HomeMy WebLinkAbout04.a. Review draft Position Paper to adopt (1) Resolution of Intention No. 2021- to initiate the formation of the Cordell Drive West Contractual Assessment District (CAD) No. 2021-1 for the purpose of installing sewer improvements on Cordell Drive in Page 1 of 10
Item 4.a.
CENTRAL SAN BOARD OF DIRECTORS
. , , .
POSITION PAPER
. , 0
DRAFT
MEETING DATE: MARCH 30, 2021
SUBJECT: REVIEW DRAFT POSITION PAPER TO ADOPT (1) RESOLUTION
OF INTENTION NO. 2021- TO INITIATE THE FORMATION OF THE
CORDELL DRIVE WEST CONTRACTUAL ASSESSMENT DISTRICT
(CAD) NO. 2021-1 FOR THE PURPOSE OF INSTALLING SEWER
IMPROVEMENTS ON CORDELL DRIVE IN DANVILLE;
AND (2) RESOLUTION NO. 2021- APPROVING THE BOUNDARY FOR
THE PROPOSED CAD
SUBMITTED BY: INITIATING DEPARTMENT:
RUSSELL LEAVITT, ENGINEERING ENGINEERING AND TECHNICAL SERVICES-
ASSISTANT III PDS-RESOURCE RECOVERY
REVIEWED BY: STEPHANIE GRONLUND, ASSOCIATE ENGINEER
MELODY LABELLA, RESOURCE RECOVERY PROGRAM MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ISSUE
Approval of a Resolution of Intention by the Board of Directors (Board) is required as the first step in the
formation of a CAD.
BACKGROUND
Owners of properties along Cordell Drive in Danville have expressed an interest in forming a CAD in
order to design and construct an approximately 516-foot extension of the public sewer system to serve
their properties. The location and boundary of the proposed Cordell West CAD is shown on Attachment
1. The location of the previously approved and completed Cordell Drive CAD 2017-1 sewer project is
also shown.
The CAD Formation Process
The following Board actions are required to create a CAD:
• First Board Meeting — The Board passes a Resolution of Intention to form the CAD and approves
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 3 of 23
Page 2 of 10
a CAD boundary map.
Following the passage of the Resolution of Intention, the participating property owners work with their
engineer to complete improvement plans and secure bids to construct the project.
Central San staff prepares an Engineer's Report. Staff also prepares and mails notices and ballots
to owners of all parcels which can connect to the project. Under State Law, the CAD is a voluntary
agreement which is not subject to Proposition 218; Central San's policy and procedure is to follow
the notification and balloting process described in Proposition 218 to the extent possible.
• Second Board Meeting —A public hearing is held to receive input and comments. Following the
public hearing, ballots are tabulated. If there is sufficient property owner support, the Board may
approve the Engineer's Report, approve the assessments, and order the construction of the
improvements.
Following the order to construct the improvements, the participating property owners retain a
contractor to construct the sewer improvements.
Central San inspects the construction of the sewer improvements to confirm that the construction
conforms to Central San's Standards and Specifications.
• Third Board Meeting — The Board approves the final assessment amounts and the levy of the
assessments.
Key Features of the CAD Program
The following are key features of the CAD program:
1. The CAD program creates voluntary assessment districts based on a contractual assessment
process. Participating property owners sign a contract with Central San agreeing to pay back funds
initially provided by Central San to cover the design and construction of the infrastructure.
2. The source of funds to cover the assessment district costs are ad valorem tax revenues which are
deposited each year in Central San's Sewer Construction Fund.
3. Assessment district formation criteria includes the requirement of at least five properties directly
tributary to a proposed CAD facility; a minimum of 60% of those properties having existing homes
served by septic tank systems; no more than two dwellings per Participant Parcel; and persons
owning multiple parcels may finance only one parcel through the CAD. This proposed CAD has
10 directly tributary properties, all homes are on septic and no property has more than two dwellings,
and no persons own more than one parcel. The proposed CAD, therefore, complies with the terms
set forth in the revised Board Policy No. BP 010 - Contractual Assessment Districts, approved at
the February 1, 2018 Board meeting.
4. The obligation to pay assessments are recorded as a lien against the property. Participants are given
the option to pay off their assessment within one month of the assessment being set or are allowed
to amortize the debt through payments on their property tax bills.
5. The amortization period for paying back funds to Central San is 10 years with no interest penalty for
early payoff.
6. The CAD offers financing for the property owners'share of the sewer main extension design and
construction costs, including the portion of a private lateral sewer located in the street. Costs
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 4 of 23
Page 3 of 10
specifically excluded from CAD financing include the cost of installing the lateral sewer on a
participant's property, abandoning an existing septic tank, and Central San's capacity fee and other
fees.
7. CAD participants are responsible for the non-participants'share of the costs of the CAD facilities.
Central San will establish reimbursement fees, which will be collected from non-participant parcels at
the time of connection to the public sewer system. The reimbursement fees will be used to first
reduce the outstanding assessments of the CAD participants, and any remaining reimbursement
fees will be distributed to the CAD participants.
Prior Actions Regarding Cordell Drive West CAD 2019-1
On July 25, 2019, the Central San Board initiated formation of Cordell Drive West CAD 2019-1. Due
to changes in support by the project leadership in the neighborhood, the project went on hold until a
new property owner stepped up and took charge.As a result, the properties to be within the CAD
boundary changed and the Board CAD Policy's 18-month period for completing the project plan
expired. To re-initiate a CAD for this portion of Cordell Drive and restart the plan submittal clock, a new
boundary needs to be established and a replacement CAD needs to be initiated.
CEQA
Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA)
under CEQA Guidelines Section 15061(b)(3), since it can be "seen with certainty that there is no
possibility that the activity in question may have a significant adverse effect on the environment." This
certainty is based on Central San's past experience with numerous sewer construction projects of this
nature, the relatively short distance involved, and the impact-limiting nature of Central San's construction
specifications that would be required of the project.Approval of this project will establish the Board's
independent finding that this project is exempt from CEQA.
ALTERNATIVES/CONSIDERATIONS
Reject or defer initiating formation of the CAD. These actions would halt or delay the CAD proceedings.
FINANCIAL IMPACTS
The CAD program is structured so that the design and construction costs are all paid by the property
owners. There are minor administrative costs for initiating the formation of a CAD. These costs eventually
will be paid by the CAD participants if a CAD is actually formed.
The estimated total costs for this CAD are $175,000.
A new District Project (DP)will be created upon approval of the Resolution of I ntention for this CAD. The
new DP will be funded from the Capital Improvement Budget Program Contingency.
As noted above, the project is still dependent on approval of the participating property owners as outlined
in Board Policy No. 010 - Contractual Assessment District. Upon property owner approval, the engineer's
estimate of proposed construction costs will be submitted to the Board for approval.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this matter at its meeting on March 30, 2021 and
recommended
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 5 of 23
Page 4 of 10
RECOMMENDED BOARD ACTION
Authorize formation of a CAD consisting of nine properties on Cordell Drive West in Danville by:
1. Adopting a Resolution of Intention to initiate the formation of the Cordell Drive West CAD for the
purpose of installing sewer improvements (Attachment 2); and
2. Adopting a resolution approving the boundary of the assessment district (Attachment 3).
Strategic Plan Tie-In
GOAL ONE: Customer and Community
Strategy 1—Deliver high-quality customer service, Strategy 2—Maintain a positive reputation
ATTACHMENTS:
1. Proposed CAD Boundary Map
2. Proposed Resolution of Intention to Initiate CAD Formation
3. Proposed Resolution to Approve Boundary Map
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 6 of 23
Page 5 of 10
Proposed Boundaries of Cordell Drive West
Contractual Assessment District No. 2021 -1 Map Date:3/10/2021
Alamo d oyo. hyo•
s
6Q
Detail
Area'a
Danville '
0
\ e
)cc est to
3�0 3Nti
3
Roberts Ct— 3
o .o
\ �4
— — \ eta.
* Potential Participant
/ O Existing Sewer Structure
Existing Sewer Main
Potential CAD Sewer Main
CAD Area
Note: ,r 0 0 Map Displayed in North American Datum of 1983 Attachment
Central San data as of March,2021. ,. Feet California State Plane,Zone III RIPS 0403,US Feet
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 7 of 23
Page 6 of 10
ATTACHMENT 2
RESOLUTION NO. 2021-
A RESOLUTION OF INTENTION
BY THE CENTRAL CONTRA COSTA SANITARY DISTRICT
TO CREATE CORDELL DRIVE WEST CONTRACTUAL ASSESSMENT DISTRICT
NO. 2021-1 FOR THE PURPOSE OF INSTALLING SEWER IMPROVEMENTS
WHEREAS, the public health and the environment will be best protected by the expansion of the
public sewer system;
WHEREAS, the construction and installation of a sanitary sewer pipeline, together with
appurtenant work and facilities, in areas not presently connected to the sewer system will
facilitate the elimination of potential public health problems due to failing septic systems;
WHEREAS, it would be convenient and advantageous to establish a boundary around an area
within which Central Contra Costa Sanitary District (Central San) and property owners may enter
into contractual assessments and make arrangements to finance public improvements to parcels
which are developed and where the costs and time delays involved in creating an assessment
district pursuant to alternative provisions in the law would be prohibitively large relative to the
cost of the improvement; and
WHEREAS, on July 25, 2019, Board of Directors of Central San (Board) approved a similar
resolution for a Cordell Drive West contractual assessment district (CAD), but the Board CAD
Policy's 18-month period for completing the project plan has expired and the boundary of the
2019 version needed to be revised.
THEREFORE, the Board resolves:
1. This Board intends to approve the following improvements under the authority of
Chapter 29, Contractual Assessment Districts, of the Municipal Improvement Act of
1911, as amended, to wit: construction and installation of approximately 516 linear feet
of sanitary sewer line, together with appurtenant work and facilities located at Cordell
Drive in Danville, California.
2. This Board finds that the parcels within the intended CAD are shown within the
boundaries of the map entitled, "Proposed Boundaries of Cordell Drive West CAD No.
2020-1."
3. This Board intends to levy a special assessment upon participating parcels within the
described CAD in accordance with the special benefit to be received by each parcel of
land, respectively, from the improvements. The improvements proposed will not confer
any special benefit upon any publicly owned land. Hence, there shall be omitted from
special assessment all public streets, alleys, and places and all land belonging to the
United States, the State of California, Contra Costa County, and Central San now in use
in the performance of a public function.
4. Central San intends to provide loan financing for the improvements, subject to the
availability of funds and any limitation on the commitment or expenditure of funds for the
CAD Program as may be established from time to time by the Board. Loans shall be
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 8 of 23
Page 7 of 10
Central Contra Costa Sanitary District
Resolution No. 2021-
Page 2 of 3
repaid by assessments on the property of participating parcel owners. Assessments
shall be paid over a maximum period of ten (10) years with interest at a rate to be fixed
by Central San.
5. The procedure for the collection of assessments will be the placement of assessments on
participating parcel owners' tax bills. The first assessments may be placed on owners'
tax bills in Fiscal Year 2021-22.
6. This Board appoints Stephanie Gronlund, Associate Engineer, as Engineer of Work for
this project to prepare the report required by Section 5898.22 of the Streets and
Highways Code.
7. A public hearing is expected to be held on this matter before the Board on June 17, 2021
at Central San's Offices at 5019 Imhoff Place, Martinez, California. This date is tentative
and may be modified in the future.
8. The Board independently finds that this project is exempt from the California
Environmental Quality Act (CEQA) under CEQA Guidelines Section 15061(b)(3), since
it can be "seen with certainty that there is no possibility that the activity in question may
have a significant effect on the environment". This certainty is based on Central San's
past experience with numerous sewer construction projects of this nature, the
relatively short distance involved, and Central San's impact-limiting construction
specifications that would be required of the project.
PASSED AND ADOPTED this 15th day of April 2021, by the Board of Directors of Central San
by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
Tad J. Pilecki
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 9 of 23
Page 8 of 10
Central Contra Costa Sanitary
District Resolution No. 2021-
Page 3 of 3
COUNTERSIGNED:
Katie Young
Secretary of the District
Central Contra Costa Sanitary
District County of Contra Costa,
State of California
Approved as to form:
Kenton L.Alm, Esq.
Counsel for the District
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 10 of 23
Page 9 of 10
ATTACHMENT 3
RESOLUTION NO. 2021-
RESOLUTION APPROVING BOUNDARY MAP
CORDELL DRIVE WEST CONTRACTUAL ASSESSMENT DISTRICT
NO. 2021-1
The Board of Directors (Board) of the Central Contra Costa Sanitary District (Central San)
resolves:
A map entitled "Proposed Boundaries of Cordell Drive West Contractual Assessment District
(CAD) No. 2021-1" has been filed with the Secretary of the District.
This Board approves the map and adopts the boundaries shown on the map as describing the
extent of the territory included in a proposed assessment district to be known as Cordell Drive
West CAD No. 2021-1, Central Contra Costa Sanitary District, County of Contra Costa,
California.
This Board intends to levy a contractual assessment upon participating parcels within the
described CAD in accordance with the benefit to be received by each parcel of land,
respectively, from the improvement. There shall be omitted from assessment, all public streets,
alleys, and places and all land belonging to the United States, the State of California, Contra
Costa County, and Central San because it has been determined that no special benefit will be
conferred on any such land within Central San.
This Board finds that the map is in the form and contains the matters prescribed by Section
3110 of the California Streets and Highways Code.
This Board directs the Secretary of the District to certify the adoption of this resolution on the
face of the map and to file a copy of the map with the County Recorder for placement in the
Book of Maps of Assessment and Community Facilities Districts.
PASSED AND ADOPTED this 15th day of April 2021, the Board of Directors of Central San by
the following vote:
AYES : Members:
NOES: Members
ABSENT : Members:
Tad J. Pilecki
President of the Board of Directors Central
Contra Costa Sanitary District
County of Contra Costa, State of California
March 30, 2021 Special EOPS Committee Meeting Agenda Packet- Page 11 of 23
Page 10 of 10
Central Contra Costa Sanitary District
Resolution No. 2021-
Page 2 of 2
COUNTERSIGNED:
Katie Young
Secretary of the District
Central Contra Costa Sanitary District County
of Contra Costa, State of California
Approved as to form:
Kenton L. Alm, Esq.
Counsel for the District