Item 11.
CENTRAL SAN BOARD OF DIRECTORS
POSITION PAPER
MEETING DATE: OCTOBER 7, 2021
SUBJECT: CONDUCTA PUBLIC HEARING TO RECEIVE PUBLIC COMMENT ON
ADOPTING PROPOSED ORDINANCE NO. 318 (UNCODIFIED) TO
ESTABLISH A REIMBURSEMENT FEE APPLICABLE TO PARCELS WHICH
COULD CONNECT TO JOB 6712 ON LA SONOMA WAY I N ALAMO
SUBMITTED BY: INITIATING DEPARTMENT:
THOMAS BRIGHTBILL, SENIOR ENGINEER ENGINEERING AND TECHNICAL SERVICES-
PDS-RATES AND FEES
REVIEWED BY: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
Roger S. Bailey
General Manager
ISSUE
District Code requires a public hearing prior to the Board of Directors (Board) setting a reimbursement fee
for parcels which could be connected to an eligible sewer installed by a private party.
BACKGROUND
Job 6712 consists of approximately 150 linear feet of 1.5-inch diameter sewer main and appurtenances
conforming to Central San Standard Specifications Section 33 31 26 for Multiple-User Low Pressure
Sewer Systems (MULPSS). The project is located on La Sonoma Way in Alamo. This job is a "standard
facility" as defined in the District Code. District Code Section 6.20.010.1 defines "standard facilities" as
"public main, local street and collector sewers installed using conventional construction techniques, and
ordinary appurtenances to such public sewers, such as manholes and rodding inlets."
To fairly and equitably distribute the cost for these facilities, District Code provides for the installer to be
reimbursed for the proportion of cost allocatable to other properties which connect to the sewers within 20
October 7, 2021 Regular Board Meeting Agenda Packet- Page 126 of 200
Page 2 of 7
years of project acceptance by Central San. Staff has drafted a proposed Ordinance (Attachment 1)to
establish a reimbursement fee for properties that connect to the public sewer installed under this project.
Exhibit A shows the location of the project and the properties that could connect to the project sewer. The
proposed reimbursement fee will be collected from property owners if, and when, they connect their
properties to the sewer system. The collected fee will be held in a separate account, and will be disbursed
to the installer of the project. Calculation of the proposed reimbursement fee is summarized in Exhibit B.
The fees would be charged in addition to Capacity Fees and other Central San charges, such as those for
permits, inspection, and sewer service.
District Code requires that reimbursement fees be adjusted at least annually to account for the increase or
decrease in value of the facilities due to inflation and depreciation. These fees may also be adjusted to
account for differences between estimated and actual costs, and increases or decreases in the number of
connections that may connect to the facilities. However, once a particular property has connected to the
public sewer and the fees have been paid, Central San will not collect any additional reimbursement fees
for that connection, nor refund any excess reimbursement fees which might otherwise be generated by
future adjustments.
Appropriate notices have been posted and published in the Contra Costa Times and the San Ramon
Valley Times. In addition, individual letter notices were mailed to the owners of all affected properties, as
required by District Code.
ALTERNATIVES/CONSIDERATIONS
The Board could continue the public hearing to a future date.
The Board could decline to hold the public hearing and decline to set the reimbursement fee. This is not
recommended as the applicant has met the conditions for establishing a reimbursement fee contained in
District Code Chapter 6.20.
The Board could direct the General Manager to set the reimbursement fee at a different amount. This is
not recommended as staff has reviewed the eligible project costs and the number of parcels which could
reasonably connect to the project as described in District Code Section 6.20.040 and has calculated the
proposed reimbursement fee in conformance with District Code.
FINANCIAL IMPACTS
None related to this action.
COMMITTEE RECOMMENDATION
The Finance Committee reviewed this matter at its meeting on August 24, 2021 and recommended
holding the public hearing.
RECOMMENDED BOARD ACTION
Staff recommends the Board:
1. Conduct a public hearing to receive comments on the proposed Ordinance (uncodified)to establish
reimbursement fees for parcels which could be connected to the Job 6712 sewer; and
2. Adopt the proposed uncodified Ordinance.
October 7, 2021 Regular Board Meeting Agenda Packet- Page 127 of 200
Page 3 of 7
Strategic Plan Tie-In
GOAL ONE: Customer and Community
Strategy 1—Deliver high-quality customer service
ATTACHMENTS:
1. Proposed Ordinance
2. Ordinance Exhibit Site Map
3. Ordinance Exhibit B Fee Calculation
October 7, 2021 Regular Board Meeting Agenda Packet- Page 128 of 200
Page 4 of 7
ATTACHMENT 1
ORDINANCE NO. 318
AN ORDINANCE (UNCODIFIED) TO ESTABLISH A REIMBURSEMENT FEE
APPLICABLE TO PROPERTIES THAT CONNECT TO
JOB 6712 (LA SONOMA WAY, ALAMO) STANDARD SEWER FACILITIES
WHEREAS, the Central Contra Costa Sanitary District (Central San) Code Chapter 6.20
provides for reimbursement to installers of standard and special facilities from fees charged
property owners when they apply to connect their property to the public sewer system; and
WHEREAS, District Code Chapter 6.20 provides for the establishment of reimbursement
accounts for constructed standard and special facilities; and
WHEREAS, Job 6712 sewers, the location of which is shown in Exhibit A of this Ordinance,
incorporated in full herein by this reference, are standard facilities as defined in District Code
Chapter 6.20; and
WHEREAS, reimbursement fees have been calculated by the method specified in District
Code Chapter 6.20, which calculations are summarized in Exhibit B of this Ordinance,
incorporated in full herein by this reference; and
WHEREAS, a properly noticed public hearing to receive comments on the proposed
reimbursement fee was conducted at the Central San Board of Directors regularly scheduled
meeting on October 7, 2021.
NOW, THEREFORE, the Board of Directors of the Central San does ordain as follows:
Section 1
The reimbursement fees applicable to properties that connect to Job 6712 standard
facilities, designated in Exhibit A are hereby established.
Said reimbursement fees have been calculated in the manner required by District
Code Chapter 6.20, as set forth in Exhibit B of this Ordinance.
Section 2
The reimbursement fees set forth in Exhibit B of this Ordinance shall be administered,
adjusted, and collected according to the provisions of District Code Chapter 6.20.
Section 3
Exhibits A and B hereto shall be maintained in the office of the Secretary of the District
and made available for inspection during the periods when the subject reimbursement
fee is in effect.
October 7, 2021 Regular Board Meeting Agenda Packet- Page 129 of 200
Page 5 of 7
Central Contra Costa Sanitary District
Ordinance No. 318
Page 2 of 2
Section 4
This Ordinance shall be a general regulation of Central San and shall be published
once in the Contra Costa Times, a newspaper of general circulation within the District,
and shall be effective on the eighth calendar day following such publication.
PASSED AND ADOPTED by the Board of Directors of the Central Contra Costa Sanitary
District on the 7t" day of October 2021, by the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
Tad J. Pilecki
President of the Board of Directors,
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED
Katie Young
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to Form:
Kenton L. Alm
Counsel for the District
October 7, 2021 Regular Board Meeting Agenda Packet- Page 130 of 200
ATTACHMENT 2
fr`' L 241 LA SERENA 36 LA
SER J y 11 AVE 135 LA SONOMA CT
251 LA 4F 3 140 LA SON DMA WAY
M9 SERENA AVE SONOMA WAY
7
261 LA 144 LA
SERENA AVE SONOMA WAY
141 LA
271 LA SONOMA WAY
SERENA AVE
133
LA SONOMA
152 LA WAY
SONOMA WAY
148 LA
SONOMA WAY
281 LA
SERE 'AVE F550 149 L4
Q] 2 SONOMA WAY
C) M49
5
55 HOLIDAY DR
157 LA
156 LA SONOMA WAY
SONOMA WAY
65 HOLIDAY DR 4
4
�.o
75 HOLIDAY DR 160 LA
165 LA
SONOMA WAY
SONOMA WAY
164 LA
SONOMA WAY
6�
.f
168 LASONOMA WA
,ej 10ENTRAL SAN 0 50 100 Feet
N
Page 7 of 7
ATTACHMENT 3
Exhibit B
Reimbursement Fee Calculation
Job 6712
La Sonoma Way, Alamo
Standard Facility Reimbursement Costs:
Construction $ 35,235.00
Engineering 9,285.00
Central San Fees 7,479.60
Total $ 51,999.60
Number of Potential Connections to the Standard Facility:
3 Parcels
Standard Facility Reimbursement Fee per Parcel:
$51,999.60 / 3 Parcels = $17,333.20 per Parcel
Properties to which Standard Facility Reimbursement Fee may apply:
Assessor's Number of Installer- Fee Potential
Address Parcel Number Parcels Owned Waived Fees
(APN)
148 La Sonoma Way 198-111-014 1 Yes N/A No
152 La Sonoma Way 198-111-041 1 No No Yes
156 La Sonoma Way 198-111-015 1 No No Yes
Total 3 2