Loading...
HomeMy WebLinkAbout03.a. Fiscal Year 2023-24 Capital Improvement Budget (CIB) and Ten-Year Capital Improvement Plan (CIP)Page 1 of 8 Item 3.a. F__1_448�411C_S0 May 8, 2023 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: EDGAR J. LOPEZ, PROVISIONAL DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES REVIEWED BY: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: REVIEW PROPOSED FISCAL YEAR 2023-24 CAPITAL IMPROVEMENT BUDGET (Cl B)AND TEN-YEAR CAPITAL IMPROVEMENT PLAN (CIP) Staff will present a summary of the proposed Fiscal Year 2023-24 CI B and 2023 Ten -Year Cl P for review and discussion. Strateaic Plan re -In GOAL ONE: Customer and Community Strategy 1— Deliver high -quality customer service, Strategy 3 - Build neighborhood and industry relations GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations GOAL FOUR: Governance and Fiscal Responsibility Strategy 1 - Promote and uphold ethical behavior, openness, and accessibility, Strategy 3 - Maintain financial stability and sustainability GOAL FIVE: Safety and Security Strategy 1 - Reduce and eliminate risks of injury or illness, Strategy 2 - Protect Personnel and assets from threats and emergencies, Strategy 3 - Understand and reduce impacts of cybersecurity attacks GOAL SIX: Infrastructure Reliability Strategy 1 - Manage assets optimally, Strategy 2 - Execute long-term capital renewal and replacement program GOAL SEVEN: Innovation and Agility Strategy 1 - Leverage data analytics to become a more efficient utility ATTACHMENTS: 1. Presentation May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 3 of 25 Page 2 of 8 Fiscal Year (FY) 2022-23 Major Accomplishments Regulatory and Safety Re -bid the Solids Handling Facility Improvements, Phase (Ph.) 1A with new air pollution control equipment, seismic modifications and other needed improvements at the Solids Conditioning Building. Sewer Infrastructure Replacement Replaced or rehabilitated up to 7 miles of public sewers in the service area, public streets, and backyard easements. Treatment Plant Infrastructure Replacement Completed the Pump Station Upgrades, Ph. 1 in Orinda and Moraga. Continuing construction of the Filter Plant and Clearwell Improvements, Ph. 1Afor reliable recycled water storage and electrical improvements. Continuing construction of the Influent Pump Electrical Improvements and Electric Blower Improvements. Started construction of the Pump Station Upgrades, Ph. 2 (A & B) for new stations at Maltby and Fairview, and renovation of Martinez. May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 4 of 25 1 Page 3 of 8 CIB and Project Prioritization Key Asset Replacement Consistent with Asset Management Program Improves Reliability and System Performance Increases Capacity to Meet Projected Build -out Improves Facility -Wide Resiliency T• i Driven or complies with Regulatory Requirements or Mandates i Impacts or needed improvements to continue Regulatory Required for Safe & Reliable Operations Reduces Potential Health or Safety Hazards Optimizes Capital or Operations and Maintenance Costs t. [ Increases Sustainable Use of Natural or Existing Resources Reduces Social and or Environmental Impacts Supports Timely Adoption of Technology Improvements 1 Meets Commitment with Outside Agency or Existing Contract + t•' Implements Board of Directors' Policy/Priority Impacts Phasing or Implementation Schedule j May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 5 of 25 2 Page 4 of 8 Major Projects Summary for Next FY: TREATMENT PLANT • Solids Handling Facility Improvements, Ph. IA (Construction) • Steam Renovations, Ph. I (Design/Construction) • UV Disinfection Replacement & Hydraulic Improvements (Design) • Aeration Basins Diffuser Replacement (Ph. I Construction) GENERALIMPROVEMENTS • Technology Strategic Plan • Permit Counter Software and Information Technology Development • Vehicle Replacement and Equipment Acquisition (Purchases) • Electric Charging Stations (CSO and TP) RECYCLED WATER • Filter Plant and Clearwell Improvements, Ph. IA (Construction) • Filter Plant and Clearwell Improvements, Ph. I B (Electrical Design) Closing Projects in FY 2022-23 COLLECTION SYSTEM Sewer Renovation Projects: Design: • Downtown Walnut Creek — Locust Construction: • Walnut Creek, Ph. 16 Pleasant Hill, Ph.2 South Orinda, Ph. 9 Lafayette, Ph. 15 Martinez, Ph.7 Pump Stations (Construction): San Ramon Electrical Upgrades Ph. 2: Martinez/Fairview/Maltby Collection System Planning, District Project (DP) 8419 Pump Station Upgrades, Ph. 1, DP 8436 Pumping Station Equipment & Piping Replacement Phase 2, DP 8442 Maintenance Access Cover Modifications, DP 8448 North Orinda Sewer Renovation, Phase 8, DP 8463 Walnut Creek Sewer Renovation, Phase 15, DP 8465 Cured -In -Place Pipe Blanket Contract, DP 100005 Treatment Plant Planning, DP 7363 (Re -occurring in FY 2023) Treatment Plant Safety Enhancement, Ph. 5, DP 7364 Condition Assessment of Buried Pipelines, DP 7371 (Postponed) Outfall Monitoring Improvements, DP 100018 Capital Legal Services, DP 8230 (Re -occurring in FY 2023) IT Development FY 2016-25, DP 8240 (Re -occurring in FY 2023) May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 6 of 25 3 Page 5 of 8 New Projects in FY 2023-24 by Program Collection System: Collection System Planning 2023+ ($2 M Total), 10-year project Pumping Station Equipment & Piping Replacement 2023+ ($2 M Total), 10-year project Maintenance Access Cover Modifications 2023+ ($3.55 M), 10-year project Pumping Station SCADA & PLC Upgrades ($2.15 M) M = million New Projects in FY 2023-24 by Program Continued Treatment Plant: Treatment Plant Planning 2023+ ($2.5 M Total), 10-year project Plant Control System Input/Output Replacement, Ph. 3 ($2.8 M) General Improvements: Capital Legal Services 2023+ ($.25 M Total), 10-year project IT Development 2023+ ($5.54 M Total), 10-year project NetZero Study ($.20 M Total) M = million May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 7 of 25 4 Page 6 of 8 CIB Modifications - Carry -Forward Changes The following total estimated project budgets were modified: D• 7348 Budget . Date $39,518,687 $27,518,687 r $12 M moved to future years due to timeline changes. 7341 2,550,000 2,150,000 Project delayed and being managed by Flood Control District. 7357 1,421,000 521,000 Project downsized and awaiting IT Strategic Plan outcome. 7370 4,405,000 3,605,000 Procurement delays and budget moved to other projects or future. 100001 1 1,800,000 1,300,000 Spending projections and timeline updated. 100010 1,250,000 250,000 Project delivery under evaluation. 100014 1,500,000 800,000 Spending projections and timeline updated. 100030 6,700,000 5,700,000 Scope downsized and changed. 100034 500,000 0 Program to start FY 2023. 100035 1,000,000 800,000 Spending projections updated. 7366 930,000 1 530,000 iSpending projections updated. 100036 200,000 1 100,000 ISpending projections updated. Total $61,774,687 $43,274,687 $18.5 M decrease in carry -forward budget, not including closed project savings. May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 8 of 25 5 Page 7 of 8 May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 9 of 25 Page 8 of 8 May 8, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 10 of 25