Loading...
HomeMy WebLinkAbout12.a. (Handout) Additional Written Announcements Item 12.a. (Handout) Board Meeting of July 15, 2021 General Manager Additional Written Announcements SOLAR PANEL ARRAY PROJECT 5) Public Review of Initial Study / Mitigated Negative Declaration Underway Staff has begun a 30-day public review period for Central San's proposed Solar Panel Array Project Initial Study/Mitigated Negative Declaration. The project proposes construction and operation of a 1.75 megawatt solar panel array on approximately 8.2 acres of a 48-acre parcel already owned by Central San, referred to as the "Lagiss parcel." The public review period is July 13 through August 13, 2021. A public hearing for this project is expected to be held by the Board on September 2. Following the public hearing, the Board will consider approval of the Mitigated Negative Declaration and the proposed project. A copy of the Notice of Intent to adopt a Mitigated Negative Declaration and the proposed Mitigated Negative Declaration are posted at www.centralsan.org/solar. Copies of the notice have also been mailed to local agencies, Blum Road-area residents and will be published as a legal notice in the Contra Costa Times and San Ramon Valley Times circulation. HUMAN RESOURCES (new staff addition) 6) Central San Welcomes New Staff Engineer Parker Ewing Parker Ewing recently joined the Capital Projects Division on July 12 as a Staff Engineer. He has graduated from San Francisco State University in 2020 with a B.S. in Civil Engineering. Parker's career at Central San began as an intern from January — June 2021 in Capital Projects. He has experience working in the District's Collection System design and construction group. As a Staff Engineer, he will be working on the design and construction of Treatment Plant projects, including the Contractor Staging Area and Influent Pump Electrical Improvements projects. Capital Projects is pleased to have Parker join their team.