Loading...
HomeMy WebLinkAbout04.a. Review Draft Position Paper to approve a new Capital Project in Fiscal Year 2021-2022 for Steam Renovations, Phase 1 and separate from current District Project 7349; Find the new project is exempt from the California Environmental Quality Act (CEQA)Page 1 of 10 Item 4.a. DCENTRALSAN BOARD OF DIRECTORS POSITION PAPER DRAFT MEETING DATE: FEBRUARY 16, 2022 SUBJECT: REVIEW DRAFT POSITION PAPER TO APPROVE ANEW CAPITAL PROJECT IN FISCAL YEAR 2021-22 FOR STEAM RENOVATIONS, PHASE 1 AND SEPARATE FROM CURRENT DISTRICT PROJECT 7349; FIND THE NEW PROJECT IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITYACT (CEQA); AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE A NEW PROFESSIONAL ENGINEERING SERVICES AGREEMENT IN AN AMOUNT NOT TO EXCEED $1.4 MILLION WITH HDR, INC. FOR FINAL DESIGN AND BIDDING SERVICES SUBMITTED BY: INITIATING DEPARTMENT: NITIN GOEL, SENIOR ENGINEER MICHAEL CUNNINGHAM, ASSOCIATE ENGINEER ENGINEERING AND TECHNICAL SERVICES- PDS-ASSET MANAGEMENT REVIEWED BY: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION MANAGER EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ISSUE The Board of Directors (Board) authorization is required for the General Manager to enter into a new professional engineering services agreement in an amount greater than $200,000, or initiate a new project not listed in the Capital I mprovement Budget (Cl B). BACKGROUND On December 20, 2018, the Board authorized staff to enter into an agreement with HDR, I nc. (HDR) for the condition assessment and preliminary design of the Steam and Aeration Blower Systems Renovations, District Project (DP) 7349. This decision was made after a very competitive and formal solicitation process and selection that included four qualified consulting engineering firms. HDR has completed the condition assessment evaluations, comprehensive asset evaluations, business case evaluations (BCEs), and preliminary design reports to identify the assets which merit rehabilitation and/or replacement. February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 4 of 53 Page 2 of 10 The Steam and Aeration Blower Systems Renovations is a critical and large program -type project that has produced two separate projects, the Electric Blower Improvements, DP 100015 and Aeration Basins Diffuser Replacement and Seismic Upgrades, DP 100019. Each project aims to address many of the assets and vulnerabilities identified under the planning efforts. A third project, Steam Renovations, Phase 1, is being recommended by staff to address the critical needs of the treatment plant's steam system. The scope of work was identified by condition assessment and evaluations similar to the other projects. Overall, the existing steam system appears to be in very good condition. Most of the steam system elements have been identified to have an estimated remaining useful life greater than 20 years, while others need immediate attention, such as the boiler and deaerator feedwater pumps, and waste steam exchangers. The Steam Renovations, Phase 1 will also address safety -related improvements for the boiler feedwater and blowdown sampling equipment, boiler chemical system, and specific boiler feedwater piping and valves found to be rated below operating pressure. Staff has negotiated fees not to exceed $1.4 million (M) with HDR for final design and bidding services for the new project. I n addition, staff is recommending to include a 30% design for a steam turbine generator to possibly replace a steam turbine in the future, which is considered Phase 2 of the Steam Renovations, if needed. Proceeding with a 30% design now allows for staff to better understand the Phase 2 implementation and costs. For transparency and project accounting purposes, staff is recommending to separate the Steam and Aeration Blower Systems Renovations into a new project and to execute a separate agreement with HDR. Government Code Section 1090 (Section 1090) Compliance: HDR will be performing the technical work for final design of the Steam Renovations, Phase 1, which is in compliance with Section 1090. HDR has not been precluded from continuing with the final design of the Aeration Basins Diffuser Replacement and Seismic Upgrades Projector future phases and associated potential subsequent engineering services during construction of the Steam Renovations, Phase 1 based on the following premises: 1. The publicly advertised scope of the Steam Renovations, Phase 1 for consultant selection included from its inception elements for Phase 3 and 4, related work as well as other phases; 2. HDR's role and scope on the project during the preliminary design, BCEs, and assessments were limited to technical evaluations, in nature only, and did not include any recommendations independent from staff; 3. HDR was not acting in a capacity similar to that of a Central San employee or staff; 4. HDR did not perform work that independently defined the scope of the subsequent contract amendments; 5. HDR did not influence the decision making of Central San regarding the subsequent work; and 6. Board committee meetings and Board presentations were prepared, presented, and recommendations created by Central San staff. CEQA Staff has concluded that the project is exempt from California Environmental Quality Act (CEQA) under Central San's CEQA Guidelines Section 15301, since it involves repairs, maintenance, and minor alterations to an existing sewage facility with no increase in capacity; and Section 15302, since it involves replacement of existing public facilities at the same location and with the same purpose. Any capacity increases are for non -growth inducing, wet weather purposes. Approval of this project will establish the Board's independent finding that this project is exempt from CEQA. February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 5 of 53 Page 3 of 10 ALTERNATIVES/CONSIDERATIONS The Board could consider two alternatives for the Steam Renovations, Phase 1 Final Design, as follows: Alternative 1: Status Quo - Do Nothing Alternative, which would likely lead to continuing challenges maintaining and operating the steam system which has components beyond their useful life and has been identified through condition assessments and comprehensive asset evaluations to require replacement. Replacing the equipment in a project will allow for planned outages and reduce the operational impact or risks associated with the systems. Do nothing alternative is not recommended. Alternative 2: Postpone or split scope into multiple smaller projects over multiple years, which is not recommended since the overall costs would be higher and all items are critical for either safety or for reliable operations. Projects take several months to design and longer to execute with contractors so postponing and conducting staggered timelines is not recommended. Postpone or split scope alternative is not recommended. FINANCIAL IMPACTS The total estimated project cost for the Steam Renovations, Phase 1 is $28.5 M, which includes detailed design, consultant and staff costs, construction contract, construction management, and contingency. The Steam and Aeration Blower Systems Renovations is listed on page 237 of Central San's Fiscal Year (FY) 2021-22 Budget for $35.35 M. A $500,000 transfer will be done under the General Manager's delegated authority after the Board authorizes the separation of the project. Staff will also update the next FY's C I B to reflect the budget adjustments and project descriptions. No increase to the C I B is being proposed or changes that impacts the large range Capital Improvement Plan. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this project at its meeting on February 16, 2022 and recommended RECOMMENDED BOARD ACTION Staff recommends the following Board actions: Approve a new capital project in Fiscal Year 2021-22 for the Steam Renovations, Phase 1 and separate from District Project 7349 (Steam Aeration and Blower Systems Improvements); 2. Find that the Project is exempt from CEQA: and 3. Authorize the General Manager to execute a new professional engineering services agreement in an amount not to exceed $1.4 million with HDR, I nc. for final design and bidding services for the new project. Strategic Plan re -In GOAL TWO: Environmental Stewardship Strategy 1—Achieve 100% compliance in all regulations, Strategy 4 - Reduce reliance on non-renewable energy GOAL FOUR: Workforce Development Strategy 4 — Meet or exceed industry safety standards February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 6 of 53 Page 4 of 10 GOAL FIVE: Infrastructure Reliability Strategy 1— Manage assets optimally to prolong their useful life, Strategy 2 — Execute long-term capital renewal and replacement program GOAL SIX. Innovation and Optimization Strategy 1— Implement the Central San Smart Initiative, Strategy 2 — Improve and modernize operations through technology and efficiency measures ATTACHMENTS: 1. Presentation February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 7 of 53 Page 5 of 10 STEAM RENOVATIONS, PHASE 1 DISTRICT PROJECT TBD Jean -Marc Petit, Director of Engineering and Technical Services Edgar J. Lopez, Capital Projects Division Manager Engineering and Operations Committee Meeting & February 16, 2022 February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 8 of 53 1 Page 6 of 10 STEAM RENOVATIONS PROJECT BACKGROUND 2019 LJ December 2018 Board approved Steam Project for condition assessment and preliminary design under project DP 7349 2020 2021 2022 W 77 0 July 2020 September January 2021 May 2021 February 2022 (TODAY) Board approved Electric 2040 Staff provided Board approved Staff requests Board approval Blower Improvements, Staff provided Board updates on Aeration Basins for Final Design for: DP100015 for Final Board updates Comprehensive Diffuser Steam Renovations, Design on Condition Asset Evaluation Replacement Phase 1 Assessment Results for Final Design Results NOTE: Other resulting projects will be presented to the Board, such as clarifier renovation and possible electrical improvements to be included in future projects EVALUATIONS AND PRELIMINARY DESIGN REPORT ARE COMPLETE - FINAL DESIGN REQUIRES BOARD APPROVAL 1. Condition Assessment 2. Condition Assessment Plan/Guidelines & Reporting 7A7 6. Preliminary 7. Final Design Design Reports 4 February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 9 of 53 2 Page 7 of 10 STEAM ASSETS: REPLACEMENT OF CRITICAL SUPPORT EQUIPMENT AND SAFETY IMPROVEMENTS Legend: seem I Centrifuge 2022 Design: Capital Projects System Het water Q 2022 Support: Operations & Maintenance Replace -in -Kind or Technical Assistance Heater Exchanger O No 2022 Work Required: Remaining Useful Life > 15 years Copolymer ■IIII (to Boilers) Chemical Feed condee:er Cooling WaterHo[ (CW)pumpsWater Blower Heat Resenrit Exchanger ® Water Healers Potable Condt Deaeratar I Makeup Storage Tank I B. F finalloop Waste Steam Water Ox AC EffluC,nWt %Rmurni Exchangers nge� CW � �J r Return Amine) turn I CW GSC Vacuum, Hogger, & Aeration Unit &West aFP i'rr� }�y5 H—ell Pumps Condensate Return Condensate Return STEAM ASSETS WILL BE REPLACED TO MAINTAIN SAFE AND RELIABLE SYSTEM OPERATION • Some equipment at end of remaining useful life: Critical feedwater pumps (boiler and deaerator), heat exchangers (steam condensers, waste steam, centrifuge feedwater, etc.). • Safety Improvements: Boiler feedwater chemical feed area, feedwater system and blow down sampling units, etc. • Steam Turbine Generator 30% Design: Improve cost estimate for equipment which may replace steam driven blowers in the future to produce electricity. Coordinate with Long -Term Biosolids Plan. Ip a. it F 4All I Waste Steam Exchanger Replacement Deaerator Supply Pump Example Steam Turbine Generator ' 6 CFNTPAISAN February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 10 of 53 3 Page 8 of 10 ESTIMATED PROJECT COST AND FUNDING SCHEDULE BOARD ALTERNATIVES AND RECOMMENDED BOARD ACTION L 7 ESTIMATED PROJECT COSTS DP 7349 Project Budget in Current Capital Improvement Plan (Fiscal Year (FY) 2021-22) Phase Budget -to -Date - FYs Total Planning Design Construction FY Total New Project Total Estimated Project Cost Steam Renovations, Phase 1$28.5 .Aa-CD CFNTRAI SAN February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 11 of 53 4 Page 9 of 10 STEAM RENOVATIONS SCHEDULE Year 2022 Year 2023-2025 Feb June Dec I b Jan 2022 2022 2022 J 2023 k;l 025 Equipment 100% Board Procurement Submittal Bid/Award Construction Completion Approval Documents & 30% Submittal* Long lead time, specialized equipment, may be pre - selected or purchased to be determined in design 9 BOARD ALTERNATIVES The Board could consider two alternatives for the Steam Renovations, Phase 1 Final Design, as follows: • Alternative 1: Status Quo - Do Nothing Alternative, which would likely lead to continuing challenges maintaining and operating the steam system which has components beyond their useful life and has been identified through condition assessments and comprehensive asset evaluations to require replacement. Replacing the equipment in a project will allow for planned outages and reduce the operational impact or risks associated with the systems. Do nothing alternative is not recommended. • Alternative 2: Postpone or split scope into multiple smaller projects over multiple years, which is not recommended since the overall costs would be higher and all items are critical for either safety or for reliable operations. Projects take several months to design and longer to execute with contractors so postponing and conducting staggered timelines is not recommended. Postpone or split scope alternative is not recommended. February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 12 of 53 5 Page 10 of 10 RECOMMENDED BOARD ACTION Staff recommends the following Board actions: Approve a new capital project in Fiscal Year 2021-22 for the Steam Renovations, Phase 1 and separate from District Project 7349 (Steam Aeration and Blower Systems Improvements); 2. Find that the Project is exempt from CEQA: and 3. Authorize the General Manager to execute a new professional engineering services agreement in an amount not to exceed $1.4 million with HDR, Inc. for final design and bidding services for the new project. QUESTIONS? February 16, 2022 EOPS Regular Committee Meeting Agenda Packet - Page 13 of 53 6