At the October 25, 2021 Real Estate, Environmental and Planning Committee meeting, staff updated the
Committee that it would be engaging Woodard & Curran (W&C)to conduct a high-level feasibility study
reevaluating the viability of the Lamorinda Recycled Water Project, which would potentially use a portion of
an abandoned Shell pipeline, acquired by Central San in 1994, for the purpose of distributing recycled
water into EBMUD's service area in the cities of Lafayette and Orinda and the Town of Moraga. W&C has
completed their evaluation and will be attending the meeting to review the attached presentation, which
summarizes their findings.
Strategic Plan Tie-In
GOAL TWO: Environmental Stewardship
Strategy 3—Support regional development of local water supply
ATTACHMENTS:
1. Presentation
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 31 of 39
Page 2 of 7
F
wr
' LAMORINDA RECYCLED WATER
SUPPLY EVALUATION SERVICES
Y . _ Melody LaBella, P.E.
Resource Recovery Program Manager
Real Estate, Environmental & Planning Committee Meeting
June 15, 2022
1
Lamorinda Recycled Water �- • • • • •
Supply Evaluation
June 15, 2022
2
1
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 32 of 39
Page 3 of 7
Agenda
► Introductions
► Recycled Water Demands in Lamorinda
► Potential Conceptual Alternatives for Delivering Recycled Water
• Expanding Central San recycled water delivery system and reusing abandoned Shell Fuel
Product Pipeline (Alternative 1)
• Expanding Central San recycled water delivery and utilizing existing Shell Pipeline corridor
(Alternative 2)
• Using satellite treatment facilities to serve the Lamorinda area (Alternatives 3A/3B/3C)
• Using a regional satellite treatment facility at CSO to serve the Lamorinda area
(Alternative 4)
► Description of Conceptual Alternatives and Estimated High Level Capital Costs
Wooda r&Curran
3
3
Alternative 1 : Lining Shell Pipeline
for Recycled Water Use
10-inch Shell Pipeline only has sufficient capacity for Walnut �•
Creek demands
Average Annual Demand:0.24 MGD
•I_
Capital Costs*
Distribution Capital Cost
52,000 LF;10-inch Pipeline $26,500,00
Total Capital Cost $26,500,00 i-... Walnm Cmak
Annualized Project Cost(30 years,3.5%) $1,441,00
Annual O&M Cost $294,00
Total Annualized Cost $1,735,00 P�
Annual Yield(AFY) 27
per AF $6,40
*Notes:
1. The cost of any Central San WWTP treatment upgrades to provide ^ - -.-• -
recycled water to the Rossmoor area are not included.
2. The cost to provide recycled water from Central San's treatment plant to
the Rossmoor area is not included.
3. The cost of any right of way,easements,or land acquisition was not
included. • • PoNnoxCie rc ShNIPPolino y�
9py garuam ErWren H i�^�`
4. Includes costs of retrofit into Rossmoor irrigation system. k /r"�°•°°Ha,°"°""°"•ro
f�y.eev.Peir.e CivP Woodard
Ching EdrW9 Snell PIpaIIM Curran 4
krYwater u>. �•o ae=r•--+n vn..sr�m -
4
2
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 33 of 39
Page 4 of 7
Alternative 2: Recycled Water �:-
System Expansion Along Shell t....
[wrr.,,yHvrr J
Pipeline Corridor
Average Annual Demand:0.77 MGD
Capital Costs*
Distribution Capital Cost J'�
44,500 LF;16-inch Pipe
39,000 LF;10-inch Pipe
26,000 LF;8-inch Pipe9,500 LF;6-inch Pipe $167,100,00 Cre k
Total Capital Cost $167,100,00 fAnnualized Project Cost(30 years,3.5%) $9,081,00 Annual O&M Cost $1,391,00 °nn°aTotal Annualized Cost $10,472,00 Annual Yield(AFY) 86per AF*Notes:
1. The cost of any Central San WWTP treatment upgrades to provide recycled water to the
Lamorinda area are not included.
2. The cost to provide recycled water from Central San's treatment plant to the Lamorinda `
area is not included.
3. Additional booster pumps will be required,not sited or shown.
VPrrnen�.es.ai.,uon N t^�
4. The cost of any right of way,easements,or land acquisition was not included. f -" „„,,,,•„
uar,u.e z •�'.° !�f,..Da... Woodard
Myclad Vyawr sr�lom /�/„',-,:,,,w.�"— Curran S
Expanslen
5
Alternative 3A: Rossmoor Golf f'
Course Satellite Treatment Facility
Average Annual Demand:0.23 MGD
Capital Costs* row Y
Treatment,Diversion&Disposal Capital Cost $21,100,00
Distribution Capital Cost $400,00 r -
Total Capital Cost $21,500,00 w�inwc
Annualized Project Cost(30 years,3.5%) $1,165,00
Annual 0&M Cost $790,00 i�aren„
A—a,
Total Annualized Cost $1,955,00
Annual Yield(AFY) 255 u�dn
per AF $7,70 O
*Notes:
1. Does not include cost of raw wastewater from Central San. °1oag.
2. Includes costs of retrofit into Rossmoor irrigation system.
wvoyawww�wwwm ■ rmuoxwl smciwwrs� N
y anemarcPea •• E•�rt.�d.dm�.
Proposod Satellite WRF %anew now: WCurcan
al Anchor Cuslommi; a 6
6
3
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 34 of 39
Page 5 of 7
Alternative 36: Moraga Country
Club Satellite Treatment Facility
Average Annual Demand:0.16 MGD
Capital Costs* Low `-
Treatment,Diversion&Disposal Capital Cost $15,700,00
Distribution Capital Cost $1,800,00 y
Total Capital Cost $17,500,00
Annualized Project Cost(30 years,3.5%) $950,00
Annual O&M Cost $674,00
Total Annualized Cost $1,624,00 k _
Annual Yield(AFY) 17 '�Y lam'4
per AF $9,30
*Notes:
1. Does not include cost of raw wastewater from Central San. Waw
2. Includes costs of retrofit into Moraga Country Club irrigation system.
wooyaev..°w.areae°ea ■ Pwponl sowiwm6N
rasmeana -,-e.n+nu rt.nd.dm�.sew. Woodard
Proposed SaleRlle WRF MA pom". +'� m urran 7
al Mcdor Cuslomars J
7
Alternative 3C: Orincla Country
Club Satellite Treatment Facility
Average Annual Demand:0.16 MGD
Capital Costs*
Treatment,Diversion&Disposal Capital Cost $17,700,00
Distribution Capital Cost $2,300,00
Total Capital Cost $20,000,00 wemdc�su
Annualized Project Cost(30 years,3.5%) $1,087,00
Annual 0&M Cost $682,00
Total Annualized Cost $1,769,00 _
Annual Yield(AFY) 17
per AF $10,201
Notes:
1. Does not include cost of raw wastewater from Central San. ""°BW
2. Includes costs of retrofit into Orinda Country Club irrigation system.
3. Potential demand extrapolated from Moraga Country Club.
N 1
%�roh+�usws Enws.. ■ rrcNow sewiwwrs
y ruemeana •• e.w,e rt.�d.dm�.sew.
Proposed szellb WRF %sneM rer:r WCu n
al Anchor Cuslomars a S
8
4
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 35 of 39
Page 6 of 7
Alternative 4: Lamorinda Regional
Satellite Treatment Facility •���
Average Annual Demand: 0.77 MGD
Capital Costs* Low waaatC.ek
Treatment,Diversion&Disposal Capital Cost $57,000,00 on0na
Distribution Capital Cost $155,000,00 ° afayahu
Total Capital Cost $212,000,00 abF
Annualized Project Cost(30 years,3.5%) $11,503,00
Annual O&M Cost $3,493,00 " ...„
Total Annualized Cost $14,996,00 [ A r•
Annual Yield(AFY) 86 �^^
per AF $17,40 Lwraga
*Notes:
1. Additional booster pumps will be required,not sited or shown.
2. The cost of any right of way,easements,or land acquisition was not
included.
larwrigaaaryrlq Ynwr :•�+•mow• ����^••'^�
s.00M�••Pw.ew�a.. •�,••,•a�• N
Lam All•& lvfial N
m.w, �CMnan 9
SiLohWWW RegRagG 1gRF
9
Figure 5-1:Non-Potable Reuse ANemati m Canpadsan
E B M U D 2019 56.000
Mora9alrea
RW Master Plan Projects S5'000
• —$3,000/AF unit price cutoff S4'0DO DCC DERWA/San P.-
1. 4,300 AFY RARE&N.Richmond ExpansionPh-4q 69,000 —
2. 4,100 AFY Phillips 66 Refinery East Balshore PnaWe
3. 2,900 AFY East Bayshore Expansion _ Easl Bars Phasel
S2000 CC Cam fe Fast Bayshore Phase IA
4. 1,400 AFY DERWA/San Ramon Valley Ph.3-5
DERWRamon
Ph—
_ Phase3
C.*WSan Regional DERWAIBan Ramon
Phases
f0
5o 55 60 65 70 75 80 65 90 95
N---t&ore
•DERNA15an R—n Phase9 •DERNArwo R—nRhase5 -DERNArmn Ranon Fhw 4
•Eml6aysh-Phage IA .FastEaysh-Phasel6 EastBeyshomPl—
•ChesnaNRchmorA •P66 Rader Refinery %Central San Regwal
xCC Pgeine In Cane)ROW •DBC SWRI.MW •MCC SaIdA.Pi*d
Mm3ja Asea SaWil9 PMOO
— 'blaFp DERWNSan Ramon VA"R OW Wow Nr wPhom.witty shaven are bmW on DWW9 sears I—Pul.
- avereye 08M arb arerega energym
n-r8wo RWfP.A-Esse Bsy*h RWF,o=DERWAr—Remora,o=Refnery.,=000SD am CC PON in Ceoal RDW.
Source:EBMUD Updated Recycled Water Master Plan,2019 1?$Woodard Curran
10
10
5
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 36 of 39
Page 7 of 7
QUESTIONS & DISCUSSION
CENTRALSAN
11
6
June 15, 2022 REEP Committee Meeting Agenda Packet- Page 37 of 39