Loading...
HomeMy WebLinkAbout17. Emergency situation update re: urgent reapirs to Aeration Blower No. 2 Page 1 of 2 Item 17. CENTRAL SAN BOARD OF DIRECTORS POSITION PAPER MEETING DATE: AUGUST 18, 2022 SUBJECT: RECEIVE UPDATE OF EMERGENCY SITUATION DECLARED ON AUGUST 4, 2022 AUTHORIZING URGENT REPAIRS TO STEAM DRIVEN AERATION BLOWER NO. 2, IN ACCORDANCE WITH PUBLIC CONTRACT CODE SECTION 22050 SUBMITTED BY: INITIATING DEPARTMENT: STEVE MCDONALD, DIRECTOR OF OPERATIONS-MAINTENANCE OPERATIONS Roger S. Bailey General Manager ISSUE On August 4, 2022, the Board of Directors (Board) authorized to declare an emergency and ratify the General Manager's actions under Public Contract Code 22050 to perform emergency repairs to the Steam Driven Aeration Blower No. 2; and authorized an increase to an existing contract in an amount not to exceed $412,600 with Conhagen Rotating Equipment Specialists (Conhagen), increasing the contract cost ceiling up to $550,000, to perform the required repairs. BACKGROUND The contractor, Conhagen, is making progress to complete the necessary repairs. This includes custom fabrication of a number of turbine components that are no longer commercially available. Fabrication will be followed by installation, and start-up testing services. Completion of the repairs are expected to be substantially complete by October 3, 2022. ALTERNATIVES/CONSIDERATIONS No feasible alternatives. August 18, 2022 Regular Board Meeting Agenda Packet- Page 75 of 76 Page 2 of 2 FINANCIAL IMPACTS The total estimated cost for this repair is $550,000, which includes all engineering, fabrication, installation, and start-up and testing. COMMITTEE RECOMMENDATION This matter was not reviewed by a Board Committee. RECOMMENDED BOARD ACTION Staff recommends the Board confirm by motion that the action proclaimed on August 4, 2022 continues to exist, and that the expenditures to address the emergency repairs to the Steam Driven Aeration Blower No. 2 are continuing as planned. Strategic Plan Tie-In GOAL TWO:Environmental Stewardship Strategy 1 -Achieve compliance in all regulations GOAL FIVE: Safety and Security Strategy 2- Protect personnel and assets from threats and emergencies GOAL SIX:Infrastructure Reliability Strategy 1 - Manage assets optimally August 18, 2022 Regular Board Meeting Agenda Packet- Page 76 of 76