Loading...
HomeMy WebLinkAbout07. Authorize property purchase agreement and accept Grant Deed and Grant of Easement for Maltby Pump Station in Martinez Page 1 of 6 Item 7. CENTRAL SAN BOARD OF DIRECTORS POSITION PAPER MEETING DATE: NOVEMBER 18, 2021 SUBJECT: AUTHORIZE A PROPERTY PURCHASE AGREEMENT AND ADOPT RESOLUTION NO. 2021-079 ACCEPTING A GRANT DEED AND GRANT OF EASEMENT FROM RETHINK GREEN LLC, RELATED TO PUMP STATION UPGRADES-PHASE 2, DISTRICT PROJECT 8457, PARCELS 1A, 1 B, AND 2, FOR CENTRAL SAN'S MALTBY PUMP STATION SUBMITTED BY: INITIATING DEPARTMENT: DAVID KRAMER, SENIOR RIGHT OF WAY ENG-PDS-DIVISION MANAGER AGENT REVIEWED BY: DANA LAWSON, SENIOR ENGINEER DANEA GEMMELL, PLANNING & DEVELOPMENT SERVICES DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING & TECHNICAL SERVICES Roger S. Bailey General Manager ISSUE Authorization from the Board of Directors (Board) is required to execute a property purchase agreement. A resolution of the Board is required to accept Grant Deeds and Grant of Easements and record the documents. BACKGROUND The Maltby Pump Station was built in 1969 and needs to be replaced with a new pump station. The new pump station will include a new flood wall around the property. To construct the new pump station and flood wall, additional property rights are required from the adjacent property owners. November 18, 2021 Regular Board Meeting Agenda Packet- Page 35 of 112 Page 2 of 6 These property rights include an 8,422 square foot Fee Parcel acquisition and a 1,655 square foot Sewer Easement acquisition from a private property owner; and a 3,218 square foot Temporary Construction Easement from the Flood Control District. ALTERNATIVES/CONSIDERATIONS The Board could decline to accept the Grant Deed and Grant of Easement. This alternative is not recommended since Central San would not have the land rights necessary to construct the improvements to the Maltby Pump Station. FINANCIAL IMPACTS The purchase price for the property rights from the adjacent property owner is $80,000 and is based on an accredited appraiser's evaluation. This is included in the budget for District Project 8457, Pump Station Upgrades-Phase 2. COMMITTEE RECOMMENDATION The Real Estate, Environmental and Planning Committee reviewed this matter at its meeting on October 25, 2021 and recommended approval. RECOMMENDED BOARD ACTION Staff recommends the following Board actions: 1. Authorize the Board President to execute the property purchase agreement, once the General Manager is satisfied with the documents; and 2. Adopt the proposed resolution accepting the executed Grant Deed and Grant of Easement and authorizing staff to record documents with the Contra Costa County Recorder. Strategic Plan Tie-In GOAL FIVE:Infrastructure Reliability Strategy 2—Execute long-term capital renewal and replacement program ATTACHMENTS: 1. Map - Fee Parcel 2. Map - Sewer Easement 3. Map -Temporary Construction Easement 4. Proposed Resolution November 18, 2021 Regular Board Meeting Agenda Packet- Page 36 of 112 EXHIBIT "B" Attc1&?fl4nt 1 CENTRAL CONTRA COSTA SANITARY DISTRICT RIGHT OF WAY MAP for FEE PURCHASE \�9 RETHINK GREEN USA LLC o 00 DN 20 1 6—73 1 686 ov O C)�: v0 \l9 � Is, S 53°29'53" E 93.52' v "� � )9S N-60'5 w (R L �, PARCEL 1 N 8,422 SF C ° 0\ 0.19 Acres z o \ S-58°16 00„- E - (R) PARCEL 8 \ (SUB PARCEL B) I 6330 OR 434 �o POB PARCEL 7' TRACT l (SUB PARCEL A) / U) U w M HENRY TO CCCSD w Q 0 6330 OR 434 6] � U) 0 -J � co M I \ �jG�G �� o U -- & G o �6��TO Q /CRC (k��� W Q 4/ LU LEGEND 1 1 .26' CCFCWCD / POB POINT OF BEGINNING 25' 6323 OR 480 C.)POC POINT OF POC / CCFCWCD COMMENCEMENT 5888 OR 588 O � V (R) RADIAL BEARING z I W SSE SANITARY SEWER N EASEMENT co / �S CCFCWCD O w 5888 OR 588 V a _ N cf) 60 Co U ACCESS EASEMENT a Q PARCEL 7 TRACT II (SUB PARCEL D) 6330 OR 434 DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: KWJ GST J 13A2 8457 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" = 30' 5/6/2021 380-030-027 1A 16 November 18, 2021 Regular Board Meeting Agenda Packet- Page 37 of 112 EXHIBIT "B" AttacMMW 2 CENTRAL CONTRA COSTA SANITARY DISTRICT RIGHT OF WAY MAP for SEWER RETHINK GREEN USA LLC \C,y DN 2016-751686 ov \s \\� N cn - 1 a w o o PARCEL 1 U to 00 8,422 SF \ Q -0 ;° \ 0.19 Acres o 0- N \ POT � POB � S 53°29'53" E 100.73 \/ \ I� BC SSE, PARCEL 9 , oo � � � PARCEL 8 � SUB PARCEL "C" N (SUB PARCEL B) 6330 OR 434 6330 OR 434 o co \ PARCEL \ TRACT l (SUB PARCEL A) `� U) w M HENRY TO CCCSD �F `�I w Q j 6330 OR 434 ce) lec, 09- D_ /CO 0 W LU LEGEND 11 .26' a' BC BEGINNING OF CURVE 25' CCFCWCD 5552 OR 54J CCFCWCD V POB POINT OF BEGINNING �POC / 5888 OR 588 0 POC POINT OF \ V COMMENCEMENT z I � W POT POINT OF TERMINUS � S SQUARE FEET � �S, CCFCWCD SSE SANITARY SEWER O w 5888 OR 588 (� EASEMENT — — — Q c C° w ACCESS EASEMENT a E' Q PARCEL 7 TRACT II (SUB PARCEL D) 6330 OR 434 M DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: DW GST J 13A2 8436 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" = 30' 9/24/19 380-030-027 2 November 18, 2021 Regular Board Meeting Agenda Packet- Page 38 of 112 EXHIBIT "B" AttadWd'At 3 CENTRAL CONTRA COSTA SANITARY DISTRICT TEMPORARY CONSTRUCTION EASEMENT LEGEND RETHINK GREEN USA L L C I POB POINT OF BEGINNING DN 20 1 6-73 1 686 �n POC POINT OF ° COMMENCEMENT �� POT POINT OF TERMINUS I O (R) RADIAL BEARING S 53°29 53" E 93.52=__ -- - -- TCE TEMPORARY N 60°57_16- W (R) I CONSTRUCTION EASEMENT D A I ov CIO TCE o 3,218 SQ. FEET O �ON U W �� 04 ZOE 2 � 0 � O S 58° R co / � r7 Z POT 15' / PARCEL 8 I / (SUB PARCEL B) 6330 OR 434 POB PARCEL 7 TRACT I / 9C' v�i v w M (SUB PARCEL A) w cr Q v � oo HENRY TO CCCSD Trs j w m o Ln I o 6330 OR 434 /eLU P�p 01 tiLU 1 1 .2 6' CCFCWCD 6523 OR 480� cc POC CCFCWCD V 5888 OR 588 O z I / C.)002 w LU �s, CCFCWCD O w 5888 OR 588 (� o~ w ACCESS EASEMENT Q C° (� PARCEL 7 TRACT II a U (SUB PARCEL D) Q I/ 6330 OR 434 a DRAWN BY: CHECKED BY: SYSTEM MAP: JOB NO.: ell KJW GST J 13A2 8457 SCALE: DATE: ASSESSOR'S PARCEL NO.(APN): PARCEL NO.: 1" =30' 5/6/2021 380-030-027 1 B November 18, 2021 Regular Board Meeting Agenda Packet- Page 39 of 112 Page 6 of 6 ATTACHMENT 4 RESOLUTION NO. 2021-079 A RESOLUTION OF THE CENTRAL CONTRA COSTA SANITARY DISTRICT ACCEPTING GRANT DEED AND GRANT OF EASEMENT RELATED TO THE PUMP STATIONS, PHASE 2, DISTRICT PROJECT 8457 BE IT RESOLVED by the Board of Directors of Central Contra Costa Sanitary District (Central San) as follows: THAT Central San hereby accepts the Grant Deed and Grant of Easement Deed for the Pump Stations, Phase 2, from the following property owners: Rethink Green USA, LLC 0 Waterbird Way, Martinez (APN: 380-030-034) THAT staff is authorized to record said document in the Contra Costa County Recorder. PASSED AND ADOPTED this 18t" day of November 2021, by the Board of Directors of Central San by the following vote: AYES: Members: NOES: Members: ABSENT: Members: Tad J. Pilecki President of the Board of Directors Central Contra Costa Sanitary District County of Contra Costa, State of California COUNTERSIGNED: Katie Young Secretary of the District Central Contra Costa Sanitary District County of Contra Costa, State of California Approved as to form: Kenton L. Alm, Esq. Counsel for the District November 18, 2021 Regular Board Meeting Agenda Packet- Page 40 of 112