Loading...
HomeMy WebLinkAbout15. Award a construction contract to Rehak General Engineering for the Annex Storage Building, District Project 100003Item 15. BOARD OF DI RECTORS POSIT ION PA PER M E E T ING D AT E:J A NUA RY 19, 2023 S UB J E C T: AW A R D A C O NS T R UC T I O N C O NT R A C T I N T HE A MO UNT O F $550,000 TO R E HA K G E NE R A L E NG I NE E R I NG, T HE L O W E S T R E S P O NS I V E A ND R E S P O NS I B L E B I D D E R, F O R T HE A NNE X S TO R A G E B UI L D I NG, D I S T R I C T P R O J E C T 100003; F I ND T HE P R O J E C T I S E X E MP T F R O M T HE C A L I F O R NI A E NV I R O NME NTA L Q UA L I T Y A C T; A ND A UT HO R I Z E UP TO A 20-P E R C E NT C O NT I NG E NC Y S UB M I T T E D B Y: W I L L I A M G R A NT, A S S O C I AT E E NG I NE E R I NI T I AT I NG D E PART M E NT: E NG I NE E R I NG A ND T E C HNI C A L S E RV I C E S- C A P I TA L P R O J E C T S RE V IE WE D B Y:NAT HA N HO D G E S, S E NI O R E NG I NE E R E D G A R J . L O P E Z , C A P I TA L P R O J E C T S D I V I S I O N MA NA G E R R oger S . B ailey General Manager IS S UE On December 20, 2022, 11 sealed bids were received and opened for the construction of the Annex Storage B uilding, District P roject 100003 (Project). T he Board of Directors (Board) needs to consider award of the contract or reject bids within 50 days of the bid opening, and to include up to a 20 percent contingency. B AC K G RO UND T he purpose of this Project is to enhance Central S an’s properties through improvements to provide Operations a secure and saf e location f or equipment, materials, and spare parts storage. T he Annex is the main building, located across f rom the Headquarters Office Building in Martinez, occupied by P umping Stations staf f . F or the past several years, P umping Stations has increased its equipment procurement to meet the reliability concerns associated with P G&E ’s planned or emergency power shutdowns. S everal projects January 19, 2023 Regular Board Meeting Agenda Packet - Page 93 of 319 Page 1 of 6 have included the procurement of new emergency generators, pumps, and other needed equipment to ensure that Pumping S tations can continue to operate in emergency conditions. I n addition, C apital Projects continues to renovate and improve the maintenance serviceability of C entral San’s pumping stations which has increased spare parts and electrical equipment. T his Project will construct a new 3,200 square-foot pre-engineered metal building to the A nnex property within the gated parking lot, as shown in A ttachment 1 – Project L ocation Map. T he new f acility will include power f or lights, electrical equipment outlets, and security. T he Plant Maintenance division at the treatment plant supports pumping stations and will also use the f acility for storage, as needed. C entral San staff prepared the plans and specifications f or the Project, which included the design of the concrete f oundation. T he Engineer’s estimate is $630,000. T he Project was advertised on November 21 and November 28, 2022. 11 sealed bids ranging from $550,000 to $1,078,508 were received and publicly opened on D ecember 20, 2022. T he Capital P rojects Division conducted a technical and commercial review of the bids and determined that Rehak General Engineering (Rehak) is the lowest responsive and responsible bidder. S taff received satisfactory feedback on ref erences provided for R ehak. Rehak is from the Central Valley and is also a metal building whole seller with a contractor ’s license. A summary of bids received is shown in Attachment 2. C entral San will administer the construction contract and provide contract administration, inspection, survey, of f ice engineering, and submittal review. Consultant inspection may be used to supplement staff on an as-needed basis. C alifornia E nvironmental Quality Act (C E Q A) Staf f has concluded that this project is exempt f rom C E Q A under Central S an’s C E Q A Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant ef f ect on the environment. T his certainty is based on C entral San’s past experience with numerous construction projects of this nature on the treatment plant campus; its long familiarity with the project sites; C entral San’s impact-limiting construction specif ications, and the impact- limiting components of the project description. C entral San’s specif ications are standardized general and special conditions that are made part of the project to address environmental considerations, as well as compliance with applicable federal, state, county, district, municipal and local laws, ordinances, orders, and regulations. A pproval of this project will establish the Boards independent f inding that this project is exempt from C E Q A . ALT E RNAT I V E S /C O NS I D E RAT IO NS R eject all bids, which is not recommended. An internal audit of high value assets and non-assets was recently completed and noted that additional storage f acilities at the treatment plant and or pumping stations is recommended, including access and security measures f or the Project. F I NANC IAL I M PAC T S T he total estimated project cost is $910,000, which includes design, bid price, permits, contingency, and construction management as shown in Attachment 3. T his Project is included and budgeted in the F iscal Year 2022-23 C apital I mprovement Budget on P age 274 under the Property R epairs and I mprovements with a total estimated budget of $1,450,000. T he remaining budget will be used to complete property repairs such as asphalt repairs to the P lant Operations parking lot, replace broken concrete or walkways, and repair or upgrade interior of f ice work areas. January 19, 2023 Regular Board Meeting Agenda Packet - Page 94 of 319 Page 2 of 6 C O M M I T T E E RE C O M M E ND AT IO N T he E ngineering and Operations Committee reviewed this subject at its J anuary 5, 2023 meeting and recommended B oard approval. RE C O M M E ND E D B O ARD AC T I O N Staf f recommends the following B oard action: 1. F ind the Project is exempt f rom C E Q A; 2. Award a construction contract in the amount of $550,000 for the construction of the Annex S torage Building, D istrict Project 100003, to Rehak General Engineering I nc., the lowest responsive and responsible bidder, and 3. Authorize the General Manager to execute the C ontract Documents subject to submittal requirements and include up to 20-percent contingency. Strategic Plan Tie-I n G O A L O N E: Customer and C ommunity Strategy 1 – Deliver high-quality customer service G O A L TW O: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations G O A L FI VE: Safety and Security Strategy 2 - Protect personnel and assets from threats and emergencies G O A L S I X: I nfrastructure Reliability Strategy 1 - Manage assets optimally AT TAC HM E NT S : D escription 1. P roject L ocation Map 2. S ummary of B ids 3. P ost Bid/Preconstruction Estimate January 19, 2023 Regular Board Meeting Agenda Packet - Page 95 of 319 Page 3 of 6 Imhoff D r Blum RdIm h o f f Pl Wa l n u t C r e e k Grayson Creek100003 Project Location Detail Area 680 ·|}þ44 ·|}þ44 ·|}þ242242 Pleasant Hill Concord Martinez 680 R District-Owned Property Project Location and Number Annex Storage Building District Project 100003 Location Map Date: 12/16/2022 0 400 800 FeetR N:\GIS\Projects\GeneralAdmin\BoardPP\Pro_BoardPP\Pro_BoardPP.aprx MMNote: Central San data as of December 2022. Map Displayed in North American Datum of 1983 California State Plane, Zone III FIPS 0403, US Feet ·|}þ44 680 1 Attachment January 19, 2023 Regular Board Meeting Agenda Packet - Page 96 of 319 Page 4 of 6 ATTACHMENT 2 ANNEX STORAGE BUILDING DISTRICT PROJECT 100003 SUMMARY OF BIDS BIDS OPENED BY: /s/Amelia Berumen DATE: December 20, 2022 at 2 PM PROJECT NO.: 100003 NO. OF ADDENDA: 2 DATE/TIME: DECEMBER 20, 2022 / 2:00 PM PROJECT NAME: ANNEX STORAGE BUILDING PROJECT MANAGER: WILLIAM GRANT PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ CA ENGINEER'S ESTIMATE: $630,000 NO. BIDDER BID PRICE 1 Rehak General Engineering Auberry, CA 93602 $550,000 2 Mars Construction Pleasant Hill, CA 94523 $669,000 3 Plummerbuilt, Inc. Herald, CA 95638 $742,000 4 C. Overaa & Co. Richmond, CA 94801 $816,724 5 GCCI, Inc. Santa Rosa, CA 95401 $836,000 6 Aztec Consultants, Inc. San Ramon, CA 94583 $851,433 7 Mauri Concrete Construction Company El Sobrante, CA 94803 $910,000 8 Lohr Construction Co., Inc San Francisco, CA 94109 $943,700 9 Roebbelen Contracting, Inc. El Dorado Hills, CA 95762 $938,611 10 CWS Construction Group, Inc. Novato, CA 94945 $1,045,000 11 NBC Construction & Engineering, Inc. San Francisco, CA 94110 $1,078,508 January 19, 2023 Regular Board Meeting Agenda Packet - Page 97 of 319 Page 5 of 6 No. Item Description % of Construction Cost 1.CONSTRUCTION a. Construction Contract $550,000 b. Contingency at 20%$110,000 c. Security Installation $50,000 d. Building Permit $10,000 SUBTOTAL - CONSTRUCTION COST $720,000 100% 2.CONSTRUCTION MANAGEMENT a. District Forces - Construction Management $60,000 - Survey $10,000 b. Consultants - Material Testing $10,000 - Structural $10,000 - Inspection $30,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $120,000 17% 3.PREBID EXPENDITURES a. Staff Engineering $60,000 b. Consultant Fees $10,000 SUBTOTAL - PREBID EXPENDITURES $70,000 10% 4.TOTAL ESTIMATED PROJECT COST $910,000 ANNEX STORAGE BUILDING DISTRICT PROJECT 100003 POST-BID/PRECONSTRUCTION ESTIMATE ATTACHMENT 3 Amounts January 19, 2023 Regular Board Meeting Agenda Packet - Page 98 of 319 Page 6 of 6