Loading...
HomeMy WebLinkAbout04.a. Update on Improvements to the San Pablo Watershed Force MainPage 1 of 5 Item 4.a. F__1_448�411C_S0 March 13, 2023 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: PAUL SEITZ, PROVISIONAL DIRECTOR OF OPERATIONS REVIEWED BY: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE OF THE SAN PABLO WATERSHED FORCE MAIN IMPROVEMENTS This presentation will provide the Committee with an update on the improvements to protect the District's force mains in the San Pablo Watershed. Strategic Plan re -In GOAL ONE: Customer and Community Strategy 1— Deliver high -quality customer service GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations GOAL SIX: Infrastructure Reliability Strategy 1 - Manage assets optimally ATTACHMENTS: 1. Presentation March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 24 of 43 Page 2 of 5 March 13, 2023 SAN PAB LO WATERSHED FORCE MAIN IMPROVEMENTS Paul A. Seitz Provisional Director of Operations Introduction During the last three years, two Force Mains (FMs) have been damaged by contractors Both incidents resulted in Sanitary Sewer Overflows (SSOs) The Collection System Operations (CSO) Division has made several improvements to prevent this from occurring in the future In addition to CSO's improvements, the Asset Management/Geographic Information System (GIS) and Capital Project workgroups added additional enhancements to protect FMs AR&MM�w1aw ---. am March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 25 of 43 1 Page 3 of 5 Standard Operating Procedure (SOP) The SOP was reviewed and revised to place high priorities on FMs, Recycled Water (ReW), and 15" and greater gravity pipelines If Underground Service Alert (USA) request is within 50' of a FM: Field visit required to review USA markings Determine if the FM may be impacted If the FM may be impacted, an additional field visit with the CSO Field Superintendent and contractor Field Superintendent can escalate to CSO Division Manager Continuous Improvement — pictures of FM markings showing location will be included in GeoPortal Staffing in Locating Section Modifications have been made to staffing in the Locating section at CSO Prior to the incidents, the Locating section was staffed with 1 full time employee Coverage for the Locating section was made by the available Maintenance Crew Leader (MCL) CSO has dedicated an additional MCL as a permanent backup for locating requests The backup MCL has been given additional 6-months training via job shadowing March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 26 of 43 2 Page 4 of 5 Asset Management / GIS f Asset Management workgroup created five maps that highlight the FM locations Maps have provided additional awareness and the locations of the FM assets Maps have been installed in the CSO hallway adjacent to the Crew Room FMs are now highlighted in yellow in GeoPortal to show their importance Location of FMs In the past, it was difficult to determine the FM locations due to being installed without tracer wires CSO and Capital Projects have completed the field locations of ALL FMs in the San Pablo Watershed (SPW) Currently, the FM locations have been temporarily marked with paint, stakes, and green whiskers Pictures of all FM temporary marks have been taken IL L—Oriada Plimp Slaticn Force Mains F' 1 March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 27 of 43 3 Page 5 of 5 t Next Steps N Permanently mark major FMs in SPW i2917 1 7-- { Attach location pictures to the asset in GeoPortal Prioritize the marking of remaining FMs in the Central San service area _ Permanently mark remaining FMs Continuous Improvement — continue to F look for improvements for locating to protect Central San's assets =r = b r CSO clears approximately 30,000 USA requests per year Questions 4 March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 28 of 43 4