HomeMy WebLinkAbout05.b. Receive annual update on Regulatory Compliance Page 1 of 7
Item 5.b.
CENTRAL SAN
Y-109-ITMEN ME
February 22, 2023
TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE
FROM: LORI SCHECTEL, ENVIRONMENTALAND REGULATORY COMPLIANCE
DIVISION MANAGER
REVIEWED BY: DANEA GEMMELL, PROVISIONAL DIRECTOR OF ENGINEERING AND
TECHNICAL SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE THE ANNUAL UPDATE ON REGULATORY COMPLIANCE
Attached is the presentation for Regulatory Compliance's annual update.
Strategic Plan Tie-In
GOAL TWO: Environmental Stewardship
Strategy 1 -Achieve compliance in all regulations, Strategy 4- Identify and advance sustainability initiatives, including
reducing energy usage and emissions
ATTACHMENTS:
1. Presentation
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 12 of 21
Page 2 of 7
February 22,2023
POO
ANNUAL
REGULATORY
UPDATES
Real Estate, Environmental and
Planning Committee Meeting •
. 1
Lori Schectel -
Environmental and Regulatory Compliance Division Manager
1
Significant
Regulatory Updates
Air
Wastewater
Contaminants of Emerging
Concern (CECs)
r.
2
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 13 of 21 1
Page 3 of 7
Air-Related Updates
Clean Air Act Section 129 Sewage Sludge Incinerator Regulations
January 2022 Furnace 2 source test—all parameters passed
One violation for Furnace 2 bypass event in 2022
BAY AREA AIR CZUALITY .`
MANAGEMENT DISTRICT
Title V Compliance
Authority-to-Construct permit obtained for Lower Orinda Pumping Station standby
engine
Three Reportable Compliance Activities in 2022 _
No Title V violations in 2022
3
Air-Related Updates
CALIFORNIA
Alk kE50VkCE5 BOARD
California Air Resources Board(CARB)Advanced Clean Fleets Regulation(Draft)
Adoption by Spring 2023 _
Zero-emission vehicles(ZEV)required for replacement of medium-duty and
heavy-duty vehicles
2024:50%of new vehicles must be ZEVs —
2027: 100%of new vehicles must be ZEVs
OR
ZEV phase-in milestones �-
Exemptions and extensions available to address delays,availability,and
emergency response
Develop Fleet Electrification Strategic Plan in 2023
NO
CARB Advanced Clean Cars II Regulation
Adopted August 2022
2035:all new passenger vehicles must be ZEVs ' f
4
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 14 of 21 2
Page 4 of 7
Air-Related Updates
CARB Heavy Duty Inspection and Maintenance(HDI/M)
Applies to existing on-road heavy-duty diesel vehicles '
Vehicle registration/reporting and annual fees
Routine compliance testing:
Scan of on-board diagnostics(OBD)data or;
Smoke opacity test and visual inspection !
CARB In-Use Off Road(IUGR)Diesel
Applies to existing off-road diesel vehicles>25 hp r �{
Phase out three Tier 0-2 construction diesel vehicles
Use of renewable diesel `
Public works contractors to provide a"Certificate of Reported Compliance"
Senate Bill 1383 Organics Diversion
Statewide target:50%2020,75%by 2025
Organics collection containers implemented
5
W•
CEC-Related Updates
Stewardship Program Implementation
SB 212: Pharmaceutical and Sharps Take-Back Timeline`
Requires manufacturers of pharmaceutical 6months
drugs and sharps to establish fund and Stewardship Plan Revi w Implemdayentation
P y Ueveloment Revi90 ew Period Im lementation Phase
manage a statewide take-backs stem for B�a�=ba> Programapeatar calve de pya Programapnata Stewardship
g y e4teaive suhmhs stewardship approval qy su6mitsfirs[annual planfully
medications and sharps
1/7/7021 planta Calli4de 1015/2021 report to GlBecyde Implemented
7/78021 3/31/2022 712/2012
Began July 2022
Program operator ~ Covered entities subled to CalRegd,fo
Local pharmaceutical collection managed by s.bm1t,,Aew dhip penaltiesifmvetedpmdua post first list
plan to Board of 01AKyde is not sublect to an approved aforoplient
MED-Project Pharmaryand other completeness review stewardship plan entities
appllra6le agenties 8/N2021 1!712031 9301I032
Sharps managed by MED-Project and others
`Iaaarmwrt w Ireflnt me abftryhrmtrsm mmedepe�7onMeduwtionWBaenloiPMrmaghmirxpriwmtheprogrmoper-
Currently,Central San maintains seven sites
I
6
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 15 of 21 3
Page 5 of 7
a�
CEC-Related Updates - PFAS �����e'"Oem•
EPP s Commfhmnls to Nctwn
The State Water Resource Control Board's (SWRCB) July 2020 Statewide
Per-and Polyfluoroalkyl Substances (PFAS) Investigative Order7� 1
Bay Area Clean Water Agencies(BACWA) Region 2 PFAS Study— o
Phase II Sampling—April 2022
Central San conducted internal sampling across plant and incinerator
emissions—May 2022 "
AB 2771 (Ban on PFAS in cosmetics)—signed by Governor on 8/30/22
AB 1817 (Ban on PFAS in textiles) —signed by Governor on 9/29/22
AB 2247 (PFAS disclosure bill)—vetoed by the Governor on 9/29/22
November 2022 Attorney General Bonta filed lawsuit against PFAS •a,,
manufacturers ••
US Environmental Protection Agency(EPA) 'Strategic Roadmap: EPA's
Commitments to Action' Progress
7
CEC-Related Updates - Microplastics
Senate Bill 1263—Development of a Statewide
Microplastics Strategy(2018)
Multi-year road map
2-Track approach to comprehensively manage
microplastics
Central San's Contributions to SB 1263
2021 sampling training video for California
Association of Sanitary Agencies(CASA)and the
Ocean Protection Council (OPC)
2022 Central San performed first part of removal
study across treatment process
To be completed in early 2023
Central San contributed funding for five
manuscripts produced by the San Francisco
Estuary Institute(SFEI)and Southern California
Coastal Water Research Project(SCCRWP)
8
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 16 of 21 4
Page 6 of 7
National Pollutant Discharge
Elimination System
(NPDES)-Related Updates
NPDES Treatment Plant Discharge Permit
New permit adopted June 8, 2022
Effective August 1, 2022
Mercury& PCBs Watershed Permit
New permit adopted December 14, 2022
Effective date: February 1, 2023 '
No changes to limits
Reduction of sampling frequencies
9
EVA
NPDES-Related Updates
State Toxicity Provisions -Test of Significant Toxicity (TST)
EPA and Office of Administrative Law(OAL)to sign provisions by mid- S�
2023
Transitional language in Region 2 permits started in late-2022
M I �
San Francisco Bay Nutrient Watershed Permit (NWP)
Expires 2024
For FY21/22, FY 22/23, BACWA contributed the required $2.2M,$1.8M
BACWA is developing its strategy for the third NWP
Summer 2022 algal bloom has impacted BACWXs strategy for NWP
Re-allocation of funds to prioritize modeling of harmful algal blooms
10
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 17 of 21 5
Page 7 of 7
Laboratory Accreditation
Update - The NELAC Institute (TNI) iv �V
Timeline Central San's Milestones '
The State Water Resource Control Board Successful third-party
(SWRCB)adopted new Lab Accreditation assessment to interim
standard: 'TNI minus 2,effective Jan.2021 standard in 2022
By Dec.31,2023-Comply with interim 2022 Environmental
Accreditation standard Laboratory Accreditation
After Jan. 1, 2024-Comply fully with 'TNI Program (ELAP)certificate
minus 2'Accreditation standard renewal was successful
What is New Purchased Laboratory
Information Management
Assessments and annual internal audits System (LIMS)Chemical
Proficiency testing requirements Inventory Module �► ,�
Personnel re uirements Scheduling 2023 TNI audit for �+
q 2024 renewal application `F
Document management
11
SSS WDR Requirements --
Sanitary Sewer Systems Waste Discharge Requirements(SSS WDR) µ
State Water Board adopted General Order December 6,2022,effective June 5,2023
New discharge prohibition: potential to discharge to surface waters of the State unless
promptly cleaned up and reported
Revised discharge prohibition:replaced"Waters of the U.S"with"Waters of the State'
Update Spill Emergency Response Plan(SERP)(2023)
New Spill Category 4(<50 gallons)—simplified reporting
New language requires spill coordination with stormwater and drinking water utilities
.'•.:fir ,; 4 .
Administrativea= ,E
Monthly"No Spill"and Category 4 reporting in the California Integrated Water
Quality System(CIWQS)
More detailed annual reports
SSMP update frequency 5 years--), 6 years
Audit frequency 2 years-->3 years
Upload service area boundary maps(2025)
Update Sewer System Management Plan(SSMP)with new requirements(2025)
12
February 22, 2023 REEP Committee Meeting Agenda Packet- Page 18 of 21 6