Item 5.c.
F__1_448�411C_S0
February 16, 2022
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE UPDATE ON FISCAL YEAR 2021-22 MID -YEAR CAPITAL
IMPROVEMENT BUDGET
Attached is a presentation on the Fiscal Year 2021-22 Mid -Year Capital Improvement Budget Update.
Strategic Plan Tie -In
GOAL TWO: Environmental Stewardship
Strategy 1—Achieve 100% compliance in all regulations, Strategy 2—Anticipate and prepare for potential regulatory
changes
GOAL THREE: Fiscal Responsibility
Strategy 2 — Ensure integrity and transparency in financial management
GOAL FOUR: Workforce Development
Strategy 3— Inspire employee engagement
GOAL FIVE: Infrastructure Reliability
Strategy 1— Manage assets optimally to prolong their useful life, Strategy 2 — Execute long-term capital renewal and
replacement program, Strategy 3 — Protect personnel and assets from threats and emergencies
GOAL SIX: Innovation and Optimization
Strategy 1— Implement the Central San Smart Initiative
ATTACHMENTS:
1. Presentation
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 30 of 53
Page 2 of 13
FISCAL YEAR (FY) 2021-2022
CAPITAL IMPROVEMENT BUDGET
MID -YEAR UPDATE
Engineering & Operations Committee
February 16, 2022
Edgar J. Lopez, P.E.
Capital Projects Division Manager
FY 2021-22 CAPITAL IMPROVEMENT BUDGET (CIB)
WITH CURRENT EXPENDITURES AS OF
12/31/21
Totals:
$145,836,673
$33,936,070
23%
Includes all past budgets and carry forward
-
Budget
Actual
%Actual
Program
to Date*
Expenditures
Budget Spent
to Date
Collection System (CS)
$51,406,711 $18,582,270
36%
Treatment Plant (TP)
$67,181,424
$10,023,066
15%
General Improvements
$5,024,653
$989,265
20%
Recycled Water
$19,873,885
$4,341,469
22%
CIB Contingency
$2,350,000
NA
NA
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet -Page 31 of 53 1
Page 3 of 13
COLLECTION SYSTEM -
SEWER RENOVATION PROJECTS
In Construction
• South Orinda, Phase 8 — 5,750 feet of sewers (100% complete)
• Walnut Creek, Phase 15 — 9,400 feet of sewers (33% complete)
• North Orinda, Phase 8 — 9,930 feet of sewers (41 % complete)
In Design
• Danville, Phase 4 — Bidding in March, includes 9,200 feet of
sewers
• Bid projects from Collection System Sewer Renovation, Phase
1, include the next phases of Martinez, Orinda, Walnut Creek,
Pleasant Hill, and Lafayette
• Bidding Phase 2 of Pump Station Upgrades and San Ramon
Electrical Improvements soon
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 32 of 53 2
Page 4 of 13
WALNUT CREEK, PHASE 15
Open Trench
n�� a
•
C-ord
Berkeley
h�
-_ Oalclantl
ireament na acJiry
t c —c--.na Stations
em Isa.e cmaowg.coaeamti
v _�3,ve,aNu
Pumping Stations
Pipebursting
New PVC Sewer
51
Pump Station
Upgrades
OPhase 1 Pump Stations
• Moraga
• Orinda Crossroads
• Flush Kleen
OPhase 2 Pump Stations
• Martinez
• Fairview
• Maltby
• San Ramon (for Bidding)
61
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 33 of 53 3
Page 5 of 13
PUMP STATION UPGRADES, PHASE 1
DISTRICT PROJECT (DP) 8436
• Total Project Budget: $35 million (M)
• Contractor: Mountain Cascade, Inc.
• Contract Price: approx. $25.6 M
• Estimated completion by April 2022
• Major electrical, mechanical, and
emergency generator backup systems
• Nearing 90% completion
' 7
PUMP STATION UPGRADES -
MAJOR ITEMS IN PROGRESS
-0-1
u
New Control Panel
w
Moraga Pump Room —
AII Electric -Driven Pumps
New Emergency
Generator
a
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 34 of 53 4
Page 6 of 13
OTHER CS PROJECTS AND ITEMS TO COME
Projects in Process
• Pump Station Upgrades, Phase 2, which includes
renovation of three Martinez pump stations, 100% Design
complete
• San Ramon Electrical Improvements 90% Design in
progress, aimed to replace variable frequency drives and
other electrical equipment
• Planning phase work for Large Diameter Pipeline Program
and update to the Collection System Master Plan
Items to Come
• Request for Proposal for as -needed construction
management services for pump stations
SOLIDS HANDLING FACILITY IMPROVEMENTS,
PHASE 1 A, DP 7348
0 Furnace Improvements Seismic Improvements (Multiple
® Hearth Furnaces) being evaluated
Sludge Dewatering
0 Improvements
V!�
0 Limited Sludge ® Air Pollution Control
Blending I > Improvements
Improvements I
b �9
10
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 35 of 53 5
Page 7 of 13
PHASE 1 A MAJOR ITEMS
Centrifuge and Cake Pump
Equipment
R]
Air Pollution Control
Furnace Improvements
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 36 of 53 6
Page 8 of 13
PHASE 1A SCHEDULE & COST
Repackaging of Bid Documents
• Separating Scope: Ongoing — March 2022
• Bid documents ready by July 2022
• Bid: July —August 2022
• Release major items for fabrication early or at award
• Award Contract by October 2022
Construction Duration Expectation
• Start by January 2023
• Completion by January 2025
Cost Estimate
• $60-70 M construction cost
to be re-evaluated
13
OTHER RELATED ACTIVITIES TAKING PLACE
Equipment Procurement
• Reviewing pre -purchase or other procurement options for other pieces of
equipment (i.e. electrical gear, significant valves, etc.)
Staging Area Improvements
• Construction nearly complete
• Waiting on delivery of new security guard enclosure
• Security fencing and cameras to follow
Treatment Plant Safety Enhancements, Phase 5
• Emergency stairway from the Solids Conditioning Building (SCB)
Control Room 95% complete, awaiting canopy materials
14
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 37 of 53
Page 9 of 13
INFLUENT PUMP ELECTRICAL IMPROVEMENTS,
DP 7328
• Contractor: Auburn Constructors, LLC
• Contract Price: $6,497,300
• Expected completion by November 1,
2022
• Brown and Caldwell for engineering
services during construction (ESDC)
• Construction 59% complete
UPCOMING WORK FOR DP 7328
Ongoing Work:
• Wet Well 2 Work: Summer 2022
• Rehabilitation of Influent Pump
motors and variable frequency
drive replacement for Pumps 1
through 5
• Installation of new Pump 6 and
associated bypass structure
piping
• Replacement of programmable
logic controllers, motor control
centers, and electrical wiring
• Installation of new walkways and
isolation gates for the wet wells
15
16
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 38 of 53 8
Page 10 of 13
ELECTRIC BLOWER IMPROVEMENTS,
DP 100015
• Construction 10% complete
• Contractor: Auburn Constructors,
LLC
• Contract Price: $9,594,300 (with
Piping 10)
• Completion by November 1, 2022
• HDR, Inc. for ESDC
• Ongoing Work:
.£ IL
Installation of electrical conduits,
x-rays and preparation for
electrical and blower equipment
• Backfill and compaction of
transformer pad area
• Receiving APGN equipment_
TREATMENT PLANT PIPING RENOVATIONS,
PHASE 10, DP 7369
• Lee & Ro, Inc. for ESDC
• Contract and contractor was bid
with Electric Blower
Improvements project
• Ongoing Work:
• Preparation for clarifier gate
installation and scum piping
renovation
• Completed all chemical
tubing replacement in SCB
• Planning and preparation for
replacement of hypo site 1
• Ongoing installation of new
electrical infrastructure
,7
,8
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 39 of 53 9
Page 11 of 13
OTHER TP PROJECTS AND ITEMS TO COME
• Starting construction of the Fire Protection System, Phase 3 soon
• Completed planning of the Steam and Aeration Blower Systems
Renovations, DP 7349 — staff to recommend detail design moving
forward
• Ultraviolet Disinfection Replacement and Hydraulic
Improvements, DP 100012, planning near completion and
preliminary design is in progress
• Planning for the Aeration Basins Diffuser Replacement and
Seismic Upgrades, DP 100019, is completed and detail design
will be recommended by staff soon
• Started or completed several Uniform Public Construction Cost
Accounting Act (UPCCAA) informal projects, including
Headquarters Office Building Painting
FILTER PLANT AND CLEARWELL IMPROVEMENTS,
PHASE 1A, DP 7361
Ncw clnr 01.1 —h—f — and
Project Scope
19
zo
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 40 of 53 10
Page 12 of 13
FILTER PLANT AND CLEARWELL IMPROVEMENTS -
PHASE 1A, DP 7361
• Contractor: C. Overaa & Company
• Contract Price: $26,584,000 (44% paid as of November)
• Total Estimated Project Budget: $38,589,000
• Notice to Proceed: October 13, 2020
• Completion Date: October 30, 2022
• Work Completed:
• Earthwork completed with raised Pacheco roadways
• Steel tanks constructed and coated
• Piping received and installation ongoing
• Electrical ongoing
• Filter rehabilitation in progress
RECYCLED WATER PIPING INSTALLATION
21 1
22
February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 41 of 53 11
Page 13 of 13
QUESTIONS?