FROM: PAUL SEITZ, PROVISIONAL DIRECTOR OF OPERATIONS
REVIEWED BY: ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE UPDATE OF THE SAN PABLO WATERSHED FORCE MAIN
IMPROVEMENTS
This presentation will provide the Committee with an update on the improvements to protect the District's
force mains in the San Pablo Watershed.
Strategic Plan re -In
GOAL ONE: Customer and Community
Strategy 1— Deliver high -quality customer service
GOAL TWO: Environmental Stewardship
Strategy 1 - Achieve compliance in all regulations
GOAL SIX: Infrastructure Reliability
Strategy 1 - Manage assets optimally
ATTACHMENTS:
1. Presentation
March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 24 of 43
Page 2 of 5
March 13, 2023
SAN PAB LO
WATERSHED
FORCE MAIN
IMPROVEMENTS
Paul A. Seitz
Provisional Director of Operations
Introduction
During the last three years, two Force
Mains (FMs) have been damaged by
contractors
Both incidents resulted in Sanitary
Sewer Overflows (SSOs)
The Collection System Operations (CSO)
Division has made several
improvements to prevent this from
occurring in the future
In addition to CSO's improvements, the
Asset Management/Geographic
Information System (GIS) and Capital
Project workgroups added additional
enhancements to protect FMs
AR&MM�w1aw ---.
am
March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 25 of 43 1
Page 3 of 5
Standard Operating Procedure (SOP)
The SOP was reviewed and revised to place high
priorities on FMs, Recycled Water (ReW), and 15" and
greater gravity pipelines
If Underground Service Alert (USA) request is within 50'
of a FM:
Field visit required to review USA markings
Determine if the FM may be impacted
If the FM may be impacted, an additional field visit
with the CSO Field Superintendent and contractor
Field Superintendent can escalate to CSO Division
Manager
Continuous Improvement — pictures of FM markings
showing location will be included in GeoPortal
Staffing in Locating Section
Modifications have been made to staffing in
the Locating section at CSO
Prior to the incidents, the Locating section
was staffed with 1 full time employee
Coverage for the Locating section was made
by the available Maintenance Crew Leader
(MCL)
CSO has dedicated an additional MCL as a
permanent backup for locating requests
The backup MCL has been given additional
6-months training via job shadowing
March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 26 of 43 2
Page 4 of 5
Asset Management / GIS f
Asset Management workgroup created
five maps that highlight the FM locations
Maps have provided additional awareness
and the locations of the FM assets
Maps have been installed in the CSO
hallway adjacent to the Crew Room
FMs are now highlighted in yellow in
GeoPortal to show their importance
Location of FMs
In the past, it was difficult to determine the
FM locations due to being installed without
tracer wires
CSO and Capital Projects have completed
the field locations of ALL FMs in the San
Pablo Watershed (SPW)
Currently, the FM locations have been
temporarily marked with paint, stakes, and
green whiskers
Pictures of all FM temporary marks have
been taken
IL L—Oriada Plimp Slaticn Force Mains
F' 1
March 13, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 27 of 43 3
Page 5 of 5
t
Next Steps
N
Permanently mark major FMs in SPW
i2917
1
7--
{
Attach location pictures to the asset in
GeoPortal
Prioritize the marking of remaining FMs
in the Central San service area
_
Permanently mark remaining FMs
Continuous Improvement — continue to
F
look for improvements for locating to
protect Central San's assets
=r =
b r
CSO clears approximately 30,000 USA
requests per year
Questions
4