Loading...
HomeMy WebLinkAbout14. General Manager Written Announcements Page 1 of 2 Item 14.a. CENTRALSAN jdf A- hom CENTRAL CONTRA COSTA SANITARY DISTRICT November 18, 2021 TO: HONORABLE BOARD OF DIRECTORS FROM: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: ANNOUNCEMENTS - NOVEMBER 18, 2021 Attached are the announcements for the above meeting. ATTACHMENTS: 1. General Manager Written Announcements November 18, 2021 Regular Board Meeting Agenda Packet- Page 65 of 112 Page 2 of 2 Attachment 1 Board Meeting of November 18, 2021 General Manager Written Announcements PROJECT UPDATES 1) Public Bidding of Fire Protection System, Phase 3, District Project 7373 The existing fire protection systems at the treatment plant have been installed over a 45-year period and have been added or modified on a project-to-project basis. The older systems are becoming unreliable and difficult to maintain. This is the third phase of the Fire Protection System Project at the wastewater treatment plant. Phase 3 includes replacing two older standalone fire alarm systems and connecting them via fiber cabling to the main fire alarm notification panel located in the Plant Operations Building. This project will be advertised on November 29 and December 3, 2021. Bids are scheduled to be opened on December 21, 2021. The Engineer's estimate is $450,000. More information will be presented when the Board is asked to award the construction contract on January 27, 2022, tentatively. HUMAN RESOURCES 2) Central San Welcomes New Household Hazardous Waste Technician II Latoya Williams On October 25, the Household Hazardous Waste (HHW) Program welcomed Latoya Williams as its new HHW Technician II. Latoya has worked with the HHW team for the last six months as an HHW Technician. Prior to joining Central San, she was an Environmental Risk and Compliance Supervisor with Nortech Waste, LLC in Roseville. Latoya lives in the Sacramento area, loves the outdoors, traveling, and is an avid reader. November 18, 2021 Regular Board Meeting Agenda Packet- Page 66 of 112