HomeMy WebLinkAbout05.c. Review draft Position Paper to award a construction contract to Rehak General Engineering for the Annex Storage Building, District Project 100003Page 1 of 6 Item 5.c. CDrrEN1 RAL SAN BOARD OF •' CENTRAL CONTRA COSTA SANITARY DISTRICT POSITION PAPER DRAFT i MEETING DATE: JANUARY5, 2023 SUBJECT: REVIEW DRAFT POSITION PAPER TO AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $550,000 TO REHAK GENERAL ENGINEERING, THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER FOR THE ANNEX STORAGE BUILDING, DISTRICT PROJECT 100003; FIND THE PROJECT IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITYACT; AND AUTHORIZE UP TO A 20-PERCENT CONTINGENCY SUBMITTED BY: INITIATING DEPARTMENT: WILLIAM GRANT, ASSOCIATE ENGINEER ENGINEERING AND TECHNICAL SERVICES - CAPITAL PROJECTS REVIEWED BY: NATHAN HODGES, SENIOR ENGINEER EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER ISSUE On December 20, 2022, 11 sealed bids were received and opened for the construction of the Annex Storage Building, District Project 100003 (Project). The Board of Directors (Board) needs to consider award of the contract or reject bids within 50 days of the bid opening, and to include up to a 20 percent contingency. BACKGROUND The purpose of this Project is to enhance Central San's properties through improvements to provide Operations a secure and safe location for equipment, materials, and spare parts storage. The Annex is located across from the Headquarters Office Building (HOB) in Martinez and is the main building occupied by pumping stations staff. For the past several years, pumping stations has increased its equipment procurement to meet the reliability concerns associated with PG&E's planned or emergency power shutdowns. Several projects have included the procurement of new emergency generators, pumps, and other needed equipment to ensure that the pumping stations can continue to operate in emergency conditions. I n addition, Capital Projects continues to renovate and improve the maintenance serviceability of Central San's pumping stations which has increased spare parts and electrical equipment. January 5, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 27 of 34 DRAFT Page 2 of 6 This Project will construct a new 3,200 square -foot pre -manufactured metal building to the Annex property within the gated parking lot, as shown in Attachment 1 — Project Location Map. The new facility will include power for lights, equipment plugs, and security. The maintenance division at the treatment plant supports pumping stations and will also use the facility for storage, as needed. Central San staff prepared the plans and specifications for the Project. The Engineer's estimate is $630,000. The project was advertised on November 21 and November 28, 2022. Eleven (11) sealed bids ranging from $550,000 to $1,078,508 were received and publicly opened on December 20, 2022. The Capital Projects Division conducted a technical and commercial review of the bids and determined that Rehak General Engineering (Rehak) is the lowest responsive and responsible bidder. References were provided for Rehak, and staff received satisfactory feedback. Rehak is from the central valley and is also a metal building representative with a contractor's license. A summary of bids received is shown in Attachment 2. Central San will administer the construction contract and provide contract administration, inspection, survey, office engineering, and submittal review. Consultant inspection may be used to supplement staff on an as -needed basis. California Environmental Quality Act (CEQA) Staff has concluded that this project is exempt from CEQA under Central San's CEQA Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. This certainty is based on Central San's past experience with numerous construction projects of this nature on the treatment plant campus; its long familiarity with the project sites; Central San's impact -limiting construction specifications, and the impact - limiting components of the project description. Central San's specifications are standardized general and special conditions that are made part of the project to address environmental considerations, as well as compliance with applicable federal, state, county, district, municipal and local laws, ordinances, orders, and regulations. Approval of this project will establish the Boards independent finding that this project is exempt from CEQA. ALTERNATIVES/CONSIDERATIONS Reject all bids, which is not recommended. An internal audit of high value assets and non -assets was recently completed and noted that additional storage facilities at the treatment plant and or pumping stations is recommended, including access and security measures for the Project. FINANCIAL IMPACTS The total estimated project cost is $910,000, which includes design, bid price, permits, contingency, and construction management as shown in Attachment 3. This project is included and budgeted in the Fiscal Year (FY) 2022-23 Capital Improvement Budget (CI B) on Page 274 under the Property Repairs and Improvements with a total estimated budget of $1,450,000. The remaining budget will be used to complete property repairs such as asphalt repairs to the Plant Operations parking lot, replace broken concrete or walkways, and repair or upgrade interior office work areas. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this project at the meeting on January 5, 2022, and recommended January 5, 2023 EOPS Regular Committee Meeting Agenda Packet -Page 28 of 34 DRAFT Page 3 of 6 RECOMMENDED BOARD ACTION Staff recommends the following Board action: 1. Find the Project is exempt from CEQA; 2. Award a construction contract in the amount of $550,000 for the construction of the Annex Storage Building, District Project 100003, to Rehak General Engineering Inc., the lowest responsive and responsible bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to Submittal requirements and include up to 20-percent contingency. Strategic Plan Tie -In GOAL ONE: Customer and Community Strategy 1— Deliver high -quality customer service GOAL TWO: Environmental Stewardship Strategy 1 - Achieve compliance in all regulations GOAL FIVE: Safety and Security Strategy 2 - Protect Personnel and assets from threats and emergencies GOAL SIX: Infrastructure Reliability Strategy 1 - Manage assets optimally ATTACHMENTS: 1. Project Location Map 2. Summary of Bids 3. Post B id/P reconstruction Estimate January 5, 2023 EOPS Regular Committee Meeting Agenda Packet -Page 29 of 34 DRAFT I= Annex Storage Building District Project 100003 Location Q District -Owned Property \ In I Page 4 of 6 Map Date: 12/16/2022 Detail Area Martinez Concord Pleasant Hill o< _ 'mho 00003 000 .� Qo Projecto Location o^ o� �J i Q Project Location and Number I II Note: IT 0 400 81 Map Displayed in North American Datum of 1983 Attachment Central San data as of December 2022. H Feet California State Plane, Zone III FIPS O403, US Feet 1 January 5, 2023 EOPS Regular Committee Meeting Agenda Packet -Page 30 of 34 DRAFT Page 5 of 6 ATTACHMENT 2 ANNEX STORAGE BUILDING DISTRICT PROJECT 100003 SUMMARY OF BIDS PROJECT NO.: 100003 NO. OF ADDENDA: 2 DATE/TIME: DECEMBER 20, 2022 / 2:00 PM PROJECT NAME: ANNEX STORAGE BUILDING PROJECT MANAGER: WILLIAM GRANT PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ CA ENGINEER'S ESTIMATE: $630,000 NO. BIDDER BID PRICE 1 Rehak General Engineering $550,000 Auberry, CA 93602 2 Mars Construction $669,000 Pleasant Hill, CA 94523 3 Plummerbuilt, Inc. $742 000 Herald, CA 95638 ' 4 C. Overaa & Co. $816 724 Richmond, CA 94801 ' 5 GCCI, Inc. $836,000 Santa Rosa, CA 95401 6 Aztec Consultants, Inc. $851 433 San Ramon, CA 94583 ' 7 Mauri Concrete Construction Company $910,000 El Sobrante, CA 94803 8 Lohr Construction Co., Inc $943 700 San Francisco, CA 94109 ' 9 Roebbelen Contracting, Inc. $938,611 El Dorado Hills, CA 95762 10 CWS Construction Group, Inc. $1 045 000 Novato, CA 94945 ' 11 NBC Construction & Engineering, Inc. $1,078,508 San Francisco, CA 94110 BIDS OPENED BY: /s/Amelia Berumen DATE: December 20, 2022 at 2 PM January 5, 2023 EOPS Regular Committee Meeting Agenda Packet - Page 31 of 34 DRAFT Page 6 of 6 ATTACHMENT 3 ANNEX STORAGE BUILDING DISTRICT PROJECT 100003 POST-BID/PRECONSTRUCTION ESTIMATE No. Item Description Amounts % of Construction Cost 1. CONSTRUCTION a. Construction Contract $550,000 b. Contingency at 20% $110,000 c. Security Installation $50,000 d. Building Permit $10,000 SUBTOTAL - CONSTRUCTION COST $720,000 100% 2. CONSTRUCTION MANAGEMENT a. District Forces - Construction Management $60,000 - Survey $10,000 b. Consultants - Material Testing $10,000 - Structural $10,000 - Inspection $30,000 SUBTOTAL - CONSTRUCTION MANAGEMENT $120,000 17% 3. PREBID EXPENDITURES a. Staff Engineering $60,000 b. Consultant Fees $10,000 SUBTOTAL - PREBID EXPENDITURES $70,000 10% 4. TOTAL ESTIMATED PROJECT COST $910,000 January 5, 2023 EOPS Regular Committee Meeting Agenda Packet -Page 32 of 34 DRAFT