Loading...
HomeMy WebLinkAbout06.a. Receive update on reevaluation of the Lamorinda Recycled Water Project (Shell Pipeline) Page 1 of 7 Item 6.a. CENTRAL SAN June 15, 2022 TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE FROM: MELODY LABELLA, RESOURCE RECOVERY PROGRAM MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE ON REEVALUATION OF THE LAMORI NDA RECYCLED WATER PROJECT (SHELL PIPELINE) At the October 25, 2021 Real Estate, Environmental and Planning Committee meeting, staff updated the Committee that it would be engaging Woodard & Curran (W&C)to conduct a high-level feasibility study reevaluating the viability of the Lamorinda Recycled Water Project, which would potentially use a portion of an abandoned Shell pipeline, acquired by Central San in 1994, for the purpose of distributing recycled water into EBMUD's service area in the cities of Lafayette and Orinda and the Town of Moraga. W&C has completed their evaluation and will be attending the meeting to review the attached presentation, which summarizes their findings. Strategic Plan Tie-In GOAL TWO: Environmental Stewardship Strategy 3—Support regional development of local water supply ATTACHMENTS: 1. Presentation June 15, 2022 REEP Committee Meeting Agenda Packet- Page 31 of 39 Page 2 of 7 F wr ' LAMORINDA RECYCLED WATER SUPPLY EVALUATION SERVICES Y . _ Melody LaBella, P.E. Resource Recovery Program Manager Real Estate, Environmental & Planning Committee Meeting June 15, 2022 1 Lamorinda Recycled Water �- • • • • • Supply Evaluation June 15, 2022 2 1 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 32 of 39 Page 3 of 7 Agenda ► Introductions ► Recycled Water Demands in Lamorinda ► Potential Conceptual Alternatives for Delivering Recycled Water • Expanding Central San recycled water delivery system and reusing abandoned Shell Fuel Product Pipeline (Alternative 1) • Expanding Central San recycled water delivery and utilizing existing Shell Pipeline corridor (Alternative 2) • Using satellite treatment facilities to serve the Lamorinda area (Alternatives 3A/3B/3C) • Using a regional satellite treatment facility at CSO to serve the Lamorinda area (Alternative 4) ► Description of Conceptual Alternatives and Estimated High Level Capital Costs Wooda r&Curran 3 3 Alternative 1 : Lining Shell Pipeline for Recycled Water Use 10-inch Shell Pipeline only has sufficient capacity for Walnut �• Creek demands Average Annual Demand:0.24 MGD •I_ Capital Costs* Distribution Capital Cost 52,000 LF;10-inch Pipeline $26,500,00 Total Capital Cost $26,500,00 i-... Walnm Cmak Annualized Project Cost(30 years,3.5%) $1,441,00 Annual O&M Cost $294,00 Total Annualized Cost $1,735,00 P� Annual Yield(AFY) 27 per AF $6,40 *Notes: 1. The cost of any Central San WWTP treatment upgrades to provide ^ - -.-• - recycled water to the Rossmoor area are not included. 2. The cost to provide recycled water from Central San's treatment plant to the Rossmoor area is not included. 3. The cost of any right of way,easements,or land acquisition was not included. • • PoNnoxCie rc ShNIPPolino y� 9py garuam ErWren H i�^�` 4. Includes costs of retrofit into Rossmoor irrigation system. k /r"�°•°°Ha,°"°""°"•ro f�y.eev.Peir.e CivP Woodard Ching EdrW9 Snell PIpaIIM Curran 4 krYwater u>. �•o ae=r•--+n vn..sr�m - 4 2 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 33 of 39 Page 4 of 7 Alternative 2: Recycled Water �:- System Expansion Along Shell t.... [wrr.,,yHvrr J Pipeline Corridor Average Annual Demand:0.77 MGD Capital Costs* Distribution Capital Cost J'� 44,500 LF;16-inch Pipe 39,000 LF;10-inch Pipe 26,000 LF;8-inch Pipe9,500 LF;6-inch Pipe $167,100,00 Cre k Total Capital Cost $167,100,00 fAnnualized Project Cost(30 years,3.5%) $9,081,00 Annual O&M Cost $1,391,00 °nn°aTotal Annualized Cost $10,472,00 Annual Yield(AFY) 86per AF*Notes: 1. The cost of any Central San WWTP treatment upgrades to provide recycled water to the Lamorinda area are not included. 2. The cost to provide recycled water from Central San's treatment plant to the Lamorinda ` area is not included. 3. Additional booster pumps will be required,not sited or shown. VPrrnen�.es.ai.,uon N t^� 4. The cost of any right of way,easements,or land acquisition was not included. f -" „„,,,,•„ uar,u.e z •�'.° !�f,..Da... Woodard Myclad Vyawr sr�lom /�/„',-,:,,,w.�"— Curran S Expanslen 5 Alternative 3A: Rossmoor Golf f' Course Satellite Treatment Facility Average Annual Demand:0.23 MGD Capital Costs* row Y Treatment,Diversion&Disposal Capital Cost $21,100,00 Distribution Capital Cost $400,00 r - Total Capital Cost $21,500,00 w�inwc Annualized Project Cost(30 years,3.5%) $1,165,00 Annual 0&M Cost $790,00 i�aren„ A—a, Total Annualized Cost $1,955,00 Annual Yield(AFY) 255 u�dn per AF $7,70 O *Notes: 1. Does not include cost of raw wastewater from Central San. °1oag. 2. Includes costs of retrofit into Rossmoor irrigation system. wvoyawww�wwwm ■ rmuoxwl smciwwrs� N y anemarcPea •• E•�rt.�d.dm�. Proposod Satellite WRF %anew now: WCurcan al Anchor Cuslommi; a 6 6 3 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 34 of 39 Page 5 of 7 Alternative 36: Moraga Country Club Satellite Treatment Facility Average Annual Demand:0.16 MGD Capital Costs* Low `- Treatment,Diversion&Disposal Capital Cost $15,700,00 Distribution Capital Cost $1,800,00 y Total Capital Cost $17,500,00 Annualized Project Cost(30 years,3.5%) $950,00 Annual O&M Cost $674,00 Total Annualized Cost $1,624,00 k _ Annual Yield(AFY) 17 '�Y lam'4 per AF $9,30 *Notes: 1. Does not include cost of raw wastewater from Central San. Waw 2. Includes costs of retrofit into Moraga Country Club irrigation system. wooyaev..°w.areae°ea ■ Pwponl sowiwm6N rasmeana -,-e.n+nu rt.nd.dm�.sew. Woodard Proposed SaleRlle WRF MA pom". +'� m urran 7 al Mcdor Cuslomars J 7 Alternative 3C: Orincla Country Club Satellite Treatment Facility Average Annual Demand:0.16 MGD Capital Costs* Treatment,Diversion&Disposal Capital Cost $17,700,00 Distribution Capital Cost $2,300,00 Total Capital Cost $20,000,00 wemdc�su Annualized Project Cost(30 years,3.5%) $1,087,00 Annual 0&M Cost $682,00 Total Annualized Cost $1,769,00 _ Annual Yield(AFY) 17 per AF $10,201 Notes: 1. Does not include cost of raw wastewater from Central San. ""°BW 2. Includes costs of retrofit into Orinda Country Club irrigation system. 3. Potential demand extrapolated from Moraga Country Club. N 1 %�roh+�usws Enws.. ■ rrcNow sewiwwrs y ruemeana •• e.w,e rt.�d.dm�.sew. Proposed szellb WRF %sneM rer:r WCu n al Anchor Cuslomars a S 8 4 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 35 of 39 Page 6 of 7 Alternative 4: Lamorinda Regional Satellite Treatment Facility •��� Average Annual Demand: 0.77 MGD Capital Costs* Low waaatC.ek Treatment,Diversion&Disposal Capital Cost $57,000,00 on0na Distribution Capital Cost $155,000,00 ° afayahu Total Capital Cost $212,000,00 abF Annualized Project Cost(30 years,3.5%) $11,503,00 Annual O&M Cost $3,493,00 " ...„ Total Annualized Cost $14,996,00 [ A r• Annual Yield(AFY) 86 �^^ per AF $17,40 Lwraga *Notes: 1. Additional booster pumps will be required,not sited or shown. 2. The cost of any right of way,easements,or land acquisition was not included. larwrigaaaryrlq Ynwr :•�+•mow• ����^••'^� s.00M�••Pw.ew�a.. •�,••,•a�• N Lam All•& lvfial N m.w, �CMnan 9 SiLohWWW RegRagG 1gRF 9 Figure 5-1:Non-Potable Reuse ANemati m Canpadsan E B M U D 2019 56.000 Mora9alrea RW Master Plan Projects S5'000 • —$3,000/AF unit price cutoff S4'0DO DCC DERWA/San P.- 1. 4,300 AFY RARE&N.Richmond ExpansionPh-4q 69,000 — 2. 4,100 AFY Phillips 66 Refinery East Balshore PnaWe 3. 2,900 AFY East Bayshore Expansion _ Easl Bars Phasel S2000 CC Cam fe Fast Bayshore Phase IA 4. 1,400 AFY DERWA/San Ramon Valley Ph.3-5 DERWRamon Ph— _ Phase3 C.*WSan Regional DERWAIBan Ramon Phases f0 5o 55 60 65 70 75 80 65 90 95 N---t&ore •DERNA15an R—n Phase9 •DERNArwo R—nRhase5 -DERNArmn Ranon Fhw 4 •Eml6aysh-Phage IA .FastEaysh-Phasel6 EastBeyshomPl— •ChesnaNRchmorA •P66 Rader Refinery %Central San Regwal xCC Pgeine In Cane)ROW •DBC SWRI.MW •MCC SaIdA.Pi*d Mm3ja Asea SaWil9 PMOO — 'blaFp DERWNSan Ramon VA"R OW Wow Nr wPhom.witty shaven are bmW on DWW9 sears I—Pul. - avereye 08M arb arerega energym n-r8wo RWfP.A-Esse Bsy*h RWF,o=DERWAr—Remora,o=Refnery.,=000SD am CC PON in Ceoal RDW. Source:EBMUD Updated Recycled Water Master Plan,2019 1?$Woodard Curran 10 10 5 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 36 of 39 Page 7 of 7 QUESTIONS & DISCUSSION CENTRALSAN 11 6 June 15, 2022 REEP Committee Meeting Agenda Packet- Page 37 of 39