Item 4.c.
DCENTRALSAN
MEETING DATE: NOVEMBER 9, 2021
BOARD OF DIRECTORS
POSITION PAPER
DRAFT
SUBJECT: REVIEW DRAFT POSITION PAPER TO AUTHORIZE THE GENERAL
MANAGER TO EXECUTE TWO PROFESSIONAL ENGINEERING
SERVICES AGREEMENTS WITH; 1) HAZEN & SAWYER, INC. IN AN
AMOUNT NOT TO EXCEED $750,000; AND 2) STANTEC I N AN AMOUNT
NOT TO EXCEED $500,000, EACH FOR A FIVE-YEAR TERM TO PROVI DE
AS -NEEDED CAD/BIM SERVICES FOR CENTRAL SAN PROJECTS
SUBMITTED BY: INITIATING DEPARTMENT:
KHAE BOHAN, ASSET MANAGEMENT ENGINEERING AND TECHNICAL SERVICES -
PROGRAM ADMINISTRATOR PDS-ASSET MANAGEMENT
NITIN GOEL, SENIOR ENGINEER
REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ISSUE
Board of Directors (Board) authorization is required for the General Manager to execute professional
engineering services agreements in an amount greater than $200,000.
BACKGROUND
The Capital Projects Division (Capital Projects) uses professional design and construction support for
many of Central San's projects. Projects typically use Computer -Aided Design and Drafting (CAD)
software to produce construction drawings. For the design of large and complex Treatment Plant projects,
consultants are now using 3D (dimensional) laser scanning tools and Building Information Modelling (BI M)
workflow and software to dynamically manage the project lifecycle in 3D (geometry), 4D (schedule), 5D
(budget), and 6D (asset management).
B I M technology has already been used on several Treatment Plant projects for Central San. Staff has
identified a need to have specialized consultants engage with staff to develop CAD and B I M Standards to
standardize drawing information and to provide consistency in project submittal deliverables. Having a
standard B I M Execution Plan will provide a foundational framework for multiple consultants to use and
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 15 of 29
Page 2 of 9
ensure successful deployment and deliverables of advanced design technologies on B I M projects, as well
as record drawings of as -built conditions. The plan will optimize work and model flow across a project.
Categorization and documentation using a B I M workflow will help Central San better manage its assets.
The standardization efforts are included as part of the Capital Improvement Program and Budget
Improvements, District Project8251.
An evaluation of the design and construction work projected in the next few years indicates that Capital
Projects will also require as -needed engineering support to manage the data and review deliverables. The
proposed agreements will assist with upcoming capital projects within the Ten -Year Capital Improvement
Plan (CI P).
Contracting with two engineering firms provides the maximum flexibility to accommodate project needs.
Furthermore, as -needed contracts result in a lower overall cost and reduces staff administration time
required to issue separate individual contracts per project.
Staff prepared and posted a Request for Proposal (RFP) on PlanetBids and the Central San website for
CAD and B I M Standards Development and As -Needed CAD and B I M Services. On August 13, 2021,
two proposals were received and evaluated. Staff selected Hazen & Sawyer (Hazen) and Stantec based
on their experience, past performance, and proposed fees. Hazen's fees are expected to be greater since
their scope includes additional tasks of developing CAD and BI M standards, details, templates, and
resource libraries.
ALTERNATIVES/CONSIDERATIONS
Staff evaluated several alternatives for the Board to consider:
Alternative 1: Consolidate the work into one agreement, which is not recommended. Both
consultants will equally split the as -needed scope of work to assist with CAD and BIM drawings and having
two consultants potentially available allows for flexibility when urgent or immediate work is needed.
Alternative 2: Status Quo - Do Nothing Alternative. This alternative would be for the Board to continue
current and past practice without CAD and BI M Standards and without BI M Execution Plans for upcoming
projects under the Ten -Year C I P, which is not recommended.
Alternative 3: Conduct CAD/BIM Standards and hire Central San staff. The technology used today
for more complex project and asset management systems include the CAD/B I M Standards that staff is
recommending at a cost of $250,000. The as -needed support can be performed in house if new or
repurposed positions are created. At least one additional full-time position would be required. However,
staff is not requesting to hire a permanent position at this time.
FINANCIAL IMPACTS
The total amount of two agreements will not exceed $1.25 million over the duration of five -years; Hazen &
Sawyer for $750,000 and Stantec for $500,000. The standardization effort of $250,000 is budgeted under
District Project 8251, which can be found on page 266 of the Fiscal Year 2021-22 District Budget. The
agreement duration may extend beyond 2027, if the projects being used are delayed. The as -needed work
will be paid for by projects approved and budgeted in the CI P.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this item at its November 9, 2021 meeting and
recommended
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 16 of 29
Page 3 of 9
RECOMMENDED BOARD ACTION
Authorize the General Manager to execute two professional engineering services agreements with 1)
Hazen & Sawyer, I nc. in an amount not to exceed $750,000; and 2) Stantec in an amount not to exceed
$500,000, each for a five-year term, to provide as -needed CAD/B I M services for Central San projects.
Strategic Plan re -In
GOAL FIVE: Infrastructure Reliability
Strategy 1— Manage assets optimally to prolong their useful life, Strategy 2 — Execute long-term capital renewal and
replacement program
ATTACHMENTS:
1. Presentation
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 17 of 29
Page 4 of 9
CAD AND BIM
STANDARDS DEVELOPMENT AND
AS -NEEDED CAD AND BIM SERVICES
Jean -Marc Petit, Director of Engineering and Technical Services
Edgar J. Lopez, Capital Projects Division Manager
Nitin Goel, Senior Engineer
Engineering & Operations Committee Meeting
November 9, 2021
PURPOSES OF CAD AND BIM
STANDARDS DEVELOPMENT AND
AS -NEEDED CAD AND BIM SERVICES
• Expand Current As -Built Program
• Roadmap Based on Standards Developed
• Develop standard drawings as identified in District Project 8251
Computer -Aided Design and Drafting (CAD)
Building Information Modelling (BIM)
zi
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 18 of 29 1
Page 5 of 9
BACKGROUND OF CAD AND BIM AT CENTRAL SAN
1. Capital Projects uses professional design and
construction support for many of Central
San's projects. Projects typically use CAD to
produce drawings.
2. For the design of large and complex
Treatment Plant projects, consultants are
using 3D (dimensional) laser scanning and
BIM workflow to dynamically manage the
project lifecycle in 3D (geometry), 4D
(schedule), and 5D (budget) using multiple
consultants.
3. BIM has already been used on several
Treatment Plant projects.
_ -
Electrical Design 2D and 3D
for Solids Handlinq Buildinq
CURRENT AS -BUILT PROGRAM
• On June 22, 2020, Engineering and Operations Committee received
an update on Central San's As -Built Drawings Program
--
• Current As -Built Program is to work on establishing CAD Standards:
• Setting minimum requirements for CAD drawings prepared by consultants
that will be used in Central San's contracts
• Establishing 3D and BIM Standards
• Software: Revit BIM 3D Model and AutoCAD Civil 3D
• Applies to all drawings prepared by individual project designer, general
contractor, subcontractors, and vendors
• Laser scanning existing buildings and facilities
• Developing 3D (x-y-z), 4D (scheduling), 5D (cost), and 6D (asset management)
• Intent of these CAD/BIM Standards is to assure consistency in drawing
production and uniformity in file structure for all drawings
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 19 of 29 2
Page 6 of 9
OBJECTIVE OF CAD AND BIM STANDARDS
DEVELOPMENT AND AS -NEEDED PROJECT
1. Develop CAD and BIM Standards Manual to provide consistency in
project submittal deliverables;
2. Develop BIM Execution Plan to provide a foundational framework for
multiple consultants to use to ensure successful BIM deployment;
3. Develop Standard Details, Templates, Libraries, and Resource Files;
and
4. Provide As -Needed support to upcoming capital projects within the
Capital Improvement Plan.
ROADMAP BASED ON STANDARDS THAT
WILL BE DEVELOPED
Integrated Approach to Documenting, Visualizing, Managing and Maintaining Assets are rooted in Standards
�r !ra-vegROrf J.rign �od>t werl vrJ—P, J.i" dvr¢ ur cuni roue ru he u>teef Beyond
.v+�.*_-+zw .A.�,n N,K.,nanr.ri�n.nmx..rrMrarinn. �n� mo,n r.nun..•r�r-wxr,
u"'•O'�� rl ae n.&Mated. eeeGy mree Wr—b-b ed prod .
owwae.u.a,
e on
o...�a.od.b..a.
4 4
.mow. ^t...
■
® MNKT gIKKiL LYWWTA
ApYMR1i /PTOPOORtKY
Dn.bv srErwtron wn
9111 b.M.IW WnW - -.---
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 20 of 29 3
Hazen
CAD a ad RIM Sraadards
Development and AsZeeded
CAP and RIM Service.
Hazen & Sawyer
Task 1:Engage
Stakeholders
as 2: Develop CAD
Standards Manual
Task 3: Develop CAD
Templates, Standard
Details, Library, and
as 4: Develop BIM
Resource Files
Execution Plan and
BIM Standards
Manual
Task 5: Develop 3D
Templates, Details,
and Resource Files
as 6: Provide Support
on As -Needed Basis
Stantec
CAD and INK standards
DaValopwAnt and As NDadad
GAD and BIN Se IV Ica
OF
Task 6: Provide
Support on As -
Needed Basis
Page 8 of 9
BOARD ALTERNATIVES
• Alternative 1: Consolidate the work into one agreement, which is not recommended. Both
consultants will equally split the as -needed scope of work to assist with CAD and BIM drawings and
having two consultants potentially available allows for flexibility when urgent or immediate work is
needed.
• Alternative 2: Status Quo - Do Nothing Alternative. The Board to direct staff to continue current and
past practice without CAD and BIM Standards and without BIM Execution Plans for upcoming projects
under the Ten -Year Capital Improvement Plan, which is not recommended
• Alternative 3: Conduct CAD/BIM Standards and hire Central San staff. The technology used today for
more complex project and asset management systems include the CAD/BIM Standards that staff is
recommending at a cost of $250,000. The as -needed support can be performed in house if new or
repurposed positions are created. At least one additional full-time position would be required.
However, staff is not requesting to hire a permanent position at this time.
RECOMMENDED BOARD ACTION
• Authorize the General Manager to execute two professional engineering services
agreements with a five-year term with 1) Hazen & Sawyer, Inc. in an amount not to
exceed $750,000; and 2) Stantec in an amount not to exceed $500,000, to provide as -
needed CAD/BIM services for Central San projects.
November 9, 2021 EOPS Regular Committee Meeting Agenda Packet - Page 22 of 29 5
Page 9 of 9
QUESTIONS?