Loading...
HomeMy WebLinkAbout04.b. (Handout) Presentation Item 4.b. (Handout) August 31,2022 SOLIDS HANDLING FACILITY IMPROVEMENTS, PHASE 1A DISTRICT PROJECT 7348 STATUS UPDATE AND RECOMMENDED ACTIONS Engineering and Operations Committee Edgar J.Lopez,P.E. i Capital Projects Division Manager 1 J Nathan Hodges,P.E. Senior Engineer 1 Agenda 1 Background and Drivers 2. Design Status 3. Bid Schedule 4. Project Estimate and Budgets 5. Recommendations 1 Background and Drivers ftftwso 1 2 3 4 5 6&7 Background o Staff recommended to reject all bids for Phase 1. Total estimated project cost of $261,373,000. O O O 0 O MODIFY MULTIPLE NEW ASH AIR POLLUTION CENTRIFUGE ELECTRICAL SOLIDS CONDITIONING SLUDGE HEARTH HANDLING CONTROL DEWATERING SYSTEMS BUILARETROIIT BLENDING/ FURNACES AND LOADOUT (NEW WET SYSTEM STORAGE (AND SEISMIC) SCRUBBERS) 2 Drivers for Phase 1A (reduced scope) 61 .} , wadi Project Drivers End of Life Assets, Regulatory, Reliability & _-- Sustainability �- r New air pollution control equipment to meet air regulations today and in the future Cake pumps and centrifuge is beyond useful life Sludge blending tank cover needs replacement due to significant corrosion Incineration burners beyond useful life and replacement parts are extremely rare to get Improvements needed to keep solids process reliable for 15+years 1 Seismic improvements for safety and sustainability of the Solids Conditioning Building YI. 3 Design Status hwwwso Design Status Consulting team: CDM Smith, Inc. (Lead, model, overall construction sequence and mechanical systems) GHD, Inc. (Incinerator and air pollution control equipment) ArcSine Engineering (Electrical and lead controls designer) HDR Engineering, Inc. (Structural and Architectural) Degenkolb Engineers (Seismic Designer ) 4 Design Status Preparing bid documents, technical specifications and drawings Additional design required and recommended by staff, such as: Modifications to the new wet scrubber system for reliability and safety; and improved design for future modifications, if required More focus on improving project for constructability, equipment delays, realistic sequencing, and contract provisions Improved electrical, controls, and instrumental plans, and coordinated with all other disciplines Important Note: Design Team coordinated scope with Phase 2 ums, MJ Project for long term solids alternatives. Bid Schedule Final design completed in Bid Project November 2022 » » Bid Period December— March 2023 lulmit Final Tentative bid opening April 2023 « SRF Loan Budget Amount Amendment« SRF Review then Award (within Finalized Package 120 days from bid opening) 5 Project Estimate and Budgets Overall design costs (Phase 1 and 1A) - $21,000,000 (SRF Reimbursed) Construction Contract (Engr. Estimate) - $90,000,000 Seismic Improvements - $20,000,000 Project Contingency - $16,000,000 Construction Management - $22,000,000 Total Estimated Project Costs - $169,000,000 Fiscal Year 2022-23 Budget and CIP - $168,000,000 SRF Authorized Agreement to date - $173,100,000 Recommendations 6 Recommended Board Actions Staff recommends the following: Authorize the General Manager to amend four existing professional engineering services agreements under the Solids Handling Facility Improvements, Phase 1A for additional design and bidding services with the following consultants at a cost not to exceed: a. CDM Smith, Inc. for $550,000, increasing the agreement to $1,400,000; b. GHD, Inc. for$200,000, increasing the agreement to $700,000; C. ArcSine Engineering, Inc. for $200,000, increasing the agreement to $800,000; and d. HDR Engineering, Inc. for $200,000, increasing the agreement to $350,000. 1 QUESTIONS � 1 7