Loading...
HomeMy WebLinkAbout11.a. General Manager Written AnnouncementsPage 1 of 3 Item 11.a. LICENTRAL SAN August 17, 2023 FROM: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: ANNOUNCEMENTS -AUGUST 17, 2023 Attached are the announcements for the above meeting. ATTACHMENTS: 1. General Manager Written Announcements August 17, 2023 Regular Board Meeting Agenda Packet - Page 108 of 115 Page 2 of 3 Attachment 1 Board Meeting of August 17, 2023 General Manager Written Announcements PROJECT UPDATES 1) Membrane Aerated Biofilm Reactor Process Intensification Testing Central San's existing steam, aeration/secondary process, and electrical and instrumentation systems have been performing reliably for many years, but many of the facilities are approaching the end of their useful life and require significant on-going maintenance, attention, or have operational limitations. In 2018, Central San hired a consultant to complete the Steam and Aeration Blower Systems Renovations District Project (DP) 7349 (Steam Project), which included data collection, condition assessment, testing, business case evaluations, and preliminary design of steam, aeration/secondary process, and electrical and instrumentation systems. Secondary process improvements projects, Electric Blower Improvements DP 100015 and Aeration Basins Diffuser Replacement and Seismic Upgrades DP 100019, are currently in construction. These projects were recommended, planned, and pre -designed as part of the Steam Project. The overarching objectives of these projects are employee safety, reliability of operation, meeting current and future demands, reliability of permit compliance, and reduction of operation and maintenance cost. As a part of the Steam Project, the consultant also developed a strategy working with a Central San team to maximize the capacity of existing aeration basins if nutrient removal were required in the future for recycled water projects (i.e., Water Exchange) or to meet regulatory permit limits. The Steam Project recommended pilot testing an innovative technology, Membrane Aerated Biofilm Reactor (MABR), that could intensify treatment in existing tankage (i.e., do more in the same space). Therefore, for nutrient reduction, rather than pouring concrete for new tanks, there is an opportunity to maximize existing assets by repurposing the existing ultraviolet disinfection basins and reusing other various assets. MABR process intensification testing at pilot scale will provide critical design parameters to estimate the amount of nitrogen that could be removed in existing tankage, while learning what impact cyanide in existing Multiple Hearth Furnace air pollution control scrubber water has on MABR efficiency. This will help better estimate costs of a potential capital project to install MABR full-scale. The testing duration is expected to run from September 2023 to March 2024, followed by an alternatives analysis to compare MABR with the more established technology identified in the Comprehensive Wastewater Master Plan Modified Ludzack Ettinger (MLE) Process; MLE full-scale installation would require August 17, 2023 Regular Board Meeting Agenda Packet - Page 109 of 115 Page 3 of 3 Written Announcements August 17, 2023 Page 2 of 2 new aeration tanks and clarifiers in the area with contaminated soil. The MABR intensification budget is $300,000 funded from Process Optimization and Efficiency DP 100055. The breakdown of the MABR intensification budget of $300,000 is listed below: • $50,000 - contractor to install equipment and utilities through a change order on an existing construction contract; • $180,000 - equipment rental from Veolia and consultant support from HDR, Inc. through an on-call agreement; $40,000 - updating design criteria, alternatives analysis, and peer review to be completed by consultant(s) through existing on-call agreement(s) after pilot completion; • $20,000 - Central San staff time; and • $10,000 - supplies and laboratory testing. This item was presented to the Real Estate, Environmental and Planning Committee on July 19, 2023. In the future, the Optimization Division will share the findings of the pilot results with the Committee/Board. August 17, 2023 Regular Board Meeting Agenda Packet - Page 110 of 115