SUBJECT: ANNOUNCEMENTS - JUNE 17, 2021
Attached are the announcements for the above meeting.
ATTACHMENTS:
1. General Manager Written Announcements
2. Energy Usage - March 2021
June 17, 2021 Regular Board Meeting Agenda Packet- Page 144 of 168
Page 2 of 3
Attachment 1
Board Meeting of June 17, 2021
General Manager Written Announcements
HUMAN RESOURCES
1) Central San Welcomes New Staff Engineer Ruben Herrera
Ruben Herrera is the newest member of the Capital Projects Division as a Staff Engineer.
Ruben joined the District on June 1, 2021. He graduated from California Polytechnic
University with a degree in Civil Engineering. For the past seven years, Ruben has
worked as a project engineer on the construction of large water infrastructure projects for
San Diego Water Authority, Metropolitan Water District, and, most recently, Silicon Valley
Clean Water. His strong construction background is a great asset for the Division with the
number and size of projects to be built over the coming years. Ruben looks forward to
contributing to the engineering team and his future with Central San.
ENERGY CONSUMPTION
2) First Quarter Update on Central San's Energy Usage
Central San actively tracks greenhouse (GHG) emissions to optimize the use of energy at
its facilities in the most cost-effective and environmentally responsible manner. The
attached energy dashboard contains a breakdown of Central San's energy usage for the
month of March 2021 along with a comparison of the energy used during the first quarter
of the calendar year. The chart shows the cost breakdown of Pacific Gas and Electric and
Marin Clean Energy electricity.
June 17, 2021 Regular Board Meeting Agenda Packet- Page 145 of 168
Page 3 of 3
CCCSD March 2021 Energy Usage Attachment
HHWCF(Solar) Treatment Plant Monthly Total Energy Cost: $364,847
HHWCF(Gas and $744 g6%of Total$
Electricity)$253 0% 0%
POD Reserv.&Serv. 330/MG Treated
Charges(PG&E) POD Demand
Misc(Gas and $27,3179% Charge(MCE)$- 1,836 kWh/MG Treated
Electricity)$1,989 0%
1%
POD Electricity CSO Solar,
import(MCE) $4,642,48% CSO Facility
$17,569 5% 3%of Total$
CSO Electricity, CSO Gas,
$909,10% $3,190,33%
rOD
$108,055
CSO Vehicle
PG&E Charges Bay Electricity, CSO Vehicle
(trans.+dist.+etc. $574,6% Bay Gas,$327
minus Reserv.& ,3%
Serv.Charges)
$54,374 Pump Stations
17% 11%of Total$
_ San Ramon,$10,945, Moraga,$8,763,
27% 22%
POD Landfill Gas
•O $33,863 12 Other Pump Stations,
Tran ,ss11% $1,726,4%
sr
Orinda Crossroads,
Concord Industrial, $6,736,17%
23% $1,117,3%
Fairview Lift Station, Lower Orinda,
$1,699,4% $4,776,12%
Maltby,$1,794,4% Martinez,$2,913,7%
Operating Cost of CCCSD by Month TP Electricity Source in kWh TP MMBTU of Gas Consumed
$400,000 2,500 SO
$364,847 45
$350,000
$306 544 $304,359 $294,099 2,000 40
$300,000
m 11
35
$250,000 1,500 2 30
9
$200,00025
'o
$150,000 r 1,000 H'0 20
15
$100,000 500 10
$50,000 5
$0 0 0
Dec-20 Jan-21 Feb-21 Mar-21 Dec-20 Jan-21 Feb-21 Mar-21 Dec-20 Jan-21 Feb-21 Mar-21
■PG&E Charges ■POD Reserv.&Serv.Charges ■Natural Gas ■Landfill Gas
■MCE Demand Charge ■Other Energy Charges ■Cogen ■Standby Power ■PG&E
■POD Landfill Gas ■Natural Gas Delivery
■POD Natural Gas
TP Electricity by Source in kWh TP MMBTU of Gas Consumed TP Energy by Source in kWh
30 600 100 693 2.05
90
25 500 80
70
20 400
60
Y 15 300 x 50
o
1. t3 40 — _ —
30"29.5829.1010 200 28.26
0.45 205 100
10
6.92
0 0 0
2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021
Year Year
Year ■Aux Boilers WHBSteam ■Cogen Steam
■Cogen ■Standby Power ■PG&E ■Natural Gas ■Landfill Gas ■Cogen Electrical ■Standby Power ■PG&E
This month CCCSD produced and purchased electricity at an average rate of $0.1255 /kWh(including maintenance)
Anthropogenic GHG
Emissions Renewable Energy Landfill Gas Compared to $0,1583 /kWh if exclusively from PG&E
MT CO2e Profile 6,601 MMBtu
14%
25000
Recovered Waste Heat Generation breaks even with PG&E at $7.99 /MMBTU
20000 5,510 MMBtu
Adi�� 12% Natural gas was purchased at
ls000 solar a rate of $3.26 /MMBTU
84 MMBtu eq.
0.18%
8 10000 Total Non-Renewab
5,650 34,562 MMBtu l as transmission cost $
MCE Renewables Natural g 2.15 /MMBTU
5000 656 MMBtu eq.
1.38%
0
CCCSD produces steam at
an average rate of $0.0032 /Ib steam
June 17, 2021 Regular Board Meeting Agenda Packet- Page 146 of 168