Item 5.b.
F--1-448�411C-S0
December 7, 2021
TO: ADMINISTRATION COMMITTEE
FROM: CHRISTINA GEE, MANAGEMENT ANALYST
REVIEWED BY: PHILIPLEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE STRATEGIC PLAN TRACKERS FOR THE FIRST QUARTER OF
FY 2021-22
Attached are the Strategic Plan Trackers for the first quarter of Fiscal Year (FY) 2021-22, the second year
of Central San's FYs 2020-22 Strategic Plan. These reports provide an update on the progress on each
goal and strategy through the fulfillment of the key success measures (KSMs) and the key metrics.
Per the Committee's request, last fiscal year's quarterly performance has been included for metrics that
are On Hold / Delayed / At Risk or Off Track.
The color legend is defined as follows for each tracker:
BLUE — Completed
• Key Metrics Tracker: Target was met for the FY
• KSMs Tracker: KSM was fulfilled
GREEN — On Track / Revised Approach
• Key Metrics Tracker: Target is on track to be met or metric is being measured differently from how it
is written in the Strategic Plan but preserving the intent
• KSMs Tracker: KSM is in progress or being done differently from how it is written in the Strategic
Plan but preserving the intent
YELLOW— On Hold / Delayed /At Risk
• Key Metrics Tracker: Ability to meet target is on hold, delayed, or at risk but recoverable
• KSMs Tracker: KSM is on hold, delayed, or at risk but recoverable
RED — Off Track
• Key Metrics Tracker: Target is in danger of not being met for the FY
• KSMs Tracker: KSM is in danger of not being fulfilled by June 30, 2022.
Staff will be available at the meeting to answer questions.
December 7, 2021 Regular ADM IN Committee Meeting Agenda Packet - Page 77 of 111
Page 2 of 24
ATTACHMENTS:
1. Key Success Measures Tracker
2. Key Metrics Tracker
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 78 of 111
Page 3 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Deliver high -quality
customer service
Maintain a positive
reputation
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 1 - CUSTOMER AND COMMUNITY
Provide Exceptional Customer Service and Maintain an Excellent Reputation in the Community
Initiative Key Success Measures Responsible
Person(s)
Continue to assess customer satisfaction, awareness, and preferred methods of Barnett
receiving information.
Provide core service of treating Respond in a timely manner to requests for service. Seitz
wastewater, along with value-added
programs to go above and beyond in
service to customers. Receive high marks on customer satisfaction surveys for Collection System Seitz / Lopez /
Operations (CSO), Capital Projects, Permit Counter, and other services. Gemmell
Continue to administer customer -facing programs such as the Household Schectel
Hazardous Waste Collection and Recycled Water Fill Station programs.
Hold informational community meetings for all major sewer renovation projects, Barnett
including outreach to officials of the impacted cities/county.
Minimize impacts to residents and
businesses during capital projects, Meet individually with property owners and/or tenants on projects involving Barnett
construction work, and maintenance. private easements.
Troubleshoot and resolve construction issues as rapidly as possible. I Barnett
Renew California Special District Leadership Foundation Transparency Young
Operate and govern with transparency. Certificate of Excellence.
Update website with the latest Board meeting agendas, public notices, financial Young / Barnett
documents, and other content.
Practice principles of Brown Act and Ethics training. I All Managers
Respond to Public Records Act requests promptly. I Young
Meet regularly with elected officials and stakeholders. I Barnett
Form and maintain relationships with Plan a customer engagement signature event to coincide with Central San's 75th Barnett
federal, state, and local elected officials anniversary.
and stakeholders.
Support Board Member engagement with elected officials and stakeholders Barnett
through presentations, events, and meetings.
Q1 Q2
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
0 On Hold /Delayed /At Risk
(KSM is on hold, delayed, or at risk but recoverable)
Q4/
Q3 Final Activities/Performance in Achieving Success Measure
FY-End (Status, Comments, and Exceptions)
Status
Ongoing and consistent.
Ongoing. See Key Metrics Tracker for response times.
See Key Metrics Tracker for customer satisfaction ratings.
Q1: Meetings will be scheduled in future quarters as needed.
Q1: Meetings/discussions occur as needed.
Q1: Met or spoke with customers as needed to resolve issues.
Changed to a three-year certificate. Will apply in Fall 2022.
Q1: Uploaded content as needed.
Completed in July 2021 with the launch of the site and
advertisements to customers in the Pipeline and on social media.
•Off Track
(KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 79 of 111
Page 1
Page 4 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 1 - CUSTOMER AND COMMUNITY
Provide Exceptional Customer Service and Maintain an Excellent Reputation in the Community
Initiative Key Success Measures Responsible
Person(s)
Increase understanding and support for
key initiatives, programs, and services.
Conduct facility tours and speaker's bureau presentations highlighting Barnett
infrastructure investments.
Develop videos and public service announcements to communicate Barnett
environmental messages and other information.
Create engaging customer publications and brochures. I Barnett
Expand media relations, including social media. I Barnett
Host the citizens' academy, Central San Academy, annually. I Gee
Develop industry -leading student education programs and implement classroom Barnett
and community education events.
Take leadership roles in, participate in, attend meetings of, and share lessons All Managers
learned from industry organizations.
Support member organizations and sister Serve on oral boards, grant mutual aid through CalWARN, and provide other All Managers
agencies. assistance as requested.
Continue to achieve recognition highlighting industry -leading work through All Managers
member organization programs.
Q1 Q2
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
0 On Hold /Delayed /At Risk
(KSM is on hold, delayed, or at risk but recoverable)
Q4/
Q3 Final Activities/Performance in Achieving Success Measure
FY-End (Status, Comments, and Exceptions)
Status
See Key Metrics Tracker for number of people served through
tours and presentations.
Q1: Filmed individual Board Member interviews to raise public
awareness of Central San's services. Created a virtual Pollution
Prevention awards presentation for Sustainable Contra Costa.
Q1: Fall Pipeline newsletter (75th Anniversary edition) in
production
Q1: Continued to monitor and grow YouTube, Facebook, Twitter,
Instagram, and Linkedln followers and impressions.
Q1: 2021 Central San Academy was held in April 2021.
See Key Metrics Tracker for number of students served through
education programs.
•Off Track
(KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 80 of 111
Page 2
Page 5 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Comply with all applicable regulations
Achieve 100%
Compliance in All Complete infrastructure improvements
Regulations required to meet regulations.
Actively manage greenhouse gas (GHG)
emissions in the most cost-effective and
responsible manner.
Foster relationships with regulatory
agencies.
Anticipate and Prepare
for Potential
Regulatory Changes
Track proposed and pending legislation
or regulatory changes; plan for possible
implementations.
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements and promote sustainability
Key Success Measures
Meet or surpass all wastewater discharge, air, and recycled water
requirements.
Continue to attain National Association of Clean Water Agencies (NACWA)
Platinum Peak Performance Awards.
Minimize sanitary sewer overflows through optimized rehabilitation,
replacement, and cleaning.
Bid the Solids Handling Facility Improvements Project.
Inspect and maintain the outfall.
Complete assessment of the Steam and Aeration Blower Renovation Project.
Prepare internal monthly GHG emission inventory updates, annual inventory
summary, and verification report and submit to California Air Resources Board
(CARB) as required.
Minimize natural gas usage and maximize landfill gas usage through daily
operations and capital improvements for energy efficiency.
Actively participate in meetings of the Bay Area Clean Water Agencies.
Communicate directly and participate in meetings and workshops with
regulatory bodies such as the Regional Water Quality Control Board, State
Water Resources Control Board, Bay Area Air Quality Management District,
Environmental Protection Agency, and CARB, as needed.
Log, analyze, review, and comment on proposed legislation and regulations
that have a direct impact on District operations, as appropriate.
Support key legislative and advocacy initiatives through customer
communications and outreach.
Incorporate potential impacts of regulatory changes into long-range
infrastructure and financing plans.
Responsible Q4 / Final
Person(s) Q1 Q2 Q3 FY-End
Status
Weer
Weer
Seitz
Lopez
Lopez
Gemmell / Goel
Cheng / Hess /
Nguyen
Weer
Schectel
Schectel
Barnett
Barnett
Lopez / Schectel
/ Gemmell /
Leiber
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Ongoing. See Key Metrics Tracker for statistics.
Q1: Received bids and rejected due to increased costs.
Project completed and has been accepted.
Q1: Condition Assessments complete and Project Design
Reports started in Q1; work is being evaluated in light of
acceleration of Phase 2 of the Solids Handling Project.
Q1: Ongoing state and federal legislative (leg) presentations at
Board meetings. Including commenting on Board approved
positions on leg.
Q1: Capital Improvement Plan updated last FY and will be
reviewed in Q2, especially for solids handling.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 81 of 111
Page 3
Page 6 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Support Regional
Development of Local
Water Supply
Explore and advance partnering
opportunities.
Continue to provide recycled water
to residents and businesses;
evaluate and process new
customer requests.
Explore opportunities for
Reduce Reliance on cost-effective renewable energy
Non -Renewable Energy generation, conservation, and
efficiency.
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL STEWARDSHIP
Meet regulatory requirements and promote sustainability
Key Success Measures Responsible 1st
Person(s) QTR
Develop and execute a contract for the Refinery Recycled Water Exchange Project
with Contra Costa Water District (CCWD) and Santa Clara Valley Water District LaBella
(Valley Water) (and/or other interested water supply agencies).
Work with CCWD and the City of Concord to supply recycled water to the Concord Gemmell
Community Reuse Project.
Collaborate with Dublin San Ramon Services District — East Bay Municipal Utility
District (EBMUD) Recycled Water Authority (DERWA) to allow DERWA to divert Gemmell / Frost /
raw wastewater from the San Ramon Pumping Station to produce recycled water to Cauble
meet DERWA's peak summer irrigation demand.
Facilitate innovative and financially viable recycled water solutions (e.g., the Diablo
Country Club demonstration satellite water recycling facility (SWRF)).
Bid the Filter Plant renovations project.
Continue to operate and maintain a reliable recycled water distribution system for
Zone 1 customers.
Continue the Residential Recycled Water Fill Station and Commercial Recycled
Water Truck Fill Programs.
Track and review energy usage; continue to explore ways to optimize efficiency in
accordance with Board policies.
Replace lighting and heating, ventilation, and air conditioning with newer, more
efficient fixtures and equipment at the Martinez campus.
Implement an onsite solar energy project.
LaBella
Lopez
Gemmell / Foss
Gemmell / Foss
Meyer / Shima
Meyer
LaBella
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
2nd
QTR
3rd
QTR
4tn QTR /
Final Activities/Performance in Achieving Success Measure
FY-End (Status, Comments, and Exceptions)
Status
Q1: Amendment No. 3 to the MOU extended the expiration date
to June 30, 2022 and was adopted by the Board on July 15tn
Central San and Valley Water have extended the staff -level Cost -
Sharing Agreement to jointly fund work by Raftelis to June 30,
2022.
01: Concord's Statement of Qualifications to select Master
Developer was submitted at the end of June. Once process is
finalized, then Central San and CCWD will begin to engage with
Concord on recycled water future.
Q1: Raw wastewater diversion to DSRSD continued after
diversion began on June 211. DSRSD ended this year's diversion
on September 10tn
Q1: Per REEP Committee request, Board -level policy on how
Central San will prioritize recycled water projects will be
discussed.
Completed in FY 2020-21.
Q1: Ongoing tracking of energy usage, and work with PG&E on
RAPIDS energy efficiency program.
01: Continuing to proceed as time allows.
01: CEQA environmental review taking longer than anticipated.
The project is currently on schedule for start-up in Q4 this fiscal
year.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 82 of 111
Page 4
Page 7 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Maintain Financial
Stability and
Sustainability
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 3 — FISCAL RESPONSIBILITY
Manage finances wisely and prudently
Initiative I Key Success Measures
Mitigate rate increases by leveraging financing opportunities to fund capital needs
Conduct long-range financial Develop scenarios to utilize debt prudently in financing the 10-Year Capital
planning. Improvement Program (CIP).
Ensure resiliency against recession
or other economic events.
Pursue State Revolving Fund loan and grant opportunities, as appropriate.
Issue debt as needed, consistent with Board direction and the debt management
policy.
Fund rate stabilization account with available funds from favorable year-end
variances.
Adopt pension and Other Post -Employment Benefits funding policy to strive
towards full funding of employee -related obligations.
Develop budgets in alignment with the Strategic Plan and Risk Mitigation Plan
Pursue opportunities for cost control through efficiencies and new technology
Manage costs. Adjust operations and maintenance budgets at rates no greater than the inflation
measures used in the 10-Year CIP.
Enforce and continuously review procurement policies to ensure competitive and
fair pricing on services and goods.
Complete annual Benchmarking Study to identify potential gaps.
Develop annual internal audit plans based on risk assessment.
Evaluate and apply risk Test and improve internal controls to mitigate risks of loss and improve efficiency
management puctices. and effectiveness.
Identify and implement lessons learned.
Responsible Q4 / Final
Person(s) Q1 Q2 Q3 FY-End
Status
Leiber
Leiber
Gemmell
Leiber
Mizuno
Leiber
Mizuno
All Managers
Mizuno
King
Gee
Johnson
All Managers
Deutsch
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Q1: SRF Loan discussions given change in direction for Solids
Handling Project underway; initial discussion held on 9/28.
Existing application will be used for reduced scope of project;
new loan or other financing will be needed for the changed
(digester) scope.
Q1: Scenarios have been developed to reflect changing project
outlooks.
Q1: Initial agreement received in mid -September for execution for
Solids Project SRF application.
Q1: Debt outlook continues to be consistent with debt
management policy.
Q1: Reserves are fully funded. Budget provides $5.2 million
planned transfer to RSA in FY 2021-22. Close-out for FY 2020-21
pending.
Q1: Pension is fully funded as of 7/1/21. OPEB is nearly fully
funded and annual contributions are at the actuarially determined
level.
Q1: FY 2021-22 Budget was developed and approved by the
Board in June 2021. FY 2022-23 Budget development will
commence in January 2022.
Ongoing task and optimizations are tracked quarterly with the
Managers.
Q1: FY 2021-22 budget as adopted was 0.3% higher than prior
year budget. As amended is 12% below prior year adopted
budget.
Q1: Continued to review procurements to ensure compliance with
policies and regulations.
Q1: Final Benchmarking Study is scheduled to be presented to
the Administration Committee and the full Board in October.
Q1: Board adopted FY 2021-22 Internal Audit Plan on 9/16.
Q1: Internal auditor work will address controls in ERP and other
key internal controls.
Q1: Ongoing.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 83 of 111
Page 5
Page 8 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Ensure Integrity and
Transparency in
Financial Management
Confirm rate structure and fees are
consistent with cost of service
principles.
Deliver reliable and relevant
financial information.
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 3 — FISCAL RESPONSIBILITY
Manage finances wisely and prudently
Key Success Measures Responsible Q1
Person(s)
Reduce average cost of overflow claims. I Deutsch
Maintain and report on Enterprise Risk Management program and risk inventory. I Deutsch
Develop and implement an equipment identification and tracking system. Meyer /
Gemmell / Goel
Conduct annual review of rates and fees. I Gemmell / Leiber
Perform annual review of non-residential customers to ensure current and Gemmell
consistent billing information and charges.
Issue the Comprehensive Annual Financial Report no later than six months Mizuno
following the end of the fiscal year.
Conduct regular internal and external financial audits. Johnson /
Mizuno / Leiber
Earn the Government Finance Officers Association Certificate of Achievement for
Excellence in Financial Reporting and the Distinguished Budget Presentation Mizuno
Award.
Leverage enterprise resource planning (ERP) technology to produce accurate, Mizuno
timely, and meaningful reports and dashboards.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4 / Final
FY-End
Status
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Q1: Average cost per overflow claim through Q1 is $21,600.
Benchmark is <$25,000.
Q1: A report was provided to the Board on 4/1/21. Subsequent
ERM report was presented in September.
Q1: Bar codes have been installed for a pilot project including
110 assets to have tags attached to them. O&M staff will easily
be able to scan the asset bar codes, and quickly create an
accurate work order in Cityworks. Working with Operations/
Maintenance to assess performance and longevity for input
before expanding to larger inventory.
Q1: Completed in April 2021 and presented to Finance
Committee.
Q1: Completed and presented to Finance Committee in April
2021.
Q1: Accepted by the Board in December 2020.
Q1: Payroll design audit completed. IT security audit completed,
pending final report. Financial Statement Audit on track for FY
2020-21.
Q1: Received Distinguished budget award for FY 2020-21.
Presented Certificate of Achievement for Excellence in Financial
Reporting to the Board on 9/16/21.
Q1: Quarterly report presented for 6/30/21; proposal to move to
quarterly reporting for at least next two subsequent quarters
pending.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 84 of 111
Page 6
Page 9 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Proactively Plan for
Future Operational
Staffing Needs
Foster Relationships
across All Levels of
Central San
Inspire Employee
Engagement
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 4 — WORKFORCE DEVELOPMENT
Recruit, empower, and engage a highly trained and safe workforce
Initiative Key Success Measures Responsible
Person(s)
Formalize an Organizational Development and Talent Management unit within O'Malley
Human Resources (HR).
Acquire a centralized learning management system to track training. O'Malley
Explore career and professional development opportunities (e.g., job shadowing O'Malley
Continue to develop employees to and rotation) to expand employees' skills to meet changing workforce needs.
meet their full potential and to fill
future leadership roles. Continue the Leadership and Supervisory Academies and Mentorship Program. O'Malley
Encourage staff to obtain technical certifications, such as Certified Reliability Meyer
Leader.
Continue to host and participate in multiagency development programs for staff O'Malley
from Central San and sister agencies.
Enhance Central San's ability to Expand the internship program placements to cross -disciplinary positions. O'Malley
recruit staff who exhibit the
organization's values. Continue participation in workforce development activities. O'Malley
Perform an employee engagement survey to develop a baseline; evaluate and O'Malley
implement viable suggestions.
Cultivate a positive work culture.
Promote a sense of community through events, team -building exercises, and All Managers
increased interdepartmental communication and collaboration.
Use the performance evaluation process to establish and communicate clear All Managers
expectations and standards.
Continue General Manager lunches with the division workgroups. Bailey
Engage the bargaining units in informal discussions on collaborative solutions to O'Malley
workplace issues.
Sustain and grow collaborative Continue the General Manager and Board Member meetings with the bargaining
relationships with the bargaining representatives. Bailey
units.
Track and implement action items from Labor Management Committee meetings. O'Malley
Expand employees' understanding Communicate important initiatives and information to employees via print and
of Central San's operations and electronic media, including the Lateral Connection employee newsletter and the Barnett
their role in the agency's success. intranet.
Q1
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4 / Final Activities/Performance in Achieving Success Measure
FY-End (Status, Comments, and Exceptions)
Status
Completed in FY 2020-21. Management Analyst transferred to
HR to oversee and develop organizational development and
talent management initiatives.
i
Q1: Performance/Learning/Safety module is being developed.
Q1: Launched Career Development Program in July and two
employees are currently participating.
Q1: Current cycle of Mentorship Program will conclude on
October 5 with mentee presentations. Now accepting
applications for Cycle 4. Supervisory Academy applications are
open and sessions will be held in 2022.
Q1: New CMM certification, CWEA Mech Tech 3, Elec/Inst Tech
II, Thermo 1, and two Ultrasound 1.
Q1: Ongoing communication with other agencies through the
Human Resources Forum and BAYWORK.
Q1: Project is on hold.
Q1: Employee Recognition Events program is available and
allows managers to request funding for team -building events to
acknowledge extraordinary achievements. Cross -divisional
committees such as IT Leadership Committee, Smart Initiative
Committee, Applied Research and Optimizations continue to
meet.
Q1: Soft rollout of new evaluation process occurred with staff
training/Q&A session held in August. Full rollout will coincide with
launch of the Goals & Performance ERP module.
Q1: Still on hold for COVID safety reasons.
Tracking log remains active and is updated at every Labor
Management Committee meeting to help implement action items.
Q1: Produced three Lateral Connection newsletters, including a
special 75th Anniversary edition in July. Communicated important
COVID-19 updates via District -wide email.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 85 of 111
Page 7
Page 10 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy I Initiative
Celebrate employees'
achievements.
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 4 — WORKFORCE DEVELOPMENT
Recruit, empower, and engage a highly trained and safe workforce
Key Success Measures Responsible
Person(s)
Expand the onboarding process. I O'Malley
Provide presentations on major projects or training in specialty areas (e.g., All Managers
Purchasing, HR) to divisions upon request.
Survey employees for customer satisfaction with internal support services. I All Managers
Recognize employee achievements via articles in the Lateral Connection, the All Managers
intranet, Board meeting announcements, and other avenues.
Initiate an employee recognition program. I O'Malley
Hold a yearly event to recognize innovative employees going above and beyond to Gee
improve and optimize their work.
Continue to monitor accident/incident causes to identify and mitigate hazards.
Ledbetter
Improve consistently in comparison
Continue to provide regular analysis summaries to the District Safety Committee,
to Bureau of Labor Statistics (BLS)
industry injury rates.
Safety Teams, and Management Team on accident/incident causation and
Ledbetter
corrective measures.
Increase visibility of Safety staff in the field.
Ledbetter
Meet or Exceed
Use learning management system to provide and track employee safety training.
Ledbetter
Industry Safety
Continue to conduct training based upon accident/incident causal factors, new
Ledbetter
Standards
Enhance the safety culture through
processes, equipment, or procedures.
improved training and
communications.
Continue to provide relevant information via safety publications and, when
Ledbetter
appropriate, a Safety Corner in the Lateral Connection.
Continue to provide information on upcoming safety -related regulations to
Ledbetter
supervisors and managers.
Q1
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4 / Final
FY-E n d
Status
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Q1: This is being worked on. Staff has added a cybersecurity
component for new staff to have training before starting work.
Q1: Preparing to hold benefits fair virtually. Wellness and
financial seminars are offered, as well as trainings for supervisors
through NorCal Employment Relations Consortium. Training/
Q&A on new performance appraisal process was held. Planning
to restart the HR @ Your Service sessions in Q2.
Q1: Internal survey system remains active for Information
Technology Helpdesk. With the new ERP, customer satisfaction
surveys for Purchasing will no longer be auto generated by the
requisition.
Q1: Lateral Connection featured Plant Maintenance staff's
certifications.
Q1: Employee Recognition Events program is available and
allows managers to request funding for team -building events to
acknowledge extraordinary achievements.
Q1: 2021 Innovations Fair is postponed to be held during the
next summer Employee Appreciation Picnic for maximum
attendance and engagement.
Q1: Articles are on hold due to avoid information overload as a
result of the amount of COVID safety information being relayed to
staff.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 86 of 111
Page 8
Page 11 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Manage Assets
Optimally to Prolong
Their Useful Life
Execute Long -Term
Capital Renewal and
Replacement Program
Protect Personnel and
Assets from Threats
and Emergencies
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 5 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Initiative Key Success Measures Responsible
Person(s)
Complete condition assessments on all critical equipment on time and incorporate Goel / Lopez /
Continue updating the 10-Year into Capital Improvement Budget or Maintenance Program as appropriate. Meyer
Capital Improvement Budget (CIB)
consistent with recommendations
of the Asset Management Implement the Large Diameter Pipe and Force Main Inspection and condition Gemmell / Frost /
Program. assessment programs. Waples
Perform Reliability Centered Maintenance, Preventative Maintenance Optimization
(PMO), Defect Elimination, Safety Quality Effectiveness Audit, Root Cause Meyer
Analysis, and other strategic reliability -based analysis on treatment plant process
systems.
Expand reliability -based Improve the asset condition monitoring program by developing and deploying
approaches to maintaining assets. condition -based and predictive -based technologies (e.g., infrared, vibration, and Meyer
ultrasound testing) across asset classes.
Add service contracts to computerized maintenance management software Meyer /
(CMMS) to track work orders. Gemmell/Goel
Transfer Pumping Stations maintenance program to CMMS. Meyer
Ensure all critical assets and processes in need of repair or replacement are
Lopez / Weer /
Integrate data from the
appropriately scheduled in the 10-Year CIP.
Meyer
Comprehensive Wastewater
Master Plan (CWMP) and Asset
Management Program into the
analysis of long-term capital
Develop a prioritization model for vertical assets.
Gemmell / Goel /
improvement needs.
Meyer
Identify vulnerable assets and develop mitigation measures. I Meyer / Goel
Harden infrastructure for climate
resiliency. Update the CWMP Technical Memo (TP8) on Resiliency and Vulnerability. Gemmell / Frost
Enhance capability to mitigate, Train staff and conduct an exercise of the Continuity of Operations Plan. Deutsch
prepare for, respond to, and
recover from emergencies.
Maintain the Emergency Operations Plan. Deutsch
Q1
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
Q2
Q3
Q4 / Final
FY-End
Status
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Q1: Steam Project condition assessments were completed in FY
2020-21 and findings were included in the creation of the CIB in
spring 2021.
Q1: Received contractor submittals for large diameter inspection
project. Large diameter pipeline inspection field work anticipated
in Q2. Force main inspection project brainstorm meetings
conducted in Q1.
Q1: Ongoing effort: inspection templates developed for each
technology; various staff have obtained certification in the
technologies; continue to implement technologies on various
asset classes. This project also overlaps with the Smart Initiative
- Asset Health Indicator and eventual health scores will be
configured based on testing/analysis and factored into the Asset
Health score.
Q1: Staff is pilot testing InfoAsset to replace InfoMaster. The
contract provides a freeze of the $7,800 annual subscription until
2023 during the pilot. Estimated savings of $64,000. In addition,
Central San will be evaluating software solutions as a part of IT
Master Plan that assist in the development of the prioritization
model for vertical assets.
Q1: Currently postponed and may be considered as part of future
treatment plant master plan update. Resiliency/vulnerability for
collection system will be included in scope for collection system
master plan update to start this FY.
Q1: Will be addressed in Collection System Master Plan Update
Q1: Continuing to operate under COVID-19 health orders which
is an actual continuity condition. Tabling plans for a continuity
exercise until we return to normal operational conditions.
Q1: Plan is up to date, minor update planned in FY 2021-22.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 87 of 111
Page 9
Page 12 of 24
' FY 2021-22 STRATEGIC PLAN
CENTRAL CENTRAL C� KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
SANITARY DISTRICT
GOAL 5 — INFRASTRUCTURE RELIABILITY
Maintain facilities and equipment to be dependable, resilient, and long lasting
Expand participation in CalWARN to represent the needs of wastewater agencies in Deutsch
emergency planning and responses.
Update emergency communication systems. Deutsch
Increase the number of licensed amateur, or HAM, radio operators among staff. Deutsch
Budget and implement the projects identified in the Security Master Plan. Deutsch
Provide regular security awareness training to staff. I Deutsch
Evaluate and implement Renovate security guard posts and update monitoring equipment. Deutsch
improvements to meet new or
evolving threats, both physical and Expand access control systems and harden certain facilities. Deutsch
digital. Upgrade treatment plant control network and its equipment to create redundant
Huie /Weer
paths.
Continue to conduct third -party cybersecurity operation assessments focusing on
technology, people, and physical assets, including an audit to gauge readiness Huie
against ransomware cyberattacks.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
0 On Hold /Delayed /At Risk
(KSM is on hold, delayed, or at risk but recoverable)
ATTACHMENT 1
Q1: Ongoing.
Q1: Update was completed last FY.
Q1: RFP delayed until Risk Mgt returns to full staffing level.
Q1: Ongoing.
Q1: In progress.
Q1: Ongoing.
Completed in FY 2020-21.
Ongoing. Additional mitigation efforts will be addressed in
Technology Master Plan.
•Off Track
(KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 88 of 111
Page 10
Page 13 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Implement the
Central San Smart
Initiative
Improve and Modernize
Operations through
Technology and
Efficiency Measures
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 6 — INNOVATION AND OPTIMIZATION
Explore new technologies for continuous improvement
Initiative Key Success Measures Responsible 1st
Person(s) QTR
Continue meetings of the steering committee formed in January 2020. 1 LaBella
Utilize data to optimize operation
and maintenance; improve asset
management; increase energy Develop an implementation schedule for the initial projects. LaBella
efficiency, staff productivity, and
safety; and reduce facility
management costs.
Establish project task forces and identify project champions. LaBella
Address e-procurement, contract management, and procurement card system King / Huie
needs.
Evaluate, select, and implement new SSC billing software. Gemmell
Implement new ERP system,
including permitting software, and
integrate with linked systems.
Leverage software towards the elimination of paper processes. All Managers
Update procedures to reflect new business workflows. I All Managers
Hold Applied Research meetings to promote innovation and continuous Frost / Cauble
improvement.
Continue to participate actively in the HYPOWERS pilot project to test an emerging Frost / Cauble
hydrothermal resource recovery process for solids handling.
Evaluate and invest in cost- Expand and improve the use of mobile computing and communication Gemmell / Lopez
effective and innovative technology technologies, including applications for inspector and surveyor field staff.
to enhance business processes.
Review 1-, 2-, 3-, 5-, and 7-year pipeline cleaning schedules for optimization. I Seitz
Provide Optimizations Program Annual Reports to Board. I Gee
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
2nd
QTR
3rd
QTR
4th QTR /
Final
FY-End
Status
Activities/Performance in Achieving Success Measures
(Status, Comments, and Exceptions)
Q1: On hold, pending completion of IT Master Plan Update and
Technology Road Map.
Q1: An Implementation Plan was developed in FY 2020-21.
Several projects will be delayed in order to coordinate with the
completion and implementation of the IT Master Plan update
currently in procurement.
Q1: This task has been completed for the projects initially
identified and is on hold for new projects, pending completion of
the IT Master Plan Update and Technology Road Map.
Q1: Continuing to work with consultant on contract management,
integrations (DocuSign and Laserfiche), inventory management,
system access for users, and reporting.
Q1: Project kick-off commenced after August 10th (SSC billing
deadline).
Q1: Staff continues to use DocuSign, PayPal, and other
technologies to conduct business electronically. Oracle now
provides for invoice approval electronically.
Q1: Staff is updating procedures as needed.
Q1: Participated in ISLE applied research meetings.
ongoing
Q1: Staff continues to participate and coordinate HYPOWERS
project. Funding and Dept. of Energy approval for Phase 2 is still
TBD.
Q1: Construction Inspectors are utilizing mobile devices. Some
aspects of Oracle Permitting Module will not be available until the
end of the year, but an interim process with partial functionality is
being used.
Always ongoing.
Q1: Executives and Managers review the Optimizations Tracking
Log quarterly. FY 2020-21 Optimizations Program Annual Report
is scheduled to be presented to the Administration Committee
and Board in December.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 89 of 111
Page 11
Page 14 of 24
ATTACHMENT 1
FY 2021-22 STRATEGIC PLAN
CENTRAL CENTRAL C� KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
SANITARY DISTRICT
GOAL 6 — INNOVATION AND OPTIMIZATION
Explore new technologies for continuous improvement
Include ERP, CMMS, supervisory control and data acquisition, document Q1: Contact with vendor is pending; contracting has proceeded
Develop a Technology Roadmap to management, asset management, geographic information system, operational Huie slower than anticipated.
encompass all major technology technology projects, and beyond.
implementation across the
organization. Organize the various technologies with overlapping areas of interest and use of Huie Q1: Phase 1 of IT Master Plan to be completed in FY 2021-22
resources to plan projects with a global view.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 90 of 111
Page 12
Page 15 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
Strategy
Maintain a Safe
Working Environment
for Employees and the
Public During the
COVID-19 Pandemic
Plan Ahead for
Scenarios of Direct
Adverse Impacts
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
GOAL 7 — AGILITY AND ADAPTABILITY
Preserve business continuity during pandemic events or major natural disasters
Initiative
Key Success Measures
Responsible
Person(s)
O'Malley
1st
QTR
Implement applicable federal guidelines, state directives, and local health and
safety orders.
Provide pandemic status updates and recommended safety, operational changes,
Barnett
and other information to employees.
Collaborate on best practices with sister agencies.
Barnett
Gemmell /
Make improvements to the business practices and workplace to reduce the risk of
Provide a safe working
transmission.
O'Malley
Implement practical and reasonable revisions to work schedules to reflect social
environment.
All Managers
distancing best practices.
Utilize automated business processes, virtual meetings, and other technologies to
All Managers
minimize physical contact.
Ensure proper personal protective equipment (PPE) is provided, including masks,
Ledbetter / King
gloves, and hygiene supplies.
Increase the frequency of cleaning on campus.
Meyer
All Managers
Minimize face-to-face contact with customers, suppliers, and contractors.
Develop and employ an alternative Find new and innovative ways to provide service to the community, including
service delivery approach where automated customer -facing programs. All Managers
practicable.
Collaborate with community partners to be responsive to their needs. Barnett
g Be prepared to modify operations if
Implement policies, procedures, and cost-effective technologies and security All Managers
needed to prevent or mitigate an measures to support teleworking as may be necessary.
event in which staffing must be Create working schedules that allow for optimal redundancy and operational All Managers
reduced on site for health and coverage.
safety reasons. Continue to cross -train staff for mission -critical functions. All Managers
Implement financial policies which
take into account the effects of
Continue to monitor and update financial performance and assumptions.
Leiber / Mizuno /
Gemmell
COVID-19 (e.g., market volatility,
deferred rate adjustments, and
Continue to present alternatives to allow appropriate policy choices for mitigating
revenue shortfalls from reduced
customer rate impacts, meeting capital needs, and ensuring financial stability as a
Leiber / Gemmell
incoming system development
result of the pandemic.
fees).
Recognize savings opportunities through reduced Operations and Maintenance
All Managers
and Capital costs as appropriate.
Re -prioritize and reschedule CIP projects as appropriate.
Account for any added costs
Lopez
due to the pandemic.
Pursue reimbursement of expenses from state and federal agencies, including
Leiber / Deutsch
available grant programs.
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
2nd
QTR
3rd
QTR
4th QTR /
Final
FY-End
Status
Activities/Performance in Achieving Success Measure
(Status, Comments, and Exceptions)
Q1: COVID-19 Exposure Prevention Plan is updated to reflect
latest guidelines, directives, and orders.
Q1: Provided updates at every Board meeting.
Ongoing and consistent.
Q1: Recommendations are being implemented and reviewed for
Return to Office Plan.
Ongoing and consistent.
Q1: Have continued to monitor and quantify COVID-19 related
impacts to revenues and costs.
Q1: Budget was adopted in June.
Q1 : Rescheduling treatment plant program due to rejected bids
for the Solids Project.
Q1: FEMA Public Assistance (PA) application in progress.
Application for $2.5 million from available $100MM pool of State
funds for special districts was underway as of 9/30 and submitted
on 10/15.
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 91 of 111
Page 13
Page 16 of 24
ATTACHMENT 1
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY SUCCESS MEASURES (KSMs) PROGRESS TRACKER
Color codes indicate the status of the KSM as of the end of the quarter. Explanations in the right -most column provide additional information about the status of the KSM.
OCompleted O On Track / Revised Approach
(KSM was fulfilled) (KSM is in progress or being done differently from how it is
written in the Strategic Plan but preserving the intent)
OOn Hold /Delayed /At Risk Off Track
(KSM is on hold, delayed, or at risk but recoverable) (KSM is in danger of not being fulfilled by 6130122)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 92 of 111
Page 14
Page 17 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 1 - CUSTOMER
AND COMMUNITY
Provide Exceptional
Customer Service and
Maintain an Excellent
Reputation in the
Community
Metric
FY 2020-21 Target
Responsible
Q1
Q2
Q3
Q4
FINAL FY-END
Comments / Issues
Person(s)
PERFORMANCE
Average onsite response time
for collection system emergency calls,
:530 minutes
Seitz
17.66
during working hours*
Average onsite response time
for collection system emergency calls,
540 minutes
Seitz
32.69
after hours*
Average customer service rating for
>_3.8 out of 4.0
Seitz
3.83
emergency calls
90.1 %
Q1: Survey data for Martinez Phase 6 was received. Additional project surveys
Average customer satisfaction rating on
>95%
Carpenter
will be mailed in future quarters are projects are completed.
construction projects
FY 2020-21:
No surveys sent
Q1: 10 Excellent ratings received and 3 Needs Improvement ratings.
Average customer satisfaction rating on
76.9%
permit counter interactions
D
?95 /D
Gemmell
Comments related to turn -around time at the permit counter.
FY 2020-21: 100%
Students served by
>_6,000
Barnett
599
Q1: Five hundred and ninety-nine (599) students were served through virtual
education programs
classrooms and education events.
Q1: One hundred and seventy-eight (178) people were served at local events
Participants in Plant / Household
Hazardous Waste Collection Facility tours
>_500
Barnett
178
and through virtual community presentations and facilities tours.
and District presentations
Q1: 79 applications have been received for the next Academy.
Participants in Central San Academy
>_35
Gee
79 applications
received
Awards or recognitions received
>_10
Young
3
Q1: 3 awards received.
* Performance may have been affected by modified working schedules to adhere to social distancing mandates due to the COVID-19 pandemic.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 93 of 111
Page 1
Page 18 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 2 — ENVIRONMENTAL
STEWARDSHIP
Meet regulatory requirements
and promote sustainability
Responsib
FINAL FY-END
Metric
FY 2020-21 Target
le
Q1
Q2
Q3
Q4
PERFORMANCE
Comments / Issues
Person(s)
Q1: On track to meet Platinum 24 (2021) target.
National Pollutant Discharge Elimination
Zero violations
Weer
System compliance
Q1: 0 Reportable Compliance Activities.
Q1: On track to meet Calendar Year 2021 GHG target.
Title V compliance
Zero violations
Weer
Recycled Water Title 22 compliance
Zero violations
Weer
Anthropogenic greenhouse gas (GHG)
<25,000 metric tons (MT)
Cheng /
emissions
CO2e per calendar year
Hess /
Nguyen
On track
On track
Q1: There were a total of 3 SSOs for this quarter.
Sanitary sewer overflows
<_2.0 spills per 100 miles
Seitz
of pipeline
Zero
Q1: There were 0 Category 1 SSOs for this quarter.
Q1: Out of the 3 SSOs this quarter, 0 were over 500 gallons.
Spills to public water
<_3
Seitz
Percent of spills
less than 500 gallons
o
?95 /o
Seitz
o
100 /o
98.32%
Pipeline cleaning schedules
>98%
Seitz
completed on time*
Pipeline cleaning quality assurance /
On >_4% of pipelines
quality control (QA/QC)*
cleaned on an annual
Seitz
D
4.43 /D
basis
95.45% FY 2020-21: 96.84 %
Pipeline cleaning QA/QC passing rate*
>_98%
Seitz
Annual Environmental Compliance
inspections and permitting
100%
Potter
100%
completed on time
Zero violations
Household Hazardous Waste (HHW)
Zero violations
Wyatt
management compliance
91.0 MG
Gallons of recycled water
>_240 million gallons (MG)
Foss
distributed to external customers
22.7 kWh
kWh of electricity produced by
>_18 million kWh (reported
Shima
co -generation using natural gas
as a rolling average)
273,000 kWh
kWh of solar power produced at Collection
>_220,000 kWh (reported
Shima
System Operations and HHW Facility
as a rolling average)
Q1: Project on track for start-up in Q4.
kWh of solar power produced
>_2.5 million kWh
by a new solar array near the treatment
(reported as a rolling
LaBella
plant campus
average)
* Performance may have been affected by modified working schedules to adhere to social distancing mandates due to the COVID-19 pandemic.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 94 of 111
Page 2
Page 19 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 3 — FISCAL
RESPONSIBILITY
Manage finances
wisely and prudently
Metric
FY 2020-21 Target
Responsible
Q1
Q2
Q3
Q4
FINAL FY-END
Comments / Issues
Person(s)
PERFORMANCE
Q1: FY 2021-22 Residential rates unchanged from FY 2020-21 and still below
Sewer Service
Charge (SSC) less
average of Bay Area Agencies. SSC / Median Income is <0.78%. Updated rate
than average of Bay
Residential rates
Residential rates
Residential rates
Residential rates
Residential rates
comparison was presented at March 25, 2021 workshop.
Area agencies
unchanged and still
unchanged and still
unchanged and still
unchanged and still
unchanged and still
Maintain service affordability
below average of
below average of
below average of
below average of
below average of
SSC plus Ad Valorem
Leiber
Bay Area agencies
Bay Area agencies
Bay Area agencies
Bay Area agencies
Bay Area agencies
tax less than average
of Bay Area agencies
<0.78% of median
<0.78% of median
<0.78% of median
<0.78% of median
<0.78% of median
:50.78% of median
household income
household income
household income
household income
household income
household income
AAA/Aa1
AAA/Aa1
AAA/Aa1
AAA/Aa1
AAA/Aa1
Ratings unchanged.
Standard and Poor's and Moody's
AAA/Aa1
Leiber
credit ratings
Q1: Debt service coverage projected to be >2.0.
Debt service coverage ratio
>2.0
Leiber /Mizuno
>2.0
Q1: Year-end projected reserves >100% based on revenue and spending
Actual reserves
as a percentage of target
100%
Leiber / Mizuno
>100%
performance in Q1.
Q1: On track with regard to budgeted spending.
Operating expenditures
as a percentage of operating budget
>95%
Leiber / Mizuno
On track
Q1: Annual Financial Report will be delivered to and accepted by Board in
Reported material weaknesses or
significant deficiencies
Zero
Leiber /Mizuno
Information not yet
December 2021. Information is not yet available as to any material weaknesses
in internal controls as part of annual
available / pending
or significant deficiencies
financial audit
This metric is no longer needed since all the data now resides in one database
Difference in inventory value in Purchasing
<1 %
King
Metric no longer needed
in Oracle, as opposed to the two databases in HTE, which required a monthly
database vs. value submitted to Accounting
reconciliation.
Q1: Data not available in Oracle enterprise resource planning (ERP) system.
Accuracy of physical inventory count
>_95%
Kin g
Data not yet
Currently implementing add -on software RF-Smart to resolve the Oracle issues.
vs. book value
available in Oracle
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 95 of 111
Page 3
Page 20 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 4 — WORKFORCE
DEVELOPMENT
Recruit,
empower, and enga
e a highly trained and
safe workforce
Metric
FY 2020-21 Target
Responsible
Q1
Q2
Q3
Q4
FINAL FY-END
Comments / Issues
Person(s)
45 days
PERFORMANCE
Average time to fill vacancy
<_60 day s
O'Malley/
(from request to hire)
Manor
Q1: Turnover with retirees: 8 employees left; 276 avg # employees = 2.9%
Turnover rate at or below
median for combined utilities
O'Malley/
o (incl. retirees)
29/o
turnover. Turnover without retirees: 6 employees left; 276 avg # employees =
via American Water Works Association
s7.8%*
Granzella
2..2% (excl. retirees)
2.2%.
(AWWA)
Average annual training hours
>_15 per full-time
O'Malley/
(external and internal training)
equivalent employee
Smith
3.62
(nt
(see comments for
Q1: July evals 78% rec'd; Aug. evals 68% rec'd; Sep. evals 33% rec'd.
Completion of
100%
O'Malley/
annual performance evaluations
Howard
Q1 performance)
Q1: 2022 Wellness Expo is dependent upon the status of the pandemic, but
Increase by >_10%
O'Malley/
Participation in annual Wellness Expo
each year
Howard
virtual Wellness activities are being developed and employees remain engaged in
1.10
1.10
1.10
1.10
1.10
the online Wellness portal.
FYs 2019-20, 2020-21, 2021-22 expect to have higher ExMod as rolling three -
Workers' compensation
experience modifier
experience
Deutsch
FY 2020-21: 1.10
FY 2020-21: 1.10
FY 2020-21: 1.10
FY 2020-21: 1.10
FY 2020-21: 1.10
year calculation includes one very bad loss year. The 1.10 factor applies for the
o
100 /D
entire FY.
Q1: Temporary Modified Duty was provided to all eligible employees.
Temporary modified duty provided
>_95% of recordable
Deutsch
(Return to Work program)
injuries
66.67%
Q1: 1 non -entry level hire; 2 promotions = 66.67%.
Internal promotions
>25%
O'Malley/
(excludes entry-level positions)
Granzella
Zero
Q1: 1 recordable injury. 139,518.33 hours worked.
Formal grievances processed
Zero
O'Malley
154.0 (via Bureau of
Employee injury and illness
Labor Statistics)
Ledbetter
1.43
lost time incident rate
s3.4 (via AWWA)*
* Median for wastewater -only utilities in FY 2017-18 as reported in the 2019 AWWA Utility Benchmarking book.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 96 of 111
Page 4
Page 21 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 5 — INFRASTRUCTURE
RELIABILITY
Maintain facilities
and equipment to
be dependable, resilient,
and long lasting
Metric
FY 2020-21 Target
Responsible
Person(s)
Q1
Q2
Q3
Q4
FINAL FY-END
PERFORMANCE
Comments / Issues
100%
Meyer
Safety -prioritized work orders
100%
completed on time
100%
Meyer
Regulatory Title V work orders
100%
completed on time
Planned treatment plant
preventative maintenance
>_90%
Meyer
97%
completed on time
01: CSO completed all valve exercising on time.
Recycled water distribution system
maintenance schedules
>_98%
Seitz
100%
completed on time
100%
01: 1 mile of sewer replaced or rehabilitated.
Uptime for vehicles
100%
Seitz
Miles of sewers
replaced or rehabilitated
>_6.0
Mestetsky
1 mile
(focused on deteriorated
small diameter pipelines)
Q1: Received contractor submittals for large diameter inspection
>_3 miles per year for
Large diameter and force main condition
the next five years
Waples / Gemmell
project. Large diameter pipeline inspection field work anticipated in
assessment
starting in
/ Frost
Q2. Force main inspection project brainstorm meetings conducted in
FY 2020-21
Q1.
Q1: Oracle report on this metric is still in development.
Average time to execute Engineering
Data not yet
agreements from complete package
<_2 weeks
Lopez / King
available in Oracle
submittal or Board approval
Data not yet
01: Financials were not available at time of reporting.
Lopez
Capital expenditures
(for performance)
nce)
available
available
as a percentage of capital budgeted cash
?90%
Mizrmarmauno
FY 2020l -21: 60%
flow including carry forward
(for reporting)
100%
01: 100% uptime.
Information system outages
100% uptime
Huie
affecting normal business operations
Q1: Zero lost data.
Data backup and recovery
Zero lost data
Huie
Zero lost data
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 97 of 111
Page 5
Page 22 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 6 - INNOVATION
AND OPTIMIZATION
Explore
new technologies
for continuous improvement
Metric
FY 2020-21 Target
Responsible
Person(s)
Q1
Q2
Q3
Q4
FINAL FY-END
PERFORMANCE
Comments / Issues
Q1: On hold, awaiting completion of IT Master Plan Update and
Projects initiated under
-3
''
LaBella
(no FY 2020-21
Technology Road Map.
Central San Smart
Q1 data available)
Q1: Pilot tests continued:
1. Remote Manhole Monitoring Pilot (removing pilot units and wrapping
up pilot report, procurement of units will happen this FY)
2. Water Pigeon Pilot (wrapping up pilot and pilot report, evaluating
Reviews or pilot tests
>3
Frost /
other meter reading options)
of new and promising technology
All Managers
3. Tertiary Membrane/RO Pilot (installation in progress)
4. WW Based Epidemiology (continued 1 x per week sampling with UC
Berkeley and CC Health)
5. Multi -Sensor Inspection Pilot (received and reviewing contractor
submittals, inspections expected in Q2).
Q1: Papers and presentations:
1. WW Based Epidemiology - Central San co-authored journal article w/
Research papers and
>_3 papers or
Frost /
UC Berkeley "Tools for interpretation of wastewater SARS-CoV-2
findings presented
presentations
All Managers
temporal and spatial trends demonstrated with data collected in the
San Francisco Bay Area", published in Water Research X (Aug
2021).
Don't Just Fix It; Improve It
?35
Meyer
6
(no FY 2020-21
work orders completed*
Q1 data available)
Q1: Optimization efforts continue, and managers continue to track progress
Completed optimizations
>_20
Gee
quarterly.
* Performance was affected by modified working schedules to adhere to social distancing mandates due to COVID-19.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 98 of 111
Page 6
Page 23 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 7 — AGILITY
AND ADAPTABILITY
Preserve business
continuity durin
3 pandemic events
or major natural disasters
Metric
FY 2020-21 Target
Responsible Person(s)
Q1
Q2
Q3
Q4
FINAL FY-END
PERFORMANCE
Comments / Issues
Number of
Q1: 1.09 standard deviation due to overflows being
sanitary sewer overflows
51 standard
Seitz
109
reduced when compared to the last five years for the
(during the last five years
deviation
.
same time period.
for the same time period)*
01: 0 days out of compliance for air and liquid permits.
Nguyen (Air)
100% (Air)
�
Esparza (Liquid)
100% (Liquid)
0
Permit compliance
100%
a
Q1: 4.16 days out of compliance for collection system.
O
Seitz
95.5%
(Collection System)
FY 2020-21: 99.8%
Q1: Continuing arrangements of prior quarters. Return to
Productivity
95%
Leiber
>95%
office pending mandatory vaccination meet and confer
with bargaining units as of 9/30/21.
Increase in costs to the
Q1: O&M spending is below budget.
Operations & Maintenance
0%
Leiber / Mizuno
None
budget beyond
what is approved
Revenue projections met
100%
Leiber / Mizuno
Q1: Revenues are essentially on track.
U
C
0
Additional increase in
D
<_5 /D
Leiber
Pension funding at
01: Unfunded actuarial accrued liabilities are paid off and
unfunded liabilities
100%
is at 0%.
Funds granted from
Q1: FEMA Public Assistance (PA) application in progress.
available state and federal
D
100% of requested
Leiber /Deutsch
Pending
Application for $2.5 million from available $100MM pool of
reimbursement programs
funds
State funds for special districts was underway as of 9/30
and submitted on 10/15.
Seitz
(Average customer service
3.83
rating for collection system
emergency calls)
L
Carpenter
90.1 %
Q1: Survey data for Martinez Phase 6 was received.
E
(Average customer
Additional project surveys will be mailed in future quarters
o
Customer satisfaction levels
>_90%
satisfaction rating on
FY 2020-21:
are projects are completed.
U
construction projects)
No surveys sent
Gemmell
76 9%
Q1: 10 Excellent ratings received and 3 Needs
(Average customer
Improvement ratings. Comments related to turn -around
satisfaction rating on permit
o
FY 2020-21: 100/
time at the permit counter.
counter interactions)
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)
December 7, 2021 Regular ADMIN Committee Meeting Agenda Packet - Page 99 of 111
Page 7
Page 24 of 24
ATTACHMENT 2
CENTRAL CONTRA COSTA
SANITARY DISTRICT
FY 2021-22 STRATEGIC PLAN
KEY METRICS PROGRESS TRACKER
GOAL 7 — AGILITY
AND ADAPTABILITY
Preserve business
continuity durin
3 pandemic events
or major natural disasters
Metric
FY 2020-21 Target
Responsible Person(s)
Q1
Q2
Q3
Q4
FINAL FY-END
PERFORMANCE
Comments / Issues
Requested personal
protective equipment (PPE)
100%
Ledbetter / King
provided
Requested safety
Q1: Additional controls in place for opening of
>.
improvements
100%
Ledbetter / Gemmell
Lobby/Permit Counter.
12
to the workplace fulfilled
Employees trained on
100%
Ledbetter
COVID-19 prevention
Twice -daily cleaning of all
Q1: B&G continued the daily COVID-19 cleaning using
restroom facilities
D
100%
Meyer
the matrix supplied by HR and Safety. Cleaning frequency
will increase with Return to Office.
Q1: Financials are not available at time of reporting.
o
C: _ E
Capital expenditures as a
°° m `°
> 0)
percentage of capital
o **
>_85 /o
Lopez
Data not yet available
c, o o
budgeted cash flow
a
FY2020-21: 60%
wU
including carry forward
* The intent of this metric is to measure whether overflows have increased during pandemic events or natural disasters. If increased, the goal is to have a standard deviation of <_1. Because overflows have been reduced in FY 2021-22 when compared to the past five years, the standard
deviation means the target was met and exceeded.
** Performance on the Goal 7 metrics will only be tracked in the event of a pandemic or natural disaster, in which case the target for this metric will supersede the >_90% target of the same metric in Goal 5.
Color codes indicate the status of meeting the target for the FY as of the end of the quarter. Explanations in the right -most column provide additional information on the status of meeting the target.
•Completed O On Track / Revised Approach O On Hold / Delayed / At Risk
(Target was met for the FY) (Target is on track to be met or metric is being measured differently (Ability to meet target is on hold, delayed,
from how it is written in the Strategic Plan but preserving the intent) or at risk but recoverable)
•Off Track
(Target is in danger of not being met for the FY)