Loading...
HomeMy WebLinkAbout10. Authorize a Property Purchase Agreement and approve a property exchange with Martinez Refining Co., LLC for the Fairview Pump Station in Martinez Page 1 of 9 Item 10. CENTRAL SAN BOARD OF DIRECTORS POSITION PAPER MEETING DATE: MARCH 3, 2022 SUBJECT: AUTHORIZE A PROPERTY PURCHASE AGREEMENT AND ADOPT RESOLUTION NOS. 2022-016 TO 2022-018 TO: 1)ACCEPT A GRANT DEED AND A GRANT OF ACCESS EASEMENT FROM MARTINEZ REFINING COMPANY LLC, OWNER OF THE PROPERTY LOCATED AT 2000 MARINA VISTA IN MARTINEZ, AND 2)AUTHORIZE EXECUTION OFA GRANT DEED TO MARTINEZ REFINING COMPANY LLC; AND AUTHORIZE STAFF TO RECORD SAI D DOCUMENTS WITH THE CONTRA COSTA COUNTY RECORDER (DISTRICT PROJECT 8457, PARCELS 1, 2 AND A) SUBMITTED BY: INITIATING DEPARTMENT: DAVID KRAMER, SENIOR RIGHT OF WAY ENGINEERING AND TECHNICAL SERVICES - AGENT PDS - DEVELOPMENT SERVICES - RIGHT OF WAY REVIEWED BY: DANA LAWSON, SENIOR ENGINEER DANEA GEMMELL, PLANNING & DEVELOPMENT SERVICES DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING & TECHNICAL SERVICES Roger S. Bailey Kenton L. Alm General Manager District Counsel ISSUE Authorization from the Board of Directors (Board) is required to execute a property purchase agreement; and a resolution of the Board is required to accept Grant Deeds and Grant of Easements; and a resolution of the Board is required to execute Grant Deeds and to record the documents. March 3, 2022 Regular Board Meeting Agenda Packet- Page 71 of 165 Page 2 of 9 BACKGROUND Capital Projects contracted with a design consultant to renovate the Fairview Pump Station as it has reached the end of its useful life and needs to be replaced with a new pump station. To construct the new pump station, additional property rights are required from the adjacent property owner Martinez Refining Company LLC (MRC). These property rights include a 9,370 square foot Fee Parcel acquisition and a 5,435 square foot Access Easement acquisition from MRC. MRC currently accesses their property through a license agreement with Central San and wishes to upgrade its property rights to a 5,435 square foot fee ownership of the licensed area. To accommodate the needs of both parties, an exchange of property rights between Central San and MRC is being proposed. ALTERNATIVES/CONSIDERATIONS The Board could decline to exchange property with MRC. This alternative is not recommended since Central San would not have the land rights necessary to construct the improvements to the Fairview Pump Station. FINANCIAL IMPACTS None. This would be a like-for-like exchange of property rights with no monetary funds involved. COMMITTEE RECOMMENDATION The Real Estate, Environmental and Planning Committee reviewed this matter at its meeting on February 23, 2022 and recommended approval. RECOMMENDED BOARD ACTION Staff recommends the following Board actions: 1. Authorize the Board President to execute the property purchase agreement; 2. Adopt the two proposed resolutions accepting the executed Grant Deed and Grant of Easement and authorizing staff to record the documents with the Contra Costa County Recorder; and 3. Adopt the proposed resolution authorizing the Board President to execute a Grant Deed to MRC and authorizing staff to record the document with the Contra Costa County Recorder. Strategic Plan re-In GOAL ONE: Customer and Community Strategy 2—Maintain a positive reputation GOAL FIVE: Infrastructure Reliability Strategy 2—Execute long-term capital renewal and replacement program March 3, 2022 Regular Board Meeting Agenda Packet- Page 72 of 165 Page 3 of 9 ATTACHMENTS: 1. Map Parcel 1 2. Map Parcel 2 3. Map Parcel A 4. Proposed Resolution - Grant Deed to MRC 5. Proposed Resolution - Grant Deed from MRC 6. Proposed Resolution - Grant of Easement from MRC March 3, 2022 Regular Board Meeting Agenda Packet- Page 73 of 165 ATTAdNkfif 1 CENTRAL CONTRA COSTA SANITARY DISTRICT Q MARTINEZ REFINING s 2 COMPANY LLC —Z 2020-0081226 SCALE: 1 " = 40' I � v A=0'09'1 4" PARCELA , egg POC L=13.51 FEE FROM CCCSD TO MRC, /��7 CAL TRANS 5,435 SF (0.12 ACRES) 997�7 Uuu 4 UTILITY EASEMENT \ 2000-291704 N, 00.51 '00" E 78.00 �� \ N '33"00°38W (R) Ln R) �cp h`v 2 \ PORTION OF REMAINING 0' POB C4�� �� \ EASEMENT FOR CCCSD 0-) �� �� / �� o �� PER 9621 OR 788, Jo J CCCSD 5757 OR 93 �� 6� \ 2,637 SF (0.06 ACRES) s }----- N LC) �� 9 ry X40 (.0o COf/ 1oo o� t C14C14 41 Az � J 3 � 40 o`� QJ� MARTINEZ REFINING COMPANY LLC < / Q O`,C1i ^q� 2020-0081226 L2 (R) Q- ' r ✓ k ^O J J h' `,� LINE TABLE LINE BEARING DISTANCE h h L1 S 60°50'15" E 63.07 o ^ L2 S 00°16'31 " E 33.00 0o dho L3 S 69°50'05" W 79.11 g I Q W 10N0 (0o w F- °°"' NOTES Ln-M 1. BASIS OF BEARINGS: 72 LSM 37, CCCR z > LL � o `i' a _j ou 2. ALL DISTANCES ARE GRID DISTANCES. Q o4 MULTIPLY DISTANCES SHOWN BY Q ~ 1 .00006140 TO OBTAIN GROUND Z DISTANCES o I o Q LEGEND Q — — — — PARCEL LINE TO BE REMOVED S 01°30'07' E (R) NEW PARCEL LINE ------- - - - EXISTING PARCEL LINE E' EXISTING EASEMENT LINE HISTORIC PARCEL LINE DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: GSTJ GSTJ 8B7 8457 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" = 40' 1/18/22 378-061-017 1 March 3, 2022 Regular Board Meeting Agenda Packet- Page 74 of 165 ATTA&Mbif 2 Q MARTINEZ REFINING COMPANY LLC 2020-0081226 Q / '' SCALE: 1 " = 40' I v A=0'09'14" PARCEL 2 ggg POC L=13.51 ACCESS EASEMENT FROM MRC TO CAL TRANS UTILITY EASEMENT CCCSD, 5,435 SF (0.12 ACRES) \ 2000-291704 N 00°51 '00" E 78.00 �� \ IN 00'3833 W (R) LnLQ s POB \ PORTION OF REMAINING 1-1 o \ EASEMENT FOR CCCSD o yg gofi OF � O PER 9621 OR 788, Joh J CCCSD 5757 OR 9 ,3 0.1 \ 2,637 SF (0.06 ACRES) o �h/ 9\s -D Ln II Ov h/ �o `°�`� N 3 o Lob`i' MARTINEZ REFINING COMPANY L L C °� �� �cb 2020-0081226 3; I 0) � ry LINE TABLE 4 LINE BEARING DISTANCE trj 40 L1 S 60°50'15" E 63.07 L2 S 00'16'31 " E 33.00 �/ah L3 S 69°50'05" W 79.11 s I Q I W CA X00 I— (0NOTES �°'M 1. BASIS OF BEARINGS: 72 LSM 37, CCCR z > o `� u n 2. ALL DISTANCES ARE GRID DISTANCES. N Q MULTIPLY DISTANCES SHOWN BY co I 1 .00006140 TO OBTAIN GROUND ZtoI / DISTANCES LEGEND Oct — — — — PARCEL LINE TO BE REMOVED S 01'30'07" E (R) - NEW PARCEL LINE --- --- — — EXISTING PARCEL LINE EXISTING EASEMENT LINE HISTORIC PARCEL LINE o , a DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: GSTJ GSTJ 8B7 8457 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" =40' 1/18/22 378-061-017 2 March 3, 2022 Regular Board Meeting Agenda Packet- Page 75 of 165 ATTAC H M M V Q MARTINEZ REFINING COMPANY LLC —Z 2020-0081226 SCALE: 1 " = 40' I v A=0°09'14" PARCEL A g�gg POC L=13.51 FEE FROM CCCSD TO MRC CAL TRANS 5,435 SF (0.12 ACRES) UTILITY EASEMENT \ 2000-291704 N 00°51 '00" E 78.00 �� \ IN 00°3833 W (R) Ln 2 POB \ PORTION OF REMAINING ;-Q- 0,� EASEMENT FOR CCCSD ygL�� �� - �� PER 9621 OR 788, Joh J CCCSD 5757 OR 93 � \ 2,637 SF (0.06 ACRES) o Ln II Ov h/ �o 00 N 3 o Lob`i' MARTINEZ REFINING COMPANY L L C 4 R Q p� �� �cb 2020-0081226 3; I 4"'0) � ry LINE TABLE 4 LINE BEARING DISTANCE trj 40 L1 S 60°50'15" E 63.07 o/o L2 S 00°16'31 " E 33.00 L3 S 69°50'05" W 79.11 s I Q I W CV X00 I— (0NOTES �°'M 1. BASIS OF BEARINGS: 72 LSM 37, CCCR z > o `� u n 2. ALL DISTANCES ARE GRID DISTANCES. N Q MULTIPLY DISTANCES SHOWN BY co I 1 .00006140 TO OBTAIN GROUND ZtoI / DISTANCES LEGEND Q — — — — PARCEL LINE TO BE REMOVED S 01°30'07" E (R) - NEW PARCEL LINE --- --- - - EXISTING PARCEL LINE EXISTING EASEMENT LINE HISTORIC PARCEL LINE o , a DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: GSTJ GSTJ 8B7 8457 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" =40' 1/18/22 378-061-017 A March 3, 2022 Regular Board Meeting Agenda Packet- Page 76 of 165 Page 7 of 9 ATTACHMENT 4 RESOLUTION NO. 2022-016 A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT AUTHORIZING EXECUTION AND RECORDING OF A GRANT DEED TO MARTINEZ REFINING COMPANY LLC, PUMP STATION UPGRADES PROJECT, PHASE 2 PARCEL NO. A, MARTINEZ APN NO. 378-061-017 NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Central Contra Costa Sanitary District (Central San) as follows: THAT the Central San hereby consents to the execution of a "GRANT DEED" to Martinez Refining Company LLC Job No. 8457, dated , 2022; and THAT the President of the Board of Directors and the Secretary of the District are hereby authorized to execute said document for and on behalf of the District; and THAT staff is authorized to record said document in the Office of the Recorder of Contra Costa County. PASSED AND ADOPTED this 3rd day of March 2022 by the Board of Directors of Central San by the following vote: AYES: Members: NOES: Members: ABSENT: Members: David R. Williams President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Katie Young Secretary of the District Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm, Esq. Counsel for the District March 3, 2022 Regular Board Meeting Agenda Packet- Page 77 of 165 Page 8 of 9 ATTACHMENT 5 RESOLUTION NO. 2022-017 A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT ACCEPTING A GRANT OF DEED FROM MARTINEZ REFINING COMPANY LLC, PUMP STATION UPGRADES, PHASE 2 PARCEL NO. 1, MARTINEZ APN NO. 378-061-017 NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Central Contra Costa Sanitary District (Central San) as follows: THAT Central San hereby accepts a Grant of Access Easement from Martinez Refining Company LLC, District Project Pump Station Upgrades, Phase 2, Parcel No. 1, Martinez, dated 2022; and THAT staff is authorized to record said document in the Office of the Recorder of Contra Costa County. PASSED AND ADOPTED this 3rd day of March 2022 by the Board of Directors of Central San by the following vote: AYES: Members: NOES: Members: ABSENT: Members: David R. Williams President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Katie Young Secretary of the District Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm, Esq. Counsel for the District March 3, 2022 Regular Board Meeting Agenda Packet- Page 78 of 165 Page 9 of 9 ATTACHMENT 6 RESOLUTION NO. 2022-018 A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT ACCEPTING A GRANT OF ACCESS EASEMENT FROM MARTINEZ REFINING COMPANY LLC, PUMP STATION UPGRADES, PHASE 2 PARCEL NO. 2, MARTINEZ APN NO. 378-061-017 NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Central Contra Costa Sanitary District (Central San) as follows: THAT Central San hereby accepts a Grant of Access Easement from Martinez Refinining Company LLC, District Project Pump Station Upgrades, Phase 2, Parcel No. 2, Martinez, dated 2022; and THAT staff is authorized to record said document in the Office of the Recorder of Contra Costa County. PASSED AND ADOPTED this 3rd day of March 2022 by the Board of Directors of Central San by the following vote: AYES: Members: NOES: Members: ABSENT: Members: David R. Williams President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Katie Young Secretary of the District Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm, Esq. Counsel for the District March 3, 2022 Regular Board Meeting Agenda Packet- Page 79 of 165