Loading...
HomeMy WebLinkAbout05.c. Receive update on Recycled Water Quality Order requiring quaterly site inspections Page 1 of 7 Item 5.c. CENTRAL SAN September 13, 2021 TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE FROM: RICHARD FOSS, ASSOCIATE ENGINEER REVIEWED BY: DAN FROST, SENIOR ENGINEER DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERINGAND TECHNICAL SERVICES SUBJECT: RECEIVE UPDATE ON RECYCLED WATER QUALITY ORDER REQUIRING QUARTERLYSITE INSPECTIONS Staff will review the attached presentation regarding the new recycled water quality order that requires quarterly inspections and be available to answer any questions. Strategic Plan re-In GOAL TWO: Environmental Stewardship Strategy 1—Achieve 100% compliance in all regulations, Strategy 3— Support regional development of local water supply ATTACHMENTS: 1. Presentation September 13, 2021 REEP Committee Meeting Agenda Packet- Page 29 of 43 Page 2 of 7 s-W UPDATE ON RECYCLED WATER QUALITY ORDER: NEW QUARTERLY SITE INSPECTION - ' REQUIREMENT Real Estate, Environmental & Planning Committee September 13, 2021 Richard Foss Associate Engineer � l OLD STATE ORDER "S 0".CALMMA-C A AGENCY ME7E WlLSpN a vem CALIFOkNU REGIONAL WATER QUALITY CONTROL BOARD SAN FRANCISCO BAY REGION 1101 VJebSler SIM&L SUb 500 'And,CA 94612 (510)286.1266 .d(- (5t0128fr1380 995: (61012"04 LSTILR OF APPROVAL WATER REUSE PROGRAM ORDER 96-011 GENERAL WATER REUSE REQUIREMENTS AGENCY Lute: May 9,}997 Address: Central Contra Costa Sanitary District(CCCSD) rile:2159.5015(WC) VAC1LITY(s): CCCSD Wastewater Ijeatment Plant Lffective Pate of Approval:May 9,1997 We have reviewed the following Notice of Intent(NO[)documents Submitted pursuant to Regional 0oard General Watat Reuse Order 96.011, 1. Cunent Water Reuse program,September 12,1996 - 2. CC,CS(YS Zone One-Pleasant Hill Recycled Water project,Nowmber 13,1996 E 2 - CENTRAL SAN �. 1 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 30 of 43 Page 3 of 7 OLD STATE ORDER REQUIRED ANNUAL INSPECTIONS Table 1: Producer's 5cbedule Sam ling&Anal ses kollection System TYPE OF SAMPLE Grab tont obs. obs. Operations(CSO)staff Flow Rate altorlslde D D` D, performed one annual inspection that took Total Coliform MPN1100m1 D—M approximately two weeks 7urbidit NTU) D••/M to schedule,meet,and complete with site mssol>red o en(mg/1) 31Wr• I supervisors. Dig.Sulfides Unall) if DO<1m fI31w•• ! 1 A L Stand.Obsawatlons A— A'•` LEGEND FOR TABLE t Type of Sampie sampling Frequency Grab.truUnfaneous grab sartlole D.Daily Cont-Continuous manitoring(recorder) gfW-Three dent per week obs..orbs ztlon A.Annually ' Records of tecyckd water tae at uch site may be tornpikd from billing period readings (3rrided by number of days so obtain dally slow)and submlud with the annual report '- E4ulvalesl routine effk-K(NPDfSIWDR)monitoring data cokacd on days and during time (grab samples)recycled water h bring produced ran be submitted In fulflilmenl of these racp*emenls. User OM to be Wttpaned a mlrawrr n of annually for'Appliub4 Standard Observaticns"hued ors the sac and compicAty d each aIle In accordance sfth the Producer's Water Reuse Program. a UhJeu current NPDES or lSrDR sampling Itequency h kss Turbidity would apply to tenlary water � 3 m*and is based on■2�Jhotw c t. le. CENTRALSAN NEW STATE ORDER EFFECTIVE APRIL 8, 2020 oau".Ew�� JA"so BwwsNrsso Water BoardsA°'""Y`°" San Francisco Bay Regional Water Quality Control Board NOTICE OF APPLICABILITY WATER QUALITY ORDER 2016-0068-DDW GENERAL WATER RECLAMATION REQUIREMENTS FOR RECYCLED WATER USE CENTRALSAN 2 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 31 of 43 Page 4 of 7 NEW STATE ORDER REQUIRES QUARTERLY SITE INSPECTIONS Region 2 Recycled Water Administrators April 8,2020 Monitoring and Reporting Program Table 4: Use Area Monitoring and Reporting Requirements Parameter Units Sample Type Sampling Reporting Frequencyre� Frequency Recycled Water User Annually Recycled Water Flow doh} Meter{" Monthly Annually Acreage A lieO) Acres Calculated Annually Application Rate incheeslaacrel Calculated Annually Soil SaturationWonding Observation Quarterly Annually Nuisance OdorslVectors Observation Quarterly Annually Discharge Off-Site Observation Quarterly Annually Notification Signsr'� Observation Quarterly Rnnually CENTRALSAN TRANSITION FROM ANNUAL TO QUARTERLY SITE INSPECTIONS • Staff reviewed other California agencies' inspection programs and found that some nearby agencies are already requiring their recycled water customers to perform self-inspections and reporting. • Multiple platforms were explored, and Microsoft Forms was determined to be the easiest for customers and staff. This interactive form allows customers to submit their compliance with State recycled water requirements every quarter. • Self-monitoring report questions were modeled from examples and input staff obtained from other California agencies serving recycled water. The compliance requirements are not new, and the questions asked on the form are similar to questions asked and observations made in person inspections performed by CSO. • Central San's website was updated with the new reporting requirements including a link to the new reporting form. 6 CENTRALSAN 3 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 32 of 43 Page 5 of 7 SELF-MONITORING QUARTERLY REPORT FORM Quarter 2:April 1,2021-June 30"20Z 1 nr,a.wr a.mm«..wn m�rc•vr M«..P.n.•.w'.min e.._.a wr m-m.. 1-ppo the r,rr• s.-itmenwmhewuon e�l metered site: w<.ue.a.w•e.rr.nrrm•r�..m�o<.a.r 29id yo.r ol•se recycled water,unolt from the site? Fs C]w. p u. rf r,W. W UPDATED CENTRAL SAN WEBSITE 4 C 0 reniralsan.org;pod/recycled-water-sett-monitoring-quarterly-mparts ppz II Central Portal Q Central San COVIN-... 0 San Central 0 Time Card 0 EOSDISW.,Id,,,. ®G-panel i Miro % Mannino .gLSII CENTRAL SAN CE47RAL CONTRA COSTA SANITARY DISTRICT Recycled Water Self-Monitoring Quarterly Reports T comply with new Cal lornia monitoring and reporting requirements,Central San is mquidng all customem to submit Quarterly Self-Wnitor ng Reports for each of the follow ng designated quarters: • Quarter 1: January 1-March 31 • Quarter 2i April 1-June 30 Submit Report By July 15,2021 • Quarter 3: July 1-September 30 • Quarter 4: OctoberI-December 31 All cusrom m must complete he online Quarterly Self Mon for ng Reports within o calendar weeks folbwing the qua ler end in order to maintain continued recycled water service. 151 View Sell Mon acing Questions READY NO REPORT? 1 8 CENTRAL SAN 4 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 33 of 43 Page 6 of 7 CUSTOMER TRAINING FOR QUARTERLY SELF-MONITORING SITE INSPECTION • Extensive customer outreach was conducted in Quarter 4 of 2020 to inform customers of the new requirement, and to test and familiarize customers with the self-monitoring report form. • 26 out of 51 customer sites submitted the report during the test quarter. • Site supervisors receive an email reminder at the end of each quarter with instructions on completing the report. Staff follow-up via email and phone calls to customers as-needed to ensure full compliance is met. • Site visits will be conducted as-needed if the customer doesn't report after multiple reminders or if the customer has special requirements (e.g., replacement signs, address major leaks, etc.). CENTRALSAN FIRST CALENDAR YEAR PROGRESS • Customers take less than 10 minutes to fill out the form to report their site's compliance. • Summary of 2021 Calendar Year, Quarter 1: 0 49 out of 51 customer sites reported on time, remainder reported five days late. o Three site supervisors changed and needed training. o A few sites needed new signs and valve tags. • Summary of 2021 Calendar Year, Quarter 2: 0 43 out of 51 customer sites reported on time, five customers reported four days late. o One contact responsible for three sites said they will report S oon. o A few sites needed follow-up to clarify irrigation system modifications/repairs. 10 CENTRALSAN _= 5 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 34 of 43 Page 7 of 7 MOVING FORWARD • CSO staff will conduct one in-person inspection a year: • Verify site compliance. • Maintain site familiarity. • Communication with site supervisors. • All inspection results will be tallied and included in the Recycled Water Annual Report. • It appears that the self-monitoring approach is working. I L. k. CENTRAL SAN JSP= 6 September 13, 2021 REEP Committee Meeting Agenda Packet- Page 35 of 43