HomeMy WebLinkAbout03.b. Construction Contract in the amount of $2246,800 with SDM Construction for the Laboratory Floor Replacement, DP 100008 and find the project is exempt from CEQAPage 1 of 10 Item 3.b. CDr EENI RAL SAN BOARD OF •' �J POSITION PAPER CENTRAL CONTRA COSTA SANITARY DISTRICT � � • MEETING DATE: AUGUST 14, 2023 SUBJECT: REVIEW DRAFT POSITION PAPER TO AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $246,800 TO SDM CONSTRUCTION, THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER FOR THE LABORATORY FLOOR REPLACEMENT, DISTRICT PROJECT 100008; AND FIND THAT THE PROJECT IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITYACT (CEQA) SUBMITTED BY: INITIATING DEPARTMENT: MICHAEL CUNNINGHAM, ASSOCIATE ENGINEERING AND TECHNICAL SERVICES - ENGINEER CAPITAL PROJECTS REVIEWED BY: NATHAN HODGES, SENIOR ENGINEER EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER GREG NORBY, DEPUTY GENERAL MANAGER ROGER S. BAILEY, GENERAL MANAGER ISSUE The Board of Directors (Board) must award the contract or reject bids within 50 days of the bid opening. Authorization is also required for the General Manager to execute the Contract Documents subject to submittal requirements. BACKGROUND The Environmental Laboratory building (Lab) is located within the Martinez campus and is a critical and specialty facility used every day by staff for permitting, regulatory compliance, and process control. From December 2022 to March of 2023, the Lab roof replacement and building seismic upgrades were completed under the Laboratory Roof and Seismic Upgrades Project. While the floor was identified as requiring replacement due to poor condition caused by a deficient moisture barrier, the roofing and seismic upgrades were completed first to keep the Lab operational during construction, minimize impact on staff, and protect high value and sensitive equipment. The Laboratory Floor Replacement, District Project 100008 (Project) will replace the original flooring built in the early 2000's with an upgraded moisture system to prevent delamination from the concrete August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 8 of 64 Page 2 of 10 subsurface. Attachment 1 shows the project location. The Lab is not expected to be closed during the replacement work. Calpo, Hom and Dong Architects, Inc. (CH&D) prepared the plans and specifications for the Project. The Engineer's estimate for construction is $250,000. This Project was advertised on June 26 and July 1, 2023. Three bids ranging from $246,800 to $275,700 were received and publicly opened on July 21, 2023. The Capital Projects Division conducted a technical and commercial review of the bids and determined that S D M Construction is the lowest responsive and responsible bidder. A summary of bids received is shown in Attachment 2. Central San will administer the construction contract and provide construction management, administration, and submittal review. CH&D will provide technical assistance on an as -needed basis. Upon award, the General Manager will execute the Contract Documents subject to submittal requirements. CEQA Staff has concluded that this Project is exempt from CEQA under Central San CEQA Guidelines Section 15302 because it involves replacement of existing facilities at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Approval of this Project will establish the Board's independent finding that this Project is exempt from CEQA. ALTERNATIVES/CONSIDERATIONS An alternative would be to reject all bids. This is not recommended as the reflooring plans have been designed to allow the Lab to remain operational throughout construction and the existing system is deficient. I n time, the flooring could be a safety or tripping hazard as it continues to delaminate. FINANCIAL IMPACTS The total estimated project cost is $389,000 including design, bid price, contingency, construction management, consultant costs, equipment purchase, workspace modifications as detailed in Attachment 3. The replacement work is included in the Fiscal Year 2023-24 District Budget, shown on page 257 with a total budget of $1,450,000 million. To date $1,296,000 million has been spent to complete the roof replacement and building seismic upgrades. As part of the project, Central San will also replace laboratory equipment at the end of its useful life ($50,000). Furthermore, the project will pay for conversion of a copy machine area into two new office spaces using Central San's furniture vendor. Since these project costs will be included, a total of $1,685,000 million will be needed to complete the entire scope for the Lab. A balance of $235,000 is required to fund the Project and will be transferred under the General Manager's delegated authority ($500,000 maximum) in the Capital Improvement Program for individual project budgets. The transfer will be from the Capital I mprovement Budget Contingency account which has adequate funds. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this matter at its August 14, 2023 meeting and recommended RECOMMENDED BOARD ACTION Staff recommends the following: 1. Find that the Project is exempt from CEQA; and August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 9 of 64 Page 3 of 10 2. Award a construction contract in the amount of $246,800 to SDM Construction, the lowest responsive and responsible bidder, for the construction of the Laboratory Floor Replacement, District Project 100008. Strategic Plan re -In GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations GOAL FIVE: Safety and Security Strategy 1 - Reduce and eliminate risks of injury or illness GOAL SIX: Infrastructure Reliability Strategy 2 - Execute long-term capital renewal and replacement program ATTACHMENTS: 1. Project Location Map 2. Summary of Bids 3. Post B id/P reconstruction Estimate 4. Presentation August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 10 of 64 Page 4 of 10 0 200 400 wFEET r� 0� L IL . OI �. ❑ PROJECT AREA LABORATORY BUILDING Basin A South CONSTRUCTION STAGING AREA 11 /, —ems, MAIN GATE \��oF7* $o CLATCIERS(SOUTr SOLIDS NDITIONI 3UILDINC 0 0 L---J, ❑ PUMP AND BLOWER BUILDING O POD IMHOFF PLACE 70 SM., Central Contra Costa Attachment Sanitary District Laboratory Floor Replacement A190District Project 100008 1 ' Location Map Regular Committee Meeting Agenda Packet - Page 11 of 64 Page 5 of 10 ATTACHMENT 2 LABORATORY FLOOR REPLACEMENT DISTRICT PROJECT 100008 SUMMARY OF BIDS PROJECT NO.: 100008 NO. OF ADDENDA: 2 DATE/TIME: JULY 21, 2023/2:00 PM PROJECT NAME: LABORATORY FLOOR REPLACEMENT PROJECT MANAGER: MICHAEL CUNNINGHAM PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ, CA ENGINEER'S ESTIMATE: $250,000 NO. BIDDER BID PRICE 1 SDM Construction $246,800 Concord, California 2 CWS Construction Group, Inc. $257,000 Novato, California 3 Aztec Consultants, Inc. $275,700 San Ramon, California BIDS OPENED BY: /s/Eileen Hansen DATE: July 21, 2023 / 2:00 PM August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 12 of 64 Page 6 of 10 ATTACHMENT 3 LABORATORY FLOOR REPLACEMENT DISTRICT PROJECT 100008 POST-BID/PRECONSTRUCTION ESTIMATE No. Item Description Amounts % Of Construction Cost 1. CONSTRUCTION a. Construction Contract $246,800 b. Contingency at 15% $37,200 c. Equipment $50,000 d. Furniture convert copy area to two workshpaces $11,000 SUBTOTAL - CONSTRUCTION COST $345,000 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Construction Management $15,000 b. Consultants - Consultants $5,000 - Inspection $9,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $29,000 8% 3. PREBID EXPENDITURES a. Staff Engineering $5,000 b. Consultant Fees $10,000 SUBTOTAL - PREBID EXPENDITURES $15,000 4% 4. TOTAL ESTIMATED PROJECT COST $389,000 August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 13 of 64 Attachment 4 Page 7 of 10 Background Floors installed in early 2000's and are now in poor / condition. Typically, warrantied life is 15 years. The existing rubber flooring adhesive is failing and causing delamination throughout the Laboratory. The existing adhesive will be removed, a new moisture mitigation epoxy and new rubber floor will be installed. Carpets in the office area and breakroom will also be replaced. Cubicle with copy machine and mailbox will be converted into two new workspaces to better meet staffing needs. The Laboratory is not expected to be closed during the replacement work. Select laboratory equipment at the end of its useful life is being replaced to improve reliability of the Lab. August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 14 of 64 Page 8 of 10 Lab flooring has performed well over -2O years. However, moisture issues especially at seams have caused delamination Bid Results Engineer's Estimate: $250,000 Three bids received and opened on July 21, 2023 at 2 p.m. One bid arrived late on July 24, 2023 and was returned unopened to bidder. Lowest Bidder: SDM Construction I SDM Construction $246,800 2 CWS Construction Group, Inc. $257,000 3 Aztec Consultants, Inc. $275,700 k6homb - - August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 15 of 64 2 Page 9 of 10 Total Estimated Project Cost No. Item Description Amounts of Construction at T. CONSTRUCTION a. Construction Contract $248,800 b. Contingency at 15 % $37,200 c. Equipment $50,000 d. Fumilom convert copy area to two workshpaces $11 000000 SUBTOTAL- CONSTRUCTION COST $345,000 100% 2-CONSTRUCTION MANAGEMENT a. District Forces - Construction Management $15,000 b. Consu3ants - Consultants $5,000 -Inspection 9 000 SUBTOTAL -CONSTRUCTION MANAGEMENT $29,000 0% 3_ PREBID EXPENDITURES a_ Staff Engineenng $5,000 b. Consultant Fees $10 000 SUBTOTAL- PREBID EXPENDITURES S15000 4% 4. TOTAL ESTIMATED PROJECT COST $389,000 Committee Recommendation: Staff recommends the following: Find that the Project is exempt from the California Environmental Quality Act; and Award a construction contract in the amount of $246,800 to SDM Construction, the lowest responsive and responsible bidder, for the construction of the Laboratory Floor Replacement, District Project 100008. August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 16 of 64 3 Page 10 of 10 August 14, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 17 of 64