Loading...
HomeMy WebLinkAbout06.b. Receive summary of Central San's 2022 Energy Usage Page 1 of 6 Item 6.b. CENTRALSAN jdf A- hom CENTRAL CONTRA COSTA SANITARY DISTRICT March 16, 2023 TO: HONORABLE BOARD OF DIRECTORS FROM: CLINT SHIMA, SENIOR ENGINEER REVIEWED BY: NEIL MEYER, PLANT MAINTENANCE DIVISION MANAGER PAUL SEITZ, PROVISIONAL DIRECTOR OF OPERATIONS ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE SUMMARY OF CENTRAL SAN'S 2022 ENERGY USAGE Staff will present a summary of Central San's 2022 energy usage. Strategic Plan Tie-In GOAL TWO: Environmental Stewardship Strategy 4- Identify and advance sustainability initiatives, including reducing energy usage and emissions GOAL SEVEN:Innovation and Agility Strategy 1 - Leverage data analytics to become a more efficient utility ATTACHMENTS: 1. Presentation March 16, 2023 Regular Board Meeting Agenda Packet- Page 73 of 82 Page 2 of 6 March 16,2023 -40— Summary of Central San's 2022 Energy Usage AA Board of Directors Meeting Clint Shima,P.E. Senior Engineer Plant Maintenance Division j 7 ' Table of Contents Central San's Energy Usage o Tracked Monthly o Board of Directors Updated Quarterly Treatment Plant 2021 Versus _ 2022 AN Monthly Usage Statistics - Marin Clean Energy(MCE) Impact General Energy Information Solar Panels l 4' March 16, 2023 Regular Board Meeting Agenda Packet- Page 74 of 82 1 Page 3 of 6 TREATMENT PLANT USAGE STATISTICS 2021 2022 Natural Gas (NG): 424,000 MMBtu $2.61M 444,000 MMBtu $3.9M Landfill Gas (LFG): 81,000 MMBtu $455k 82,000 MMBtu $492k Totals: 505,000 MMBtu $3.11V! 526,000 MMBtu $4.4M Electricity 1,628,000 kWh $666k 2,818,000 kWh $1,134k (PG&E&MCE): Cogeneration: 22,656,000 kWh 21,642,000 kWh Totals: 24,284,000 kWh $3.7M 24,450,000 kWh $5.5M One Million British Thermal Unit(MMBtu) Kilowatt Hour(kWh) 6,P6acifi'cGasand Electric(PG&E) Million(M) Thousands(k) d Total Monthly Usage Statistics* Total Costs (NG, LFG, and Electricity)* - o Range: $408,283 to $782,101 o Average: $525,000 Average Cost/ Million Gallons (MG): $514 ►� ' Average kWh / MG: 1,963 Area Cost Breakdown ; o Treatment Plant: 86%—93% o Pumping Stations: 6%— 11% o Collection System Operations Facility: 1% - 7% F 'Includes Treatment Plant,Pumping Stations,and Collection System Operations facility 1 March 16, 2023 Regular Board Meeting Agenda Packet- Page 75 of 82 2 Page 4 of 6 MCE Impact (MCS Savings: Approximately $39,000 compared to PG&E rates MCE: Light Green is 60% renewable Total PG&E and MCE 2022 Cost: $1.1M MCE 2022 Cost: $319,000 General Energy Information Landfill Gas Ceiling of$6/ MMBtu saved Central San $283,000 Agreement renewal in September Renewable Energy: —25% Natural Gas PricesAr -., o 2018 Average: $3.24/ MMBtu o 2019 Average: $3.04/ MMBtu o 2020 Average: $3.04/ MMBtu o 2021 Average: $3.91 / MMBtu o 2022 Average: $6.77/ MMBtu March 16, 2023 Regular Board Meeting Agenda Packet- Page 76 of 82 3 Page 5 of 6 General Energy Information Natural Gas Markets Russian invasion of Ukraine Liquefied Natural Gas (LNG)over$50 / MMBtu in Asia and Europe o Freeport Facility shutdown PG&E Public Safety Power Shutoff(PSPS) outages No PSPS in 2021 or 2022 Cogeneration o Breakeven cost$11.93/dekatherm (dth), monthly average 2022 Greenhouse Gas: Below 25,000 Carbon Dioxide Equivalent (CO2e) Metric Ton (MT) Br"shutdown for Greenhouse Gas (GHG) i � h Installed at Household Hazardous Waste Facility and Collection Systems Operations Facility Solar Panels 2021 Produced: 269 Megawatt Hour (MWh) 2022 Produced: 293 MWh V - ! N .OS .I .i March 16, 2023 Regular Board Meeting Agenda Packet- Page 77 of 82 4 Page 6 of 6 Que�tio I !Wlow io) f March 16, 2023 Regular Board Meeting Agenda Packet- Page 78 of 82 S