Loading...
HomeMy WebLinkAbout01. (Handout) Filter Plant Facility Tour Elements Item 1. (Handout) FILTER PLANT AND CLEARWELL IMPROVEMENTS, PHASE 1A DISTRICT PROJECT 7361 PROJECT SITE TOUR - Special Board Meeting June 8, 2021 Jean-Marc Petit, P.E. Director of Engineering and Technical Services a Edgar J. Lopez, P.E. Capital Projects Division Manager 1 PHASE 1A SCOPE FOR RECYCLED WATER PLANT FACILITIES IMPROVEMENTS Replace Backwash Motors (480V) Recvcled Water Storage: - o Replace East Cleamail with two new above , ground storage tanks - �'• ' (steel or pre-stressed concrete) - ..i • Clearwell Overflow Structure Modifications wti Rehabilitation one Filter • (#3)and Mechanical/ 1 Instrumentations on others _ Upgrade Chemical Feed _ l •� _ Upgrade/Replace Electrical Gear f New Recycled Pump Station • Applied Water Pumper Electrical Facility Station(AWPS) Replace Substation 40-2400V • Replace Variable Frequency Drives for AWPS r 2 CENTRAL SAN �.; 2 1 TOUR ROUTE AND FEATURES 4 ` t - a i - s 3 2 r► 1 r� 6IMOOMY2` 13 3 TOUR HIGHLIGHTS AND FEATURES Stop Number Location Main Features Top of Southern Clearwell West Clearwell with Floating Cover vs.New Steel Storage 1 Berm under Construction Construction Site Storage Construction of the two new welded steel storage tanks,3- 2 Tanks Million-gallon capacity each Top of Northern Clearwell Overview of Basins B and C and Recycled Water Pump 3 Berm Stations and Backwash Pumps 4 Northwest corner of Overview of northern most boundary of Central San Site Basin B and Basin B and C.Overview of new berm for flood control 5 Diversion Structure Alternate outfall used during Outfall Pipe Maintenance Overview of filter plant including filter pipe gallery,filters, 6 Filter Plant electrical room and Forebays Il 4 4 2 QUESTIONS 5 3