a contingency project in the amount of $450,000 for the Treatment Plant Odor Control Facilities Improvements and authorize the GM to execute a Professional Engineering Services Agreement with Jacobs Solutions, Inc. in the amount of $350,000Item 7. BOARD OF DI RECTORS POSIT ION PA PER M E E T ING D AT E:D E C E MB E R 7, 2023 S UB J E C T: A P P R O V E A C O NT I NG E NC Y P R O J E C T I N T HE A MO UNT O F $450,000 F O R T HE T R E AT ME NT P L A NT O D O R C O NT R O L FA C I L I T I E S I MP R O V E ME NT S ; A ND A UT HO R I Z E T HE G E NE R A L MA NA G E R TO E X E C UT E A P R O F E S S I O NA L E NG I NE E R I NG S E RV I C E S A G R E E ME NT W I T H J A C O B S S O L UT I O NS , I NC . I N T HE A MO UNT O F $350,000 F O R P L A NNI NG A ND P R E-D E S I G N S E RV I C E S S UB M I T T E D B Y: MI C HA E L C UNNI NG HA M, A S S O C I AT E E NG I NE E R I NI T I AT I NG D E PART M E NT: O P E R AT I O NS-P L A NT O P E R AT I O NS- P R O C E S S C O NT R O L RE V IE WE D B Y:NI T I N G O E L , O P E R AT I O NS O P T I MI Z AT I O N D I V I S I O N MA NA G E R G R E G NO R B Y, D E P UT Y G E NE R A L MA NA G E R - O P E R AT I O NS R oger S . B ailey General Manager IS S UE T he B oard of D irectors (B oard) authorization is required for the General Manager to execute a professional engineering services agreement or initiate a new project, Treatment Plant Odor Control F acilities I mprovements (Project), not listed in the C apital I mprovement Budget in an amount greater than $200,000. B AC K G RO UND C entral San reduces treatment plant (plant) odors by using several types of odor control f acilities. C hemical towers neutralize the odors by spraying sodium hypochlorite against foul air and are located near the headworks, solids conditioning building, and primary clarif iers. Other odor control f acilities include a biofilter f or dissolved air flotation tanks, activated carbon vessel for emergency sludge load out, and foggers that mist an odor neutralizing liquid near the primary sedimentation and aeration tanks. December 7, 2023 Regular Board Meeting Agenda Packet - Page 66 of 99 Page 1 of 3 T he odor control f acilities have perf ormed well over many years due to exceptional operation and maintenance practices. However, most of the current facilities have been in service f or over twenty-five years, and some of the infrastructures are showing signs of deterioration. Central S an’s Odor Control F acilities Plan was originally completed in 1998 and last updated in 2006. Two projects are listed in the 10-Year Capital I mprovement P lan to address the deficient inf rastructure f or the plant odor control facilities, as f ollows: 1. Odor Control R epairs, S olids C onditioning B uilding - project goal is to address near-term improvements and has a budget of $1.5 million dollars beginning in F iscal Year (F Y) 2024-25; and 2. Odor Control I mprovements Phase 2 - project budget of $15 million and beginning in F Y 2027-28. Staf f is proposing to initiate the planning for these projects and update the Odor C ontrol F acilities P lan this F Y while in parallel, completing detailed condition assessment of existing equipment and exploring ways to optimize operations and maintenance costs. T he P roject will then compile results as a comprehensive asset evaluation which estimates remaining usef ul life based on the condition of the inf rastructure, capacity, regulatory, and sustainability/optimization drivers. An alternatives analysis will then be completed to compare rehabilitation or replacement through a benefit cost evaluation. F ollowing the completion of the analysis, a preliminary design will be developed for all near-term improvements. T his project will also coordinate with other ongoing projects in construction such as S olids Handling F acility I mprovements - Phase 1 A , District P roject 7348. On S eptember 6, 2023, a formal R equest for Proposal (R F P) was publicly advertised, and two (2) consulting firms responded with proposals. After evaluating the proposals based on qualif ications and overall ratings, staf f invited both consulting f irms, B rown and C aldwell and J acobs S olutions, I nc. (J acobs), to participate in an interview on October 30, 2023. A f ter the conclusion of the interviews, J acobs was selected and scored as the top proposer and is, theref ore, recommended for the P roject. T he P roject scope of work includes the f ollowing: 1. C ondition A ssessments: Evaluate and provide a detailed condition assessment of the existing odor control facilities to estimate the remaining useful lif e. A dditionally, identify improvements which could extend the remaining usef ul life and improve saf ety. 2. S ampling, Model Update, and Optimization E valuation: Perf orm f ield sampling to update models from the 2006 Odor Control F acilities Plan. Evaluate opportunities to improve energy and chemical dosing ef f iciency. 3. Comprehensive Asset E valuation: Estimate the remaining usef ul life based on aging inf rastructure, capacity, regulatory, and sustainability/optimization drivers. 4. Alternatives Evaluation: E valuate alternatives f or equipment rehabilitation to extend the remaining usef ul life versus rehabilitation. D evelop phasing plan for equipment rehabilitation and replacement. 5. P re-D esign R eport: Develop 10% pre-design of the selected alternative and cost estimate. 6. Detailed Design and E ngineering Services during Construction: I ncluded as part of the R F P process for future work, however, will not be included in the agreement and will require future B oard actions based on the scope of work recommended by staf f . C oncurrently, C entral San staff will negotiate an additional scope of work with J acobs to develop planning level concepts f or minimizing odor impacts f rom potential f uture conditions such as an increase in December 7, 2023 Regular Board Meeting Agenda Packet - Page 67 of 99 Page 2 of 3 wastewater f low to the treatment plant af ter a possible merger with Mt. View Sanitary District, higher organic strength of wastewater f rom water conservation, and service area population growth. A lso, State R oute 4/I nterstate 680 interchange improvements under the final design and construction by Contra Costa Transportation A uthority and C alif ornia Department of Transportation will lead to vehicle traf f ic being closer to the treatment plant f ence line, etc. T he additional scope of work will help develop the Odor Control F acility Plan new equipment design criteria and project phasing plan. T he additional scope of work will be within the General Manager authorization limit of $200,000. ALT E RNAT I V E S /C O NS I D E RAT IO NS T he B oard may elect to stay on the current plan for the P roject, which starts in F Y 2024-25. T his is not recommended as staf f plans to do a comprehensive evaluation and assessment, which requires time and starting early is benef icial to addressing any deficient equipment or inf rastructure. Modifications or improvements to the odor control f acilities require permitting from the local air authority and based on previous experience, obtaining permits can take significant time. F I NANC IAL I M PAC T S T he total estimated cost for the planning and preliminary work for the P roject is $450,000, which includes consultant services for $350,000, staf f time, and contingency for additional testing services. F inal design services and engineering services during construction are not currently budgeted under this agreement. C entral San will negotiate those services with J acobs and request approval f rom the Board as the P roject progresses. T he total estimated placeholder project cost may reach up to $16.5 million, and likely to be phased as projected in the 10-Year Capital I mprovement P lan. T he placeholder costs f or project(s) will be updated after the planning phase. C O M M I T T E E RE C O M M E ND AT IO N T he E ngineering and Operations Committee reviewed this item at its meeting on November 13, 2023 and recommended approval. RE C O M M E ND E D B O ARD AC T I O N Staf f recommends the Board approve a contingency project in the amount of $450,000 f or the Treatment Plant Odor Control F acilities I mprovements; and authorize the General Manager to execute a prof essional engineering services agreement with J acobs S olutions, I nc. in an amount of $350,000 f or planning and pre-design services. Strategic Plan Tie-I n G O A L S I X: I nfrastructure Reliability Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program G O A L S E V E N : I nnovation and Agility Strategy 2 - I mplement organization-wide optimization December 7, 2023 Regular Board Meeting Agenda Packet - Page 68 of 99 Page 3 of 3