HomeMy WebLinkAbout00.a. (Handout) Written Public Comment provided during meeting Public Comments
(Handout)
10-07-21
October 6,2021
To:Central San Directors: S. Morgan, C. Lauritzen,Angela Lowrey, D. Morrow, P.Zirkle
From: Vincent and Janet Maiorana
We built our home 55 years ago,and paid a fee to attach to the Central San Main in our back yard. Our
lateral connecting to the Main is 30' long. There is adequate gravity flow from the lateral to the Main as
we have never had a sewage blockage.
We never imagined that in 2021,our main would be removed, and we would have to take on the
responsibility of maintaining some 170'of new lateral with no natural gravity flow. Our home is much
lower than the road where the new Main is being installed.
We are greatly stressed worrying about what will happen if Central San calculations are not correct, and
in future years we have a problem with sewage blockage over time.
We should not now have the responsibility of maintaining the new proposed lateral or installing a pump
or doing whatever is necessary to achieve adequate gravity flow because Central San decides to change
our system which has worked perfectly for 55 years.
We hope Central San will assume the responsibility for the new lateral.
Thank you in advance for your attention to this problem which is monumental for us.
23 Lost Valley Drive
Orinda,CA 94563
(925) 376-3931