HomeMy WebLinkAbout04.a. RECEIVE OVERVIEW AND HOLD DISCUSSION REGARDING ENVISION: SUSTAINABILITY AND RESILIENCY INITIATIVE Page 1 of 9
Item 4.a.
CENTRAL SAN
April 22, 2022
TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE
FROM: JUSTIN WAPLES, ASSOCIATE ENGINEER
REVIEWED BY: DAN FROST, SENIOR ENGINEER
DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERINGAND TECHNICAL
SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE OVERVIEW AND HOLD DISCUSSION REGARDING ENVISION:
SLISTAINABILITYAND RESILIENCYINITIATIVE
Planning and Applied Research staff will be providing the attached presentation on Envision, a
sustainability and resiliency framework for enhancing Central San's evolving strategic emphasis on these
initiatives. The Envision framework for sustainability and resiliency has become a benchmark in the civil
infrastructure industry and was founded by the American Society of Civil Engineers, American Public
Works Association and American Council of Engineering Companies.
Strategic Plan Tie-In
GOAL ONE: Customer and Community
Strategy 1—Deliver high-quality customer service, Strategy 2—Maintain a positive reputation
GOAL TWO: Environmental Stewardship
Strategy 1—Achieve 100% compliance in all regulations, Strategy 2—Anticipate and prepare for potential regulatory
changes, Strategy 3—Support regional development of local water supply, Strategy 4- Reduce reliance on non-
renewable energy
GOAL THREE: Fiscal Responsibility
Strategy 1—Maintain financial stability and sustainability, Strategy 2—Ensure integrity and transparency in financial
management
GOAL FOUR: Workforce Development
Strategy 3- Meet or exceed industry safety standards
GOAL FIVE:Infrastructure Reliability
Strategy 1—Manage assets optimally to prolong their useful life, Strategy 3—Protect personnel and assets from
threats and emergencies
April 22, 2022 Special REEP Committee Meeting Agenda Packet- Page 4 of 39
Page 2 of 9
GOAL SIX: Innovation and Optimization
Strategy 1—Implement the Central San Smart Initiative
GOAL SEVEN:Agility andAdaptability
Strategy 2—Plan ahead for scenarios of direct adverse impacts
ATTACHMENTS:
1. Presentation
April 22, 2022 Special REEP Committee Meeting Agenda Packet- Page 5 of 39
Item 4.a.
(Updated
Presentation)
ENVISION :
SUSTAINABILITY AND RESILIENCY INITIATIVE
_ Justin Waples, P.E., M. ASCE, ENV SP
Associate Engineer
Real Estate, Environmental, and Planning Committee
April 22, 2022
1
WATER ENVIRONMENT & TECHNOLOGY 5eprcm.ee1Cv
RUiLOiNC WATER
OPERATIONS & ENGINEERING INFRASTRUCTURE
FOR TOMORROW
yJ®iw
k
ProgrammingYour
Utility for Sustainable
Performance
_ 2
he Envision framework heeames the standard top forward-thinking water wUhies
2
1
Envision is a Joint Collaboration
IOFNASS PROGRAM
Institute for FOR SUSTAINABLE INFRASTRUCTURE
5usta i na b let��Graduate Schaal.of Design
r■� Infrastructure C Harvard University
ISI Founding Organizations
- -ASCE
...AC�EC....
■ American Society of Civil Engineers
Yvw CvwAreAenslve Puhlic Wvlks Resvunc
Institute for Sustainable Infrastructure=IS! ' 3
rNINT-7.11T.ML
3
Water Sector Envision Projects
Redding
uza Es a. � °GSM ATCIi F.vV:.r,
keno NEVA❑
a
u1NTAA IO pli=R=C
- - - -- Sento
_f.
"5 a NORTi-I la~ \•
I N;TON MONTR.NA DAKOTA San F iSCfl
Ortawa S
San Jose
DAKOTA ❑
U r:F,',"H InAH6
W YU IytiNC ry�Ji Fresno
Q
CI .9,
o
NERRnsu: CALIFORNIA
NFd^r'n U Fted StateSip Naw York
I '
i' ��! Bakersfield
;;'tl F oLas Vegas ul. n �
KMr.
Loles ARIZONA
NEW ME%IS:O
San Oiegoo _ '
Lo s
0
Houston 19 1
�� -• ��uat o San Diego
Mexico%y m—'. Mlami 9-
4
2
CALIFORNIAOR ADOPTING ENVISION
avis
San Francisco
V
WaterPowersewei EBMUD
SAWPA
_ - OvwljR]
• •' y �LIFUB�
Over 11 agencies are using Envision
��=CD
CFNTRAI SAN
p Quality Wellbeing • Mobility•Community
u�l of Life
Leadership Collaboration
p Planning • Economy
Resource
Materials• Energy•Water
Allocation
Natural
C� Siting• Conservation • Ecology
Currently developing theWorld
Y
FY22-24 Strategic Plan
=; ® Climate &
' Emissions • Resilience
Resilience
CF SAN
EFFECTIVE UTILITY MANAGEMENT - 10 KEY ATTRIBUTES
I:. ;; : ;
QUALITY OF RESOEUM URCE
•utm LIFE LEADERSHIP ALLOCATIONWORLD
1.Product Quality 0 0 0
2.Customer Satisfaction 0 0 0
3.Employee and Leadership Development 0
4.Operational Optimization 0 0 0 0
5.Financial Viability 0 0 0
6. Infrastructure Strategy and Performance 0 0 0 0
7.Enterprise Resiliency 0 0 0
8.Water Resource Sustainability 0 0 0 0 0
9.Community Sustainability 0 0 0 0 0
10.Stakeholder Understanding and Support 0 0 0 '
7
CENTRAL SAN PROJECTS
ENVISIONPre-screened for Envision awards
PLATINUM GOLD
• Aeration Basins Diffuser Replacement and Seismic
Diffuser/ Upgrades, District Project(DP) 100019
Aeration
• Pleasant Hill-Grayson Creek Trunk Sewer, DP 8412
• Pump Station Upgrades, Phase 2, DP 8457
• Headworks Screening Upgrade, DP 7327
ENVISION
9 1
SILVER VERIFIED
Pleasant Hill- Pump Station
Grayson Creek Upgrades
Trunk Sewer
I $
CFNTPAI SAN
8
4
Organizational
40+Water/Wastewater New York New Jersey Port
Agencies Authority
Los Angeles County
Los Angeles World Airports
Central San
•
s
9
CONSIDER SUSTAINABILITY INTEGRATION
Organizational Level
Strategic Plan • . •
Sustainability Review
Master Planning
Standard Specifications Envision candidates
Policies _
Standard Scope
Process
Processes Templates
10
10 77
5
ISI
Welcomes ,
Envision Supported Agency,
Central San would be joining a strong group
of leading agencies around the world
working to improve sustainability,
• equity
Anthony Kane
President&CEO
Institute for
NEXT STEPS: MENU OF OPPORTUNITIES
Commencement
Sustainable
��� Infrastructure
11
Introduce Envision Concept to REEP and BOARD Spring 2022
Pilot Envision Verification — Diffuser Capital Project Spring 2022
Envision Executive Team Engagement/Orientation Summer 2022
Explore Non-Binding Resolution/Board Meetings Summer 2022
Pilot Sustainability Enhancement Workshops w/ Capital Fall 2022
Projects (# of projects to be determined)
Envision Verification — Solids Handling Capital Project Spring 2023
Staff Envision Training Spring 2023
Guidebook, Procurement, Specifications Enhancements Fall 2023
,2
12
6
POSSIBLE KEY PERFORMANCE METRICS
MW MMW I
Envision Verified Projects Completed 1 per 3 years
ENV SP Staff Qualifications Gained 1 per year
Sustainability Enhancement Evaluations
3 projects per year
Completed
Non-Binding Envision Resolution Adopted FY 2022-23
Guidebook & Specifications Published FY 2023-24
r ,3
CENTRAL SAN
13
QUESTIONS / DISCUSSION
Lk q
,
CFNTPAISAN
14
7
ADDITIONAL SLIDES
' 15
15
DdWen HeSOWOr S Pleasant HEI Pump
Aeration T.Itse. .talions Improved
M1.1 Impmse[ammuniry QualYtyWLik Ynprped Imprpued 5upedor Enhanced
D11.2 Enhance Pubk Health&saky
Superor
OLS.3 Impmse Cons eacaon 5aky Enhanced Enhanced Enhanced EnhenCed
DLLA MN."Nose&Vibralon N@ N/A N/A Improted
DL15 MNmIM Light Poiladon N/A N/A enpmued
1.1 QUA Mnlmlla CPmtructlunlmpacts knprmed
MobilM aL 2.1 Mlprose CatlmuNy kAabggr Hccess N/A KA t. N@
DL2.2 Encourage SusDlrubk TNr6ppGtlOn N@ N@ N@ N@
DL2.3 m"Access&wwAndlrrg N@ N@ N@
gLi.l Advance Equity&S-W.Iustke N@
D1.3.2 P1e5eM HISWC&Culetml Ness N@ N@ Enhenoed
DL3.3 Enharre Mews&L—IChaackr N@ N@ N@ N@
OL3.4 Enhance Publkspace&Amrdbes N@ N@ N@
Leader5hlp gallon MIA Proside Elkceve LeadersNp&C—Ittent Imported
LD1.2 F—,Cdlaberaaun&Teamwork
1.01.3 Protide br5bkeholderinyoMmerd
LD1A PanuegypmdutSynergles
Planning LD2.1 Establish Sustairrabilrty Nbnagemem Ptan
LD2.2 Plan br 5ustainabk cPmmumaes Imported
1.02.3 PlanbrLorrg-Tenn Nbnlbnng&Neln@narice
LD2A plan WEn6aELlk rE�
ECm10myI.M.1 St-4.a E.—.Prospety&Devebpmem 5u — Supeda
LD3.2 DMIopl.—I51,111s&[apabllores
LD3.3 Conducts Lde-G)ok Economk Ewlaseon '
AC 16
CFNTPAISAN
16
8
Olffuser/ Headwnrks Pleasant Hill Pump
Aeration Trunk Sewer Stations Improved
R M.1 S uppon S us to Ina bee P mcurcm a At Practices Enhanced
R A1.2 Use Recycled hlardddU SUpedor
Matercrls RA3.3 Reduce OpewbOn.1We,% Imp..ed N/A NIA Superior
R At,' Reduce C onsbviceon Was! Improved
R A1.5 Ba la nre Eadh—dr On Site NfA
ll 2.1 Reduce Ope radon.l E nergy C onsum ptian Superior NIA
R A2.2 Reduce C onsbucbon EnergyC ons umphon Enhanced
EnBr9Y
ReSVulCe RA2.3 Use Renewable Energy NIA
All—tum RA24 Commission&Wnior Euergy Sys1— Superior Enhanced N/A Enhanced
R".1 ouncesI I
R A3.2 Reduce Operational W—C ons umptian N/A Improved N/A
Wafer
RA3.3 Reduce Cons—flon WaterConsomption Improvetl
R A3.A Mb n.t Water S yEW supener
NW1.I Preserve Sides of Hlgh Ecological Value N/A N/A N/A
NW1.2 PmNde Welland&5uncce Water Buffers N/A N/A N/A
Siting
NWl.3 Preserve Prime Farmknd N/A N/4 N/A N/A
NWIA Preserve Undeveloped land
NW2.1 Reclaim BmwnRelds N/A N/A
1 —2.2 hbnege SOormwaler
(bnservabon
NW2.3 Reduce Pesticide BFemlNerlmpacE NIA N/A N/A NIA
N.I.ral NW2A pmhct S ud ce&Groundwater Qualfly ImprovedWERM Enhanced Enhanced
World NW3.1 Enhance Funclbnal Hab4b6 N/A N/A Imymved NfA
NW3.2 Enhance Welland&SuAace Wa@r Functions N/A N/A Enhanced
Ecology NW3.3 ko,hain Floodplain Funcjo,s
NW3.4 Corl"I lavasive 5 peCies N/A N/A N/A NIA
NW3.5 Prot�CtSoll Heahh N/A N/A ' 17
013MMMY,M,
17
OiK-1 Headworks Pleasant FNl Pump
AeraBon TlunkSewer Stations Improved
Climate dlld mis— CA1-1Reduce Ner E mhodied C.— Enhanced
Re51I.h— CRL] R educe Greenhome Gas Hon, Enhanced N(A
Superior
CR 1.3 Reduce Alr Politant E mlssbm Impmsetl NIA
�r�1
Resilience CR 2.1 Avid Umul<abk OeelWeerd NIA NIA � supeda
CR 2.2 Assess C timate Charge Vul—bluy Enharcetl Enhanced Enhanced Enhanced
CR2.3 Ewlual R isk and R esillence Superior
CR2.A ESwdish Resilience Goals and Sdategies Enhanced Enhanced Erha.ed
CR2.5 IWdmlte ReAllence unpinned Impmsed
CR2.15 ImpA luhdsyutltt kregmon S.P do Enhancedit Supedan
M— )
�8
CFNTPAISAN
18
9