HomeMy WebLinkAbout05.d. (Handout) Scenario Schematics Item 5.d. - (Handout) 4. IMPROVE EXISTING CONCORD —-- INDUSTRIAL PUMP STATIONr �` xfoHwa (PER CCCSD ALTERNATIVE 1) Y 4 Ae g�TBs A`E— —v LEGEND EX 12 SS r00, �— PROPOSED SANITARY SEWER PIPELINE EVO�WONHIGHWAY 4 POTENTIAL INTERIM — POTENTIAL OFFSITE SANITARY SEWER �� IMPROVEMENTS (NEW, UPSIZE OR REPLACE) CONNECTION t PROPOSED SEWER FORCEMAIN A�R ��c 4vo�� PROPOSED CONNECTION TO EXISTING EXISTING SANITARY SEWER PIPELINE CCCSD WASTEWATER s � � Ex �9 �0 I — — — — EXISTING SEWER SERVICE TREATMENT PLANT ,9 S . ` I AREA BOUNDARY INTERIM BART PS QtiK toco ss s -7 COAST �. 9 T1 GUARD" , o ' I u) n 03 x \ cr) N S �0 V A CONCORD BOULEVARD 27 � �0�� a/) DATE: DECEMBER 5,2017 SCALE: 1"=2,500' FIGURE 2 Carlson,Barbee&Gibson,Inc. SCHEMATIC WASTEWATER SYSTEM - CCCSD & CITY SCENARIO CIVIL ENGINEERS-SURVEYOR S•PLANNERS waw.cbantlg.wm SAN RAMON,CALIFORNIA (925)886-0322 CONCORD REUSE PROJECT SACRAMENTO, CALIFORNIA (918)3]5-13]] Page 44 of CITY OF CONCORD CONTRA COSTA COUNTY CALIFORNIA IMPROVE EXISTING CONCORD _ INDUSTRIAL PUMP STATION - xlcHw (PER CCCSD ALTERNATIVE 1) r AY 4 xoAD ♦ - LEGEND 12 SS r EX PROPOSED SANITARY SEWER PIPELINE EVORA ROAD HIGHWAY 4 POTENTIAL OFFSITE SANITARY SEWER IMPROVEMENTS (NEW, UPSIZE OR REPLACE) CO r PROPOSED SEWER FORCEMAIN PROPOSED CONNECTION TO EXISTING EXISTING SANITARY SEWER PIPELINE CCCSD WASTEWATER EX 39 S ♦ �� I — — — — EXISTING SEWER SERVICE TREATMENT PLANT - I AREA BOUNDARY U ♦ BARTI C0 ♦♦ O /, ` EX 24 S 04- �T D G I s � X ss / e ss � ♦ / Q� � TCOAST ^ ♦ ♦ / \'; x j GUARD'00 , o ■ ' I / Ln P • �1�� PS00 I rn Cf) rn WON \/� CONCORD BOULEVARD �JS • DATE: DECEMBER 5,2017 SCALE: 1"=2,500' FIGURE 3 Carlson,Barbee&Gibson,Inc. SCHEMATIC WASTEWATER SYSTEM - CCCSD ONLY SCENARIO CIVIL ENGINEERS-SURVEYOR S•PLANNERS _,b,ndg.wm SAN RAMON,CALIFORNIA (925)866-0322 CONCORD REUSE PROJECT SACRAMENTO. CALIFORNIA (916)3]5-18]] Page 45 of CITY OF CONCORD CONTRA COSTA COUNTY CALIFORNIA K