October 31, 2023
TO: ADMINISTRATION COMMITTEE
FROM: PHILIP LEIBER, DEPUTYGENERAL MANAGER -ADMINISTRATION
REVIEWED BY: ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE STRATEGIC PLAN TRACKERS FOR THE FIRST QUARTER OF
FISCAL YEAR (FY) 2022-24
Attached are the Strategic Plan Trackers for the first quarter of FY 2023-24, and the second year of
Central San's FYs 2022-24 Strategic Plan. These reports provide an update on the progress on each goal
and strategy through the fulfillment of the key success measures (KSMs) and the key metrics.
Per the Committee's request, last fiscal year's quarterly performance has been included for metrics that
are On Hold / Delayed / At Risk or Off Track.
The color legend is defined as follows for each tracker:
BLUE — Completed
• Key Metrics Tracker: Target was met for the FY
• KSMs Tracker: KSM was fulfilled
GREEN — On Track / Revised Approach
• Key Metrics Tracker: Target is on track to be met or metric is being measured differently from how it
is written in the Strategic Plan but preserving the intent
• KSMs Tracker: KSM is in progress or being done differently from how it is written in the Strategic
Plan but preserving the intent
YELLOW— On Hold / Delayed /At Risk
• Key Metrics Tracker: Ability to meet target is on hold, delayed, or at risk but recoverable
• KSMs Tracker: KSM is on hold, delayed, or at risk but recoverable
RED — Off Track
Key Metrics Tracker: Target is in danger of not being met for the FY
KSMs Tracker: KSM is in danger of not being fulfilled by June 30, 2024.
Staff will be available at the meeting to answer questions.
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 82 of 111
Page 2 of 28
ATTACHMENTS:
1. Key Success Measures Tracker
2. Key Metrics Tracker
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 83 of 111
Page 3 of 28
ATTACHMENT 1
FY 2022-24 STRATEGIC
PLAN
CENTRAL CENTRAL C�
YEAR 2: KEY SUCCESS MEASURES
(KSMs) PROGRESS
TRACKER
SANITARY DISTRICT
GOAL 1 - CUSTOMER AND
COMMUNITY
Provide Exceptional
Service
Strategy
Initiative
Key Success Measures
Responsible
Q1
Q2
Q3
Q4 /
Activities/Performance in Achieving KSM
Person(s)
FY-End
(Status, Comments, and Exceptions)
Q1: Ongoing. Permit Counter, Collection System Operations
Assess customer satisfaction and develop inventive ways to meet those
Gemmell / Seitz /
(CSO), and Communications (re: construction projects) send out
expectations.
Barnett
regular customer surveys.
Provide core service of collecting and
Q1: See CSO Response Time metrics for response times
treating wastewater, along with
Respond in a timely manner to requests for service.
Seitz
value-added programs.
Q1: Ongoing. Permit Counter, Household Hazardous Waste
Deliver High-
Continue to administer customer -facing programs.
Schectel /
Gemmell
Collection Facility (HHWCF ), and Residential Recycled Water Fill
Station are open to the public.
Quality Customer
Q1: Meetings will be scheduled as needed prior to new projects
Service
Hold informational community meetings for all major sewer renovation projects,
Barnett /
being advertised for bid. Meeting held in October with businesses
including outreach to officials of the impacted cities/county.
Carpenter
ahead of Walnut Creek Locust Street project in conjunction with
Minimize impacts to residents and
Business Association.
Meet individually with property owners and/or tenants on projects involving
Barnett /
Q1: Meetings continue to be held as needed.
businesses during capital projects,
construction work, and maintenance.
private easements.
Carpenter
Barnett /
Q1: Issues are addressed as they arise.Carpenter
Troubleshoot and resolve construction issues as rapidly as possible.
Q1: 259 people were served through virtual and community
Conduct public tours and presentations highlighting infrastructure investments.
Barnett /
Lavender
events.
Q1: Next session tentatively planned to be held in person in
Host Central San Academy annually.
Gee
spring 2024.
Perform extensive customer and
community outreach.
Barnett / Zumbo /
Q1: Pipeline customer newsletter in production
Develop engaging videos, publications, and brochures.
Vallee
Promote Initiatives
Q1: Continue to monitor and grow YouTube, Facebook, Twitter,
to Advance
Affordable and
Expand social media outreach.
Barnett /Vallee
Insta ram, Linkedln, and Nextdoor followers and impressions.
9 p
Equitable Access
to Services
01: Completed in FY 2022-23.
Conduct a Cost -of -Service Study.
Gemmell
Q1: Two-year rate approved for SSC. Annual fee review
Perform annual reviews of rate structure and fees.
Gemmell
completed during Q4 of last year and implemented effective July
Maintain responsible rates and
offer services at affordable levels.
Q1: New finanicing program for lateral replacement approved.
SRF loan for Solids Phase 1 a being administered. No new
Administer financing programs.
Gemmell / Leiber
financing pending.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 84 of 111
Page 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Build
Neighborhood and
Industry
Relationships
Form and sustain relationships with
federal, state, and local elected officials
and stakeholders.
Support member organizations and
sister agencies.
Page 4 of 28
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 1 - CUSTOMER AND COMMUNITY
Provide Exceptional Service
Key Success Measures Responsible Q1
Person(s)
Connect and engage elected officials, staff, and stakeholders on initiatives.
Support Board Member engagement with elected officials.
Participate in industry organizations and forums.
Provide assistance and mutual aid to other agencies.
Share industry -leading work.
Barnett
Barnett / Young
All Managers
Deutsch
All Managers
ATTACHMENT 1
Q2 Q3 Q4 / Activities/Performance in Achieving KSM
FY-End (Status, Comments, and Exceptions)
Q1: Ongoing outreach during events, meetings, and outreach on
programs, services, and legislative perspectives.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach O On Hold / Delayed / At Risk
(KSM was fulfilled) (KSM is in progress or being done differently from how it is (KSM is on hold, delayed, or at risk but recoverable)
written in the Strategic Plan but preserving the intent)
Q1: Ongoing.
Ongoing. Staff participates in multiple industry organizations and
forums to share information, attend trainings, and represent
Central San.
Q1: Rec'd one request but we didn't have the equipment they
needed.
Q1: Ongoing. Staff presents at various conferences and applies
for and receives awards for exceptional achievements.
•Off Track
(KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 85 of 111
Page 2
Page 5 of 28
FY 2022-24 STRATEGIC PLAN
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Achieve Compliance
in All Regulations
Educate on Pollution
Prevention and
Environmental
Protection
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and identify and reduce contributions to climate change and mitigate its impacts
Initiative I Key Success Measures
Comply with all applicable regulations.
Foster relationships
with regulatory agencies.
Continue to attain National Association of Clean Water Agencies (NACWA)
Platinum Peak Performance Awards.
Continue to keep sanitary sewer overflows at a reduced level.
Scope improvements to the Solids Handling Facilities.
Upgrade aeration tank diffusers to continue proper biological treatment and
prepare to meet future discharge limitations.
Participate in Bay Area Clean Water Agencies, California Association of
Sanitation Agencies, NACWA, and other like organizations.
Communicate with and participate in meetings and workshops with local, state,
and federal regulatory bodies.
Track, review, and comment on proposed legislation and regulations.
Participate in legislative and Support key advocacy initiatives through customer communications and
regulatory processes. outreach.
Incorporate potential impacts of regulatory changes into long-range
infrastructure and financing plans.
Present student education programs that meet the Next Generation Science
standards.
Provide industry -leading public and
student education programming. Conduct creative public education outreach that encourages positive customer
behavioral changes.
Responsible Q1
Person(s)
Weer
Seitz
Lopez / Gemmell
/ Hodges
Lopez / Mizutani
Schectel /
Barnett
Schectel /
Barnett
Barnett
Barnett
Schectel /
Gemmell / Lopez
Barnett /
Lavender
Barnett /
Lavender/
Zumbo / Vallee
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2 Q3 Q4/
FY-End
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: No violations thru Q3 of calendar year of 2023
Q1: There were 4 spills in Q1
Q1: Project awarded on September 7, 2023
Q1: Construction and Aeration System Contracts Signed.
Q1: Ongoing; Schectel — BACWA Exec Board Member, Co -
Chair CASA Regulatory Water Committee, participate on CASA
State Leg Committee, participate in NACWA and CASA
conferences, member of SFEI Board of Directors, Regional
Nutrient Management Steering Committee alternate
Q1: Ongoing; Schectel — regular meetings with RWQCB,
BAAQMD, and other regulatory agencies as needed.
Q1: Provided tracking, review, and presentations for Board to
take positions on key priority legislation.
Q1: PFAS legislative update to be included in fall Pipeline.
Q1: CIP will start updating in Q2 for Financing plan update to
Board in Q3.
Q1: 4592 students were served through education programs.
Q1: Promoted P2 Week and tips via social media, PSAs aired on
CCTV and Rossmoor TV.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 86 of 111
Page 3
Page 6 of 28
FY 2022-24 STRATEGIC PLAN
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Be a Partner in
Regional Development
of Local Water Supply
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and identify and reduce contributions to climate change and mitigate its impacts
Initiative I Key Success Measures
Continue exploring partnerships with Contra Costa Water District (CCWD),
Santa Clara Valley Water District (Valley Water) and San Francisco Public
Utilities Commission (SFPUC) to advance the Refinery Recycled Water
Exchange Project.
Collaborate with East Bay Municipal Utility District (EBMUD) on a potable reuse
study.
Explore and advance
cooperative opportunities. Continue to work with CCWD and the City of Concord in plans to supply
recycled water to the Concord Community Reuse Project.
Continue to divert raw wastewater to produce recycled water to meet Dublin
San Ramon Services District — East Bay Municipal Utility District Recycled
Water Authority (DERWA)'s peak summer irrigation demand, per the
Agreement.
Facilitate recycled water solutions (e.g., satellite water recycling facilities),
consistent with the Guiding Principles.
Continue to operate and maintain a reliable recycled water distribution system
for Zone 1 customers.
Continue the Residential Recycled Water Fill Station and Commercial Recycled
Water Truck Fill Programs.
Continue to provide recycled water to Complete Phase 1A of the Filter Plant and Clearwell Renovations Project.
residents and businesses; evaluate and
process new customer requests.
Complete the Tertiary Membrane Filter Pilot.
Responsible Q1
Person(s)
LaBella
LaBella
Gemmell /
LaBella
Gemmell /
LaBella
LaBella
Gemmell / Foss
Gemmell / Foss
Lopez / Mizutani
Gemmell / Frost
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2 Q3 Q4/
FY-End
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
01: Staff continues to communicate with these potential
partners about next steps, including encouraging CCWD staff to
schedule the desired follow-up meeting with US Bureau of
Reclamation staff to discuss the project's yield in critically dry
years.
01: Staff continues to support EBMUD's efforts to complete the
feasibility evaluation of an array of potential recycled water
projects with Central San, including potable reuse. This effort will
be completed by the end of the calendar year and will feed into
EBMUD's Recycled Water Strategic Plan Update.
Q1: Master Developer was selected.
01: DSRSD had adequate wastewater supply, so the diversion
project was not operated this dry season. Agreement was
extended for an additional year.
01: Discussions with Diablo Country Club continue.
Q1:Ongoing
Q1:Ongoing
01: Proceeding. Expected Completion April 2024.
Q1: Final recommendations are still pending. Staff has
addressed other priorities this quarter.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 87 of 111
Page 4
Page 7 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Identify and Advance
Sustainability
Initiatives, Including
Reducing Energy
Usage and Emissions
Reduce reliance on non-renewable
energy and responsibly manage
greenhouse gas (GHG) emissions.
Explore opportunities for cost-effective
energy conservation and efficiency.
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and identify and reduce contributions to climate change and mitigate its impacts
Key Success Measures
Develop a policy on net zero carbon footprint.
Implement the 1.75-megawatt solar energy project on the Lagiss property
Evaluate electric vehicle charging stations on site.
Maximize landfill gas usage in daily operations and by capital improvements.
Complete the long-term Solids Handling and Disposal Evaluation
Continue to track and report GHG emissions.
Track and review energy usage; evaluate ways to optimize efficiency in
accordance with Board policies.
Replace incandescent lighting and air conditioning equipment with energy -
efficient devices.
Assess and replace the existing disinfection system with the latest ultraviolet
high -efficiency lamps.
Restart the Green Team to solicit organization -wide ideas.
Expand internal sustainability practices. I Promote environmentally conscious behavior in day-to-day operations.
Advance circular economies with suppliers and contractors towards a smaller
ecological footprint.
Responsible Q1
Person(s)
LaBella
LaBella
LaBella / Cheng
Weer / Lopez /
Hodges
Goel
Cheng / Schectel
Shima / Meyer
Meyer
Lopez
LaBella
LaBella /
All Managers
Gaines
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2 Q3 Q4 / Activities/Performance in Achieving KSM
FY-End (Status, Comments, and Exceptions)
01: Presented policy and measurement alternatives to Board in
September
01: Construction underway
01: Development of Fleet Electrification Strategic Plan is in
progress
01: Ongoing and continuing effort
01: Refinement of technical memorandum. Fluidized Bed
Incinerator is the leading alternative and would be operational in
approximately 2042. Beginning exploration of regional solids
handling alternative. This would involve upsizing or adding
additional Fluidized Bed Incinerators to handle solids from other
treatment plants for a fee.
01: Tracking and internal monthly reports completed
01: Plant energy usage tracked monthlya nd reported quarterly
to Board of Directors. Working with PG&E on energy efficiency
opportunities.
01: Working with EcoGreen / PG&E on LED lighting retrofits.
Q1: Project has proceeded to final design.
01: Group has met to coordinate transition to green cleaning
supplies and continues working to improve on proper solid waste
disposal (recycling, compost, and landfill).
01: Included Green Team articles in every issue of the Lateral
Connection this quarter.
01: Discussions between Labella and Gaines on this initiative.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 88 of 111
Page 5
Page 8 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Recruit from a Diverse
Pool of Qualified
Applicants
Engage Employees and
Conduct Labor
Relations in a
Transparent, Effective,
and Collaborative
Environment
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 3 — WORKFORCE DIVERSITY AND DEVELOPMENT
Recruit, educate, empower, and retain a workforce from diverse backgrounds
Initiative I Key Success Measures
Post job opportunities in a variety of places.
Offer internships in cross -disciplinary positions.
Broadly solicit applications to hire a
diverse staff who embody Central
San's values. Host the Externship Program for college students and recent graduates
Collaborate with schools and/or apprenticeship programs as requested to form a
talent pipeline.
Continue participation in intra-agency workforce development efforts.
Foster a sense of community through internal events, team -building exercises, the
employee newsletter, and increased interdepartmental cooperation.
Establish and communicate clear expectations and standards through
Promote employee engagement and performance planning and appraisals.
inspire dedication.
Convey important initiatives to employees to increase their understanding of
Central San's operations and their role in its success.
Host General Manager lunches with the division workgroups.
Recognize staff accomplishments via newsletters, the intranet, Board
announcements, and other avenues.
Celebrate employees' Expand the employee recognition program.
achievements.
Continue to hold the Innovations Fair, which recognizes and thanks employees for
innovative projects.
Engage the bargaining units in informal discussions to implement collaborative
Sustain and grow collaborative solutions to workplace issues.
relationships with the bargaining
units. Track and implement action items from quarterly Labor Management Committee
meetings.
Responsible Q1 Q2 Q3 Q4 /
Person(s) FY-End
O'Malley
O'Malley /
All Managers
Gee / O'Malley
O'Malley /
All Managers
O'Malley
All Managers
All Managers
All Managers
Bailey / Crayton
All Managers
O'Malley
Gee / O'Malley
O'Malley
O'Malley
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: Ongoing
Ongoing. Summer student and internship positions are offered in
multiple workgroups, including Engineering, Plant Maintenance,
the Lab, Information Technology, and Communications.
Q1: Next program planned for Spring 2024.
Q1: Ongoing. Staff regularly collaborates with schools (e.g., Los
Medanos College) and BAYWORK.
Q1: Ongoing. Central San is a signatory agency with BAYWORK
and a supporting agency of Bay Area Consortium for Water &
Wastewater Education (BACWWE).
Q1: Ongoing. Clarifier Speaker Series is held monthly and the
Lateral Connection employee newsletter is released monthly.
Q1: Held Employee Appreciation Picnic on September 21.
Q1: Ongoing. Staff is appraised on a yearly basis.
Q1:Ongoing. Clarifier Speaker Series is held monthly and the
Lateral Connection employee newsletter is released monthly.
Q1: Roger is continuing to meet with division workgroups
Ongoing.
Q1: Still in planning; various ideas have been explored
Q1: Scheduled for employee picnic on 10/18.
Q1:Ongoing.
Q1:Ongoing.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 89 of 111
Page 6
Page 9 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Retain Skilled Workers
by Investing in
Resources and
Opportunities for All
Employees to Grow and
Thrive
Foster a Culture of
Diversity, Equity, and
Inclusion (DEI)
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 3 — WORKFORCE DIVERSITY AND DEVELOPMENT
Recruit, educate, empower, and retain a workforce from diverse backgrounds
Initiative Key Success Measures Responsible Q1
Person(s)
Continue General Manager and Board Member meetings with the bargaining Bailey / Crayton /
representatives. Young
Continue the Leadership and Supervisory Academies, Mentorship Program, and Gee / O'Malley
Career Development Program.
Encourage staff to obtain professional or technical certifications and registrations. I All Managers
Develop employees to meet their full
potential and fill future leadership Perform appraisals with a coaching and career development approach. All Managers
roles.
Continue to host and participate in multiagency workforce development programs O'Malley
for staff from Central San and sister agencies.
Continue to expand internal training opportunities. I O'Malley
Offer comprehensive benefits such as online therapy services and the Employee O'Malley
Assistance Program.
Support the mental and physical O'Malley /
wellbeing of all employees. Encourage participation in the Wellness Program. Howard
Hold financial and health seminars. I O'Malley
Conduct an assessment to identify strengths and weaknesses. O'Malley / Bailey
/ Gee
Develop programs/initiatives with metrics based on the outcomes of the All Managers
assessment.
Build a diverse workplace that
celebrates differences and is
inclusive of individual perspectives, Encourage and respectfully acknowledge the voicing of different views and All Managers
ideas, and values. perspectives.
Promote inclusivity and a sense of belonging through leadership. I All Managers
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4 / Activities/Performance in Achieving KSM
FY-End (Status, Comments, and Exceptions)
Q1: GM continues to meet with bargaining representatives. As
bargaining matters come up and negotiations gets closer, Board
members will be brought into these meetings. For now, GM briefs
Board Members during meetings with them one on one.
Q1: Supervisory Academy and Mentorship Program in progress
Two employees are enrolled in the Career Development
Program.
Q1: Ongoing.
Q1: Rollout of enhanced performance appraisal forms is in
progress, pending Oracle module launch.
Q1: Ongoing.
Q1: Ongoing.
01: Ongoing.
Ongoing. Wellness Program events continue year-round.
Q1: Flu clinic, quarterly massage and "Cake" Walk/Run will be
held in Q2
Ongoing. Financial webinars are held monthly. Health seminars
are held periodically.
Q1: DEI assessment completed. Work on action plan
commenced.
Q1: Work is underway on the DEI Strategic Action Plan, targeted
for early 2024.
Ongoing. Leadership Team has held several DEI learning
workshops and are committed to employing DEI principles in
everyday activities.
Ongoing.
Q1: Standing item has been added to Managers' Forum agendas
to check in on how well inclusion was practiced during the
meeting.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 90 of 111
Page 7
Page 10 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Promote and Uphold
Ethical Behavior,
Openness, and
Accessibility
Govern and operate with honor and
transparency.
Produce accurate, timely, and
meaningful financial reports.
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Uphold integrity, transparency, and wise financial management in an effective governing model
Key Success Measures
Responsible
Person(s)
All Managers
Barnett / Young
Q1
Support Central San's values and conduct all business in an ethical manner.
Update website with the latest Board agendas, public notices, financial documents,
and other content.
Young
Young
Respond promptly to Public Records Act requests.
Renew California Special District Leadership Foundation Transparency Certificate
of Excellence.
Mizuno
Issue the Annual Financial Report no later than six months after the end of the
fiscal year.
Earn the Government Finance Officers Association Certificate of Achievement
(COA) for Excellence in Financial Reporting and the Distinguished Budget
Mizuno
Presentation Award.
Leiber / Mallory /
Continue to evolve the enterprise resource planning (ERP) software and
associated systems to meet reporting needs.
All Managers
Barnett
Promote voter registration efforts.
Support the elections process.
Enable voting through a secure, public ballot drop box on campus.
Young
Encourage and
Young
n/a
Conduct first by -district election.
Facilitate Public
Participation
Adhere to the Brown Act to provide public access to meetings.
Young
Livestream Board meetings online.
Young
Encourage civic engagement.
Maintain the virtual Customer Experience website.
Barnett
Host public events.
Barnett
Mitigate rate increases by leveraging financing opportunities.
Leiber / Gemmell /
Mizuno
Maintain Financial
Stability and
Sustainability
ran a Conduct Ion planning.
long-range p g�
Develop scenarios to utilize debt prudently in financing the 10-Year Capital
Improvement Plan (CIP).
Leiber / Mizuno
Leiber / Gemmell /
Mizuno
Actively pursue state and federal funding via loans and grants.
Ensure resiliency against recession
or other economic events.
Fund Rate Stabilization Account and Pension and Other Post -Employment
Benefits Trust with available funds from favorable year-end variances.
Leiber / Mizuno
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2 Q3 Q4/
FY-End
Ongoing.
Ongoing
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: Performed.
Q1: Award good for 3 years will renew in 2025
Q1: FY 22-23 ACFR being finalized and audit underway. On
track to issue ACFR by November/December 2023.
Q1: Applied for the Distinguished Budget Award for FY 22-23
budget. Finalizing FY 21-22 ACFR and plan to submit for COA in
Q2: Also expect to receive COA for FY 20-21 ACFR in Q2.
Q1: Initial ERP contract has been closed out. Contract
management module work underway. Permitting & Community
Development on track for implementation in December 2023.
Work underway for a 3rd party assessment of state of Oracle
system.
Q1: Planning to promote voter registration via social media in
advance of Election Day
Q1: Vote box is securely and permanently mounted. No Q1
activity.
No election needed.
Q1: Ongoing
Q1: Ongoing
Q1: Continue to maintain and promote Virtual Experience;
Q1: Ongoing
Q1: No financing planned at this time.
Q1: Continuing to monitor financial plan for upcoming financing
needs.
Q1: Limited new SRF funding available; no filing planned for this
calendar year. Continuing to monitor program.
Q1: Bringing proposal to Board in October/November
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 91 of 111
Page 8
Page 11 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 4 — GOVERNANCE AND FISCAL RESPONSIBILITY
Uphold integrity, transparency, and wise financial management in an effective governing model
Initiative I Key Success Measures
Strive towards full funding of employee -related obligations in accordance with
Board policies.
Develop budgets in alignment with the Strategic Plan, Enterprise Risk
Management, and 10-Year Financial Plan.
Disseminate relevant and reliable interim financial information to management for
monitoring and controlling of their respective cost centers.
Pursue efficiencies and new technology for cost control.
Manage costs.
Promote open competition and equal opportunity for qualified suppliers and service
providers by soliciting and awarding high-level service and commodity -based
contracts.
Utilize annual requirements contracts to improve efficiency and savings through
negotiated pricing.
Complete annual Benchmarking Study to identify potential gaps.
Responsible Q1 Q2 Q3
Person(s)
Leiber / Mizuno
Leiber / Mizuno
Mizuno
All Managers
King
King
Gee
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q4 / Activities/Performance in Achieving KSM
FY-End (Status, Comments, and Exceptions)
Q1: Continuing to monitor funded ratio on pension/OPEB.
Q1: Budget process will commence in January 2024.
Q1: Disseminated three monthly overviews and one quarterly
financial review, as well as monthly detail -level budget reports
internally.
Q1: Ongoing. Optimizations Fair to be held in Q2.
Q1: Ongoing
01: Ongoing
Q1: Will prepare next report in calendar year 2024
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 92 of 111
Page 9
Page 12 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Reduce and Eliminate
Risks of Injury or Illness
Maintain low injury and illness
rates in a safe workplace.
Enhance the safety culture through
improved training and
communications.
Evaluate and apply risk
management practices.
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 5 — SAFETY AND SECURITY
Provide a safe, secure, and healthful workplace that foresees and addresses threats
Key Success Measures Responsible
Person(s)
Monitor accident/incident causes to identify and mitigate hazards. I Ledbetter
Provide regular analyses to the District Safety Committee, Safety Teams, and Ledbetter
Management Team on accident/incident causation and corrective measures.
Increase visibility of Safety staff in the field. Ledbetter
Conduct training based upon accident/incident causal factors, new processes, Ledbetter
equipment, or procedures.
Notify supervisors and managers promptly of upcoming safety -related regulations. I Ledbetter
Maintain and report on the Enterprise Risk Management Program and risk Deutsch
inventory.
Develop annual internal audit plans based on risk assessments. I Johnson
Test and improve internal controls to mitigate risks of loss. I All Managers
Address findings from regular internal and external audits. I All Managers
Train staff and conduct an exercise of the Continuity of Operations Plan. Deutsch
Protect Personnel and Maintain the Emergency Operations Plan. Deutsch
Assets from Threats Enhance capability to mitigate,
and Emergencies prepare for, respond to, and Expand participation in California Water/Wastewater Agency Response Network
recover from emergencies. (CaIWARN) to represent the needs of wastewater agencies in emergency planning Deutsch
and responses.
Cross -train staff in mission -critical functions. I All Managers
Budget and complete the projects identified in the Security Action Plan. I Deutsch
Evaluate and implement Provide regular security awareness training to staff. Deutsch
improvements to meet new or
evolving threats. Renovate security guard posts and update monitoring equipment. Deutsch
Expand access control systems and harden certain facilities. Deutsch
Q1 Q2 Q3 Q4/
FY-End
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1:
Ongoing
Q1:
Ongoing
Q1:
Ongoing
Q1:
Ongoing
Q1:
Ongoing
Q1:
Team meeting in Q2
Q1: Completed and issued 2023 Miscellaneous Assets Review,
Phase II.
Ongoing. Internal audits are continuing to identify opportunities
for control improvements. .
Ongoing. Regular progress is being made in addressing internal
audit findings. Routine meetings are held on findings status.
Q1: Planned for Q34
Q1: Planning minor update in Q2 before EOC activation exercise
Ongoing. 1 request in Q1
Ongoing.
Q1: Received draft report from security consultant
Q1: Ongoing communications regarding evolving threats and
concerns.
Q1: New Guard Station is complete.
Q1: Ongoing per coordination with Capital and security
consultant
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 93 of 111
Page 10
Page 13 of 28
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Understand and
Reduce Impacts of
Cybersecurity Attacks
Initiative
Stay updated on the latest trends
and emerging threats in
cybersecurity.
Prevent, detect, and remediate
effects of attacks.
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 5 — SAFETY AND SECURITY
Provide a safe, secure, and healthful workplace that foresees and addresses threats
Responsible Q4 / Activities/Performance in Achieving KSM
Key Success Measures Person(s) Q1 Q2 Q3 FY-End (Status, Comments, and Exceptions)
Address cybersecurity concerns as part of the Information Technology (IT) Q1: In process. Plan presented in October 2023. The plan is in
Strategic Plan. Mallory the execution phase with the implementation of intrusion
protection and other technologies.
Q1: New Arctic Wolf solution deployed, which performs a
Conduct third -party cybersecurity assessments focusing on technology, people, Mallory continuous threat analysis of all IT systems.
and physical assets.
Share news and tips with staff. Mallory I I
Q1: Done on a monthly basis.
Keep safeguards in place to block and filter attacks. Mallory I I
Q1: No notable attacks during Q1, and no impacts.
Measure and reduce employee susceptibility to phishing. Mallory Q1: At 65% training level presently; continued focus area.
Q1: Already have redundant paths for internet connections.
Upgrade network and equipment to create redundant paths. Mallory Continuing to evaluate other needs for redundancy for internal
systems as part of IT Strategic Plan.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 94 of 111
Page 11
Page 14 of 28
FY 2022-24 STRATEGIC PLAN
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Manage Assets
Optimally
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Initiative Key Success Measures Responsible
Person(s)
Formalize a condition assessment process for each asset class and complete Meyer / Goel /
condition assessments on all critical equipment. Lopez
Conduct Failure Mode & Effects and other reliability -based analyses as part of key Meyer / Lopez
Capital Improvement projects.
Incorporate Asset Management
practices into the Capital Report, analyze, and identify corrective actions to eliminate or mitigate the Meyer
Improvement and Maintenance recurrence of the failure of key and critical assets.
Programs.
Complete Planner Updates to work orders and use other feedback mechanisms for Meyer / Lee
continuous improvement.
Optimize rehabilitation, replacement, and cleaning of pipelines. I Seitz
Perform strategic reliability -based analysis on treatment plant process systems. I Meyer
Deploy condition -based and predictive -based technologies across asset classes. I Meyer / Lee
Develop Asset Health Indicator Requirements . Meyer / Goel /
Develop reliability -centered asset Mallory
management strategies.
Add service contracts to computerized maintenance management software Meyer / Lee
(CMMS) to track work orders.
Transfer Pumping Stations Operations preventative maintenance work orders to Meyer / Lee
CMMS by the end of 2022.
Perform capital improvements in Ensure all critical assets and processes in need of repair or replacement are Meyer / Lopez /
accordance with the appropriately scheduled in the 10-Year CIP. Weer
Comprehensive Wastewater
Master Plan (CWMP) and Asset
Management Program findings. Develop a prioritization model for vertical assets and update the risk model. Gemmell/ / Meyer
Q1
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4/
FY-End
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: Draft Asset Management Plan will be presented in Q3 and
includes process details for condition assessment.
Q1: Plan to include into CAPEX scope/workflow.
Q1: Ongoing, FRACAS process in place. Ongoing RCA on
hypo pump and P&B bldg supply fan issues.
Q1: 62 planner updates completed.
Q1: Ongoing
Q1: Ongoing RCM studies (Aeration System) training and
PMO training (Aux Boilers) with consultant.
Q1: On -going vibration monitoring, machine lubrication, fluid
analysis, Infrared imaging, Ultrasound testing for critical
assets.
Q1: Executed a Task agreement with consultant to provide
services to engage stakeholders, develop needs assessment,
and provide industry research and solution evaluation.
Q1: On -going incorporation of service contracts to CMMS.
Selected pilot sites and contracts for incorporation
Q1: On -going CMMS set up for Pump Stations Operations
preventive maintenance work order and in the process to pilot
San Ramon Pump Station. Identify next group of pump station
to continue testing.
Q1: This is part of routine CAPEX review and CAPEX
coordination meetings.
Q1: InfoAsset license is up-to-date. Asset management group
is working on completing the Asset Management Plan.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 95 of 111
Page 12
Page 15 of 28
FY 2022-24 STRATEGIC PLAN
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Execute Long -Term
Capital Renewal and
Replacement Program
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Initiative I Key Success Measures
Maintain and evolve tools for effective financial and project management of the
capital program.
Identify vulnerable assets and develop mitigation measures.
Update the CWMP Technical Memo (TP8) on Resiliency and Vulnerability
Harden infrastructure against
resiliency risks associated with Improve the wet weather basins, berms, and levees to reduce risk of flood damage
climate change, earthquakes, and in extreme wet weather.
energy availability.
Seismically retrofit the Laboratory and Maintenance Reliability Center buildings.
Responsible Q1 Q2 Q3
Person(s)
Lopez / Mizuno
Lopez / Gemmell
Gemmell / Lopez
Lopez / Gemmell
Lopez / Hodges /
Schectel / Meyer
Complete renovation of steam and aeration blower operations to increase capacity Lopez / Mizutani /
during energy outages. Hodges
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
0 On Hold /Delayed /At Risk
(KSM is on hold, delayed, or at risk but recoverable)
Q4 / Activities/Performance in Achieving KSM
FY-End (Status, Comments, and Exceptions)
Q1: Implemented EPM capital project budgeting solution. Now
exploreing ProCore construction management software.
Q1: Projects identified for 2022-23 CIB for implementation.
Q1: Brown and Caldwell completed Treatment Plant Flood
Vulnerability Study in July 2022, updating flood and SLR
evaluation in TM TP-8. Collection System Infrastructure Plan
starting this FY includes resiliency and vulnerability evaluation.
Q1: Levee Improvements project design with Flood Control
District is in progress, expected to bid this FY. Wet weather
basin evaluation and berm raising planning are in progress.
Q1: Laboratory retrofit has been completed. MRC is in CIP.
Q1: Construction delayed due to supply chain issues.
Estimated completion Q3. Steam Renovations bid delayed to
Q3 to accommodate additional scope.
•Off Track
(KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 96 of 111
Page 13
Page 16 of 28
FY 2022-24 STRATEGIC PLAN
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 7 — INNOVATION AND AGILITY
Optimize operations for continuous improvement, and remain flexible and adaptable
Initiative I Key Success Measures
MODIFYIED FOR YEAR 2: Assess and pilot test digital monitoring (mod
aR ) to leverage machine learning where effective and applicable
Develop new reporting dashboards to track strategic, tactical, and operational and
maintenance performance metrics.
NEW FOR YEAR 2: Identify process improvements and their potential efficiencies.
Responsible 1st 2nd 3rd Q4 /
Person(s) QTR QTR QTR FY-End
Goel
Goel/Bohan
Goel
NEW FOR YEAR 2: Assess the potential of various upcoming secondary treatment
area capital improvement projects for positioning Central San to remove nutrients Goel, Schectel,
for regulatory compliance or Water Exchange recycled water project. These Labella
projects were planned and designed to provide future operational flexibility and
avoid stranded assets.
NEW FOR YEAR 2: Membrane Aerated Biofilm Reactor Intensification Pilot
Testing to assess this technology's effectiveness in removing Nitrogen in Central
Leverage Data Deploy improved monitoring and San's existing tankage. This could minimize or delay the need for a major
Analytics to Become a performance metrics, tracking and treatment plant expansion to remove nutrients for a recycled water project or
More Efficient Utility analytics. regulatory permit requirements , Operate the pilot and summarize the interim
finding in a presentation. Develop interim report with results, alternative analysis.
NEW FOR YEAR 2: Energy optimization roadmap to maximize value of existing
equipment (Cogen) and plan future investments while considering changes in
demand from major capital projects and net zero initiative. (1) Develop energy
profile optimization roadmap RFP. (2) Present task orders and incorporate
feedback from committee/board before issuing the energy optimization roadmap
NEW FOR YEAR 2: Substation 90 Project planning phase to optimize the
treatment plant 12,000 V distribution system in conjunction with replacing existing
electrical transformers and switchgear beyond useful life.
NEW FOR YEAR 2: Secondary process on -going optimization. Initiate design for
secondary clarifier improvements phase 1 to rehabilitate and replace aged
equipment, optimize flow split, and evaluate hydraulic baffles to improve
performance.
NEW FOR YEAR 2: Continue to develop Central San's long-term solids handling
strategy as part of Solids Handling Phase 2. Interim Summary identified Fluidized
Bed Incinerator as leading technology to be commissioned in 2042. Explore
feasibility, costs, and benefits of regionalization.
Goel
Goel
Meyer
Lopez
Goel
Weer
Lopez
Goel
Bailey
Goel
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1:. Consultant contract with Aquasight is in progress to
complete this task for development of real-time monitoring of
plant processes.
Q1: Developing Dashboards for Treatment Plant Maintenance
Decision -Making.
Q1: Issued request for proposal for Odor Control Facility Plan
Update and Secondary Clarifier Phase 1A projects. These two
projects will evaluate opportunities for process optimizations,
while also rehabilitating and replacing aging infrastructure.
Q1: Developed presentation describing recently completed, in -
progress, and planned capital projects related to Central San
secondary treatment. Developed estimates for nutrient load
reduction from various projects. Provided information to BACWA.
Q1: Completed design drawings for equipment installation.
Installation and operation planned for 02.
Q1: Gathering background information from various projects at
Central San. After meeting with stakeholders, scheduled to
introduce project to Board committee in Q2.
Q1: Reviewed and presented technical memos to complete
planning phase.
Q1: RFP issued. Interviews and consultant selection in Q2.
Q1: Presented interim summary to Board E&O committee.
Beginning exploration of regional solids handling alternative. This
would involve upsizing or adding additional Fluidized Bed
Incinerators to handle solids from other treatment plants for a fee.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 97 of 111
Page 14
Page 17 of 28
FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
SANITARY DISTRICT
Strategy
GOAL 7 — INNOVATION AND AGILITY
Optimize operations for continuous improvement, and remain flexible and adaptable
Initiative
Key Success Measures
Responsible
Person(s)
Weer
1st
QTR
2nd
QTR
NEW FOR YEAR 2: Continue to explore the viability of Steam Turbine Generator
Meyer
to convert incineration waste -heat steam into electricity for plant use.
Lopez
Goel
NEW FOR YEAR 2: Establish standards for Program / Project Management for
large projects and enterprise -wide software purchase standards. Present Program
Mallory
/ Project Management Guidelines and Enterprise Software purchasing standards
and guidelines
Develop an implementation plan and schedule of recommended opportunities.
Goel
Communicate progress and results on process measures.
Goel
Gee / Gemmell /
LaBella
Continue the Optimizations, Applied Research, and Smart Initiative programs.
Provide Optimizations Program Annual Reports to Board.
Gee
Develop and begin implementing the IT Strategic Plan.
Mallory
Automate the Treatment Plant Asset Handover Process and track completion of
Support innovation in capital and
Lopez/ Mallory /
operational improvements.
key points along the workflow.
Meyer
FY 2022-
Evaluate and use geocoding/barcodes to tag and track plant assets.
Meyer/Deutsch
23 yellow
as of Q1
Gaines / Leiber
Implement a barcode Warehouse inventory program to fully automate all issues,
receipts, and inventory cycle counts.
Gemmell / Leiber
Evaluate, select, and implement new Sewer Service Charge development and
billing software.
/ Mallory
Implement Permitting and Community Development software.
Gemmell / Leiber
/ Mallory
Continue to configure new ERP
system to meet evolving needs.
Utilize digital database storage and retrieval to reduce paper processes.
Young
All Managers
Create procedures to reflect new business workflows.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
3rd
QTR
Q4/
FY-End
ATTACHMENT 1
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: Identified facilities with operating steam turbine generators of
similar size as Central San. Planning tour for Q2 with operations,
maintenance, engineering and optimization staff.
Q1: Scoping underway.
Q1: On -track for Q4.
Q1: Presented to O and M meeting on Oct 12 and Managers
Forum on Oct 16 regarding Optimization Goals and various
i n itatives
Q1: Managers continue to review optimizations progress on a
quarterly basis.
Q1: FY 2022-23 Optimizations Program Annual Report targeted
to be presented to the Board in early 2024.
Q1: Report presented to Admin Committee in October. Working
on more detailed project planning and implementation.
Q1: This project was placed on hold in Q4 of FY 2022-23 and will
prioritized as part of the Process and Technology Optimization
(PTO) Strategic Plan. Timing yet to be set.
Q1: Still under consideration and discussions with Operations.
Q1: Project ongoing and expected to completed by the end of
Q2.
Q1: Have not started project; have created hardware redundancy
for existing HTE system until a change is made for a new system.
Q1: Project go live now scheduled for December 1, 2023
Q1: Continuing effort to maximize use of Laserfiche. Phase II of
IT/OT Strategic Planning Process may include a separate project
on records management
Ongoing as needed. Work has been accelerated in many
instances given internal audit focus on various areas.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 98 of 111
Page 15
Page 18 of 28
FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
SANITARY DISTRICT
GOAL 7 — INNOVATION AND AGILITY
Optimize operations for continuous improvement, and remain flexible and adaptable
Strategy Initiative Key Success Measures Responsible 1st 2nd 3rd Q4 /
Person(s) QTR QTR QTR FY-End
Improve Maintenance, Repair, and Operations metrics monitoring. Warren
Norby/Goel
Improve the analytic infrastructure to gather and use information to make data -
driven assessments.
Make sound decisions when faced
with unforeseen events.
Be Adaptable, Resilient,
and Responsive Survey best practices of leading sister agencies. All Managers
Develop and employ improved Norby
operational decision support Design and perform Failure and Response Evaluations of major operational
systems and approaches where upsets.
practicable.
• The following items were removed in transition to second year of two-year plan:
ATTACHMENT 1
Activities/Performance in Achieving KSM
(Status, Comments, and Exceptions)
Q1: Ongoing effort to extract relevant information from Oracle
and report for this purpose.
Q1: Aquasite is the current focus for this work area..
Ongoing as needed.
Q1: Discussion in Q2 with various division managers to confirm
approach.
Be Adaptable,
Make sound decisions when faced
with unforeseen events
Identify potential collection and treatment system catastrophic events along with
key operational decisions and responses.
Replaced by other Optimizations Division Priorities
Develop Decision Analytics to provide the required support documentation for rapid
Resilient, and
response.
Work with Aquasite continues under other initiative
Responsive
Develop and employ improved
operational decision support
Implement the Jarvis Operations Response software pilot to facilitate decision
systems and approaches where
making based on real-time data.
Now subsumed into the Aquasite work
practicable.
Leverage Data
Develop performance metrics
related to key operational systems.
Review plant process control loops and evaluate and rank based on potential cost
savings.
Now subsumed into the Aquasite work
Assess existing monitoring, metrics, and controls for those processes with greatest
Replaced by other Optimizations Division Priorities
Analytics to become a
optimization potential and develop recommendations for improvements.
More Efficient Utility
Deploy improved monitoring and
Replaced by other Optimizations Division Priorities
performance tracking and analytics.
Integrate data collection and analysis for reporting performance of key business
areas.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach O On Hold / Delayed / At Risk
(KSM was fulfilled) (KSM is in progress or being done differently from how it is (KSM is on hold, delayed, or at risk but recoverable)
written in the Strategic Plan but preserving the intent)
•Off Track
(KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 99 of 111
Page 16
Page 19 of 28
ATTACHMENT 1
FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
SANITARY DISTRICT
Develop best practices guidance for process control. Replaced by other Optimizations Division Priorities
Implement Organization- Evaluate the treatment process Replaced by other Optimizations Division Priorities
Wide Optimization and carry out recommendations for Conduct a review and ranking of current versus target treatment efficiencies.
optimization.
Identify conceptual improvements and their potential efficiencies.
Replaced by other Optimizations Division Priorities
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130124)
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 100 of 111
Page 17
Page 20 of 28
ATTACHMENT 2
FY 2022-24 STRATEGIC PLAN
CENTRAL CONTRA COSTA
YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
GOAL
1 - CUSTOMER AND
COMMUNITY
Provide Exceptional
Service
Metric
Target
Responsible
Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Average onsite response time
26.95 minutes
Q1: Met target
for collection system emergency calls,
<_30 minutes
Seitz
during working hours
42.83 minutes
Q1: Slightly above target
Average onsite response time
for collection system emergency calls,
540 minutes
Seitz
FY2022-23 was 34
after hours
minutes
3.89
Q1: Met target
Average customer service rating for
'>_3.8 out of 4.0
Seitz
emergency calls
Q1: Danville Sewer Renovation Project Phase 4 survey results received this
73o/D
quarter.
Average customer satisfaction
>95o/a
Carpente
rating on construction projects
r / Lopez
FY2022-23: no
surveys sent in Q1.
Q1: 4 of 4 rated Permit Counter Excellent
Average customer satisfaction rating on
D
?95 /o
Gemmell
100%
permit counter interactions
Sewer Service Charge affordability
<2%
<2%
Q1: Rates were approved in June 2023 and meet affordability indicator.
(Environmental Protection Agency Lowest
(or lower than
Gemmell
Quintile Residential Indicator)
High impact)
Q1: Two hundred and fifty-nine (259) people were served at local events,
Participants in public tours and
259
community presentations, and facilities tours.
presentations
?500
Barnett
Q1::Next session tentatively planned to be held in person in spring 2024
Participants in Central San Academy
>_35
O'Malley
Awards or recognitions received
>_10
Young
3
Q1: 3 awards received
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
Page 1
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 101 of 111
Page 21 of 28
' FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 2
r-TMeet
GOAL
2 — ENVIRONMENTAL
STEWARDSHIP
regulatory
requirements,
promote sustainability,
and identify and
reduce contributions to
climate change and
mitigate its impacts '
Metric
Target
Responsible
Person(s)
Q1
0
Q2
Q3
Q4 / FY-End
Comments / Issues
Q1: No violations
National Pollutant Discharge Elimination
0 violations
Weer
System compliance
Recycled Water Title 22 compliance
0 violations
Weer
Q1: No violations
See comments
Q1: Emergency bypass damper opening: 9/13/23; 30-day letter submitted to
BAAQMD
Title V compliance
0 violations
Weer
FY 2022-23 (One
Opacity
excursion; no
violation yet)
98%
Q1: Slightly below target
Regulatory Title V work orders
o
100 /o
Meyer
completed on time
FY 2022-23
100%
Anthropogenic greenhouse gas (GHG)
s25,000 metric tons (MT)
Q1: On track to meet CY2023 target
emissions
CO2e per calendar year
Chang
On track
0.26
<_1.3 spills per 100 miles
Q1: There were 4 spills in Q1
Sanitary sewer overflows
of pipeline
Seitz
0
Q1: There were 0 Category 1 spills in Q1
Spills to public water
:51
Seitz
0
Q1: There were 0 spills greater than 500 gallons
Spills greater than 500 gallons
53
Seitz
0
Sanitary sewer overflows
Seitz / Lopez
Q1: There were 0 spills resulting from contractors
resulting from construction work
0
100%
Annual Environmental Compliance
Q1: All inspections and permitting completed on time.
inspections and permitting
100%
Henry
completed on time
Q1: 0 Violations
Household Hazardous Waste (HHW)
0 violations
Wyatt
management compliance
0
Q1: 4592 students were served through education programs.
Students served by education programs
>:6,000
Barnett
4,592
Gallons of recycled water
Q1: On track
distributed to external customers
>_240 million gallons (MG)
Foss
105.5MG
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
OCompleted • On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
OOff Track
(Target is in danger of not being met for the FY)
Page 2
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 102 of 111
Page 22 of 28
FY 2022-24 STRATEGIC PLAN
CENTRAL CONTRA COSTA
YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 2
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements, promote sustainability, and identify and reduce contributions to climate change and mitigate its impacts
Metric Target Responsible Q1 Q2 Q3 Q4/ FY-End Comments / Issues
Person(s)
Electricity produced by co -generation using >_18 million kWh (reported Q1: On track.
natural gas as a rolling average) Lee /Shima 22.0 million kWh
Solar power produced at Collection System >_220,000 kWh (reported Lee / Shima 280,00 kWh
Operations and HHW Collection Facility as a rolling average)
Solar power produced >_2.5 million kWh Not yet in
by a new solar array near the treatment (reported as a rolling LaBella production
plant campus average)
Q1: On track
Q1: Construction is underway and, weather -permitting, will be completed by the
end of calendar year 2023. Start-up, which is contingent on PG&E's schedule, is
expected in Q1 2024.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk • Off Track
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed, (Target is in danger of not being met for the FY)
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
Page 3
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 103 of 111
Page 23 of 28
ATTACHMENT 2
FY 2022-24 STRATEGIC PLAN
CENTRAL COSTA
YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARYRY DISTRICT
GOAL 3 — WORKFORCE
DIVERSITY
AND DEVELOPMENT
Recruit, educate, empower,
and retain a workforce
from diverse backgrounds
Metric
Target
Responsible
Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Q1: 42 days
Average time to fill vacancy
<
_60 days
O'Malley /
42
(from request to hire)
Manor
1.7% (including
Q1: On track to meet target
<_6.5%
O'Malley /
retirements)
Turnover rate
(incl. retirements)
Granzella
1.1% (excluding
retirements
6.0
Q1: On track to meet target
Average annual training hours
per employee
>:i 5
O'Malley /
(external and internal training)
Smith
Q1: Jul rec'd 71 %; Aug rec'd 79%; Sep rec'd 69% (avg of 73% for quarter)
Completion of
100%
O'Malley /
73%
annual performance evaluations
Howard
FY 2022-23 was 39%
Q1: HR/Safety conducts the interactive process meetings with employees
O'Malley/
Ledbetter
suffering both occupational and non -occupational injuries or illnesses.
Temporary modified duty provided
>_95% of recordable
100%
(Return to Work program)
injuries
(Previously
Deutsch)
Q1: Exceeded target.
Internal promotions
>25%
O'Malley/
37.5%
(excludes entry-level positions)
Granzella
p
Q1: None
Formal grievances processed
0
O'Malley / Manor
Q1: Expo is typically held in Jan/Feb
O'Malley /
Participation in annual Wellness Expo
°
+ >10%each year
Howard
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
Page 4
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 104 of 111
Page 24 of 28
' FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
Metric
Compliance with Public Records Act
requests on time
ATTACHMENT 2
GOAL 4 - GOVERNANCE AND FISCAL RESPONSIBILITY
Uphold integrity, transparency, and wise financial management in an effective governing
Target Responsible Q1 Q2 Q3 Q4 / FY-End
Person(s)
Q1:100%
100% Young 100%
Board meeting videos posted online
100%
Young
Standard and Poor's and Moody's
AAA/Aa1
Leiber / Mizuno
credit ratings
Debt service coverage ratio
>-2.0
Leiber / Mizuno
Debt as a percentage of total assets
1560%
Leiber / Mizuno
Debt financing
560%
Leiber / Mizuno
of prior 10 years' CIP spending
Debt financing as a percentage
<-60%
Leiber / Mizuno
of projected 10-year CIP
Total revenue funded collection system CIP
>-100%
Leiber/ Mizuno
spending in past 10 years
Total revenue funded collection system
>-100%
Leiber/ Mizuno
spending in 10-year CIP (projection)
O&M reserves
?41.7%
of next year's budget
Leiber/Mizuno
>50%
Sewer Construction reserves
of next year's budget
Leiber / Mizuno
(non -debt financed)
Operating expenditures
as a percentage of Board -approved
operating budget
Financial reports disseminated
every month (summary) and quarter (full)
Reported material weaknesses or
significant deficiencies
in internal controls as part of annual
financial audit
Average cost per overflow claim
Purchasing requisitions completed within
standard processing time
100%
AAA, Aal
n/a
n/a
n/a
n/a
n/a
n/a
88.7%
90-100% Leiber/Mizuno FY2022-23Q1 was
87.4%
100% Leiber/ Mizuno Ir 100%
0 1 Leiber/ Mizuno I n/a
525,000
>-80%
Deutsch I Not yet calculated
King 92%
Q1: 100%
Comments / Issues
Q1: No changes to Central San's credit rating noted.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. To be updated in Q4.
Q1: Year-end only calculation. Metric generally trends low in 1It quarter of year
with many payments being accrued to the prior year.
Q1: Issued June and August expenditure overviews and prior year Q4 report. Due
to time constraints associated with year-end close and minimal usefulness of
information, July overviews are no longer issued.
Q1: Expect to receive audit opinion letter for FY 22-23 ACFR in Q2.
Q1: 2 events, both open claims with reserves. Total will change as claims
develop.
Q1: 206 purchase requisitions received; 92% met processing time metric
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
OCompleted • On Track / Revised Approach O On Hold / Delayed / At Risk O Off Track
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed, (Target is in danger of not being met for the FY)
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
Page 5
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 105 of 111
Page 25 of 28
' FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 2
GOAL
5 - SAFETY AND SECURITY
de
a safe, secure, and healthful
workplace that
foresees and addresses
JL
threats
Target
Comments /Issues
Metric
Responsible
Q1
Q2
Q3
7
Q4 / FY-End
Person(s)
o
100 /o
Meyer
Q1: 100%, tracking to target.
Safety -prioritized work orders
o
100 /o
completed on time
Employee injury and illness
1.51
Q1: 1 Recordable incident. 132831.46 Hours Worked
lost time incident rate
<<-3.3
Ledbetter
Workers' compensation
Q1: - Reduced from 0.82 last year. Modifier applies for entire year.
experience modifier
<<-1.0
Deutsch
0.76
Q1: Safety Committee has not had a quorum to vote for Safety Suggestion
Days to implement approved
<
_60
Ledbetter
N/A
implementation during the first quarter of FY2023-24.
Safety Suggestions
FY 2022-23, <45
Q1: _182 accounts full compliance, 29 accounts in partial compliance, and 9
Purchasing Contractors/consultants in compliance
>70%
Kin 9
accounts in non-compliance.
with insurance requirements
83%
98%
FFY022-23,
Information system outages
Q1: Lost connection to the CSO which prevented them from accessing shared
affecting normal business operations
°
100 /o uptime
Mallory
100%
files on at the Martiniz facility. CSO was able to continue normal work activity
Q1: No data was lost during this review period
Data backup and recovery
0 lost data
Mallory
65%
Q1: New campaign launched to underscore the important of training. New
Employees trained in
100%
Mallory
FY 2022-23, 60%
reports will be developed to report on group training %.
cybersecurity awareness
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
OCompleted • On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
OOff Track
(Target is in danger of not being met for the FY)
Page 6
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 106 of 111
Page 26 of 28
FY 2022-24 STRATEGIC PLAN
CENTRAL CONTRA COSTA
SANITARY DISTRICT
YEAR 2: KEY METRICS PROGRESS TRACKER
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Metric
Target
Responsible
Q1 Q2 Q3 Q4 / FY-End
Person(s)
Planned treatment plant
preventative maintenance
>_90%
Meyer
97%
completed on time
Planned recycled water distribution system preventative
maintenance
>_98%
Seitz
100%
completed on time
Planned collection system preventative maintenance
>98%
Seitz
99.75%
completed on time
Pipeline cleaning
On >_4% of pipelines
3.50%
quality assurance / quality control (QA/QC)
cleaned on an annual
Seitz
basis
Pipeline cleaning QA/QC passing rate 1 >_98% 1 Seitz 1 98.06%
Pipeline inspected through
10% inspected
(150 miles) / 37.5
Seitz
71 miles
Closed Circuit Television Program
miles per quarter
Uptime for vehicles
100%
Seitz
100%
Miles of sewers replaced
Mestet /
0.6 miles
(focused on deteriorated
>_6.0
Lopezz
(FY 2022-23, was 1
small diameter pipelines)
mile as of Q1)
Large diameter and force main
condition assessment
Average time to execute Engineering agreements from
complete package submittal
Contract renewals executed on time
for uninterrupted service
>_3 miles per year Waples / Frost / 0.5 miles so far
Gemmell
<_2 weeks King 5.47 business days
100% King 100%
Comments / Issues
Q1: On target
Q1: On target
Q1: Meeting target
Q1: Slightly below target.
Q1: Meeting target
Q1: On track
Q1: On track
Q1: 0.6 miles
ATTACHMENT 2
Q1: CCTV inspections of FMs by CSO in Q1. Last FY, there were large
diameter inspections
RFP to solicit consultant/contractor for large diameter/siphon inspections is
being drafted in Q1 and Q2 with release in Q3. SSIP consultant initiating
forcemain desktop condition assessments in Q2. CSO CCTV inspection of
priority forcemains completed in Q1 to Q2.
Q1: Meeting target
Q1: Meeting target
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk • Off Track
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed, (Target is in danger of not being met for the FY)
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
Page 7
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 107 of 111
Page 27 of 28
�<<CD
CENTRALSAN
Metric Target
Approved request -to -stock items entered in databases 100%
within 5 business days
Capital expenditures
as a percentage of capital budgeted >_90%
cash flow including carry forward
FY 2022-24 STRATEGIC PLAN
YEAR 2: KEY METRICS PROGRESS TRACKER
GOAL 6 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Responsible Q1 Q2 Q3 Q4 / FY-End
Person(s)
Gaines 100%
Lopez / Mizuno
54.4%
(FY2022-23 was
28.9%)
ATTACHMENT 2
Comments / Issues
Q1: 18 items requested. Total value added $12,687
Q1: Rate generally trends low in Q1 with many payments being accrued to the
prior year.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk • Off Track
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed, (Target is in danger of not being met for the FY)
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
Page 8
October 31, 2023 Special ADMIN Committee Meeting Agenda Packet - Page 108 of 111
Page 28 of 28
' FY 2022-24 STRATEGIC PLAN
CENTRAL CENTRAL C� YEAR 2: KEY METRICS PROGRESS TRACKER
SANITARY DISTRICT
ATTACHMENT 2
GOAL
7 — INNOVATION AND
AGILITY
Optimize
operations for continuous
improvement, and
remain flexible and
adaptable
Metric
Target
Responsible Person(s)
Q1
Q2
Q3
Q4 / FY-End
Comments / Issues
Q1: This initiative is on hold pending completion of the IT Strategic Plan
Projects initiated under Central San Smart
>_3
LaBella
update.
Improved process monitoring or
Metric eliminated and replaced by others.
performance reporting
>3 control loops
Goel/Norby
Q1: Membrane/Filters Business Case Evaluation draft anticipated in Q2.
Reviews or pilot tests
>3
Frost / All Managers
Staff has addressed other priorities this quarterl. Completed design for
of new and promising technology
installation of membrane aerated biofilm reactor (MABR) pilot. Installation
and operation planned in Q2.
Q1: INone this quarter. Multiple conference presentations scheduled for Q2
Research papers and findings resented
p p g p
r papers or
presentations
Frost / All Managers
g
b Planning& A lied Research and O timizations/GIS groups.
y pp p g p
Don't Just Fix It; Improve It
>25
Meyer
8
Q1: On target
work orders completed
Completed optimizations
>_20
Gee / All Managers
Q1: Optimizations are tracked quarterly by the managers.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)