HomeMy WebLinkAbout04.d. Receive update on Steam and Aeration Blower Systems Renovation, DP 7349 Page 1 of 14
Item 4.d.
CENTRAL SAN
January 19, 2021
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: NITIN GOEL, SENIOR ENGINEER
REVIEWED BY: DANEA GEMMELL, PLANNING AND DEVELOPMENT DIVISION MANAGER
EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE UPDATE ON STEAM AND AERATION BLOWER SYSTEMS
RENOVATION, DISTRICT PROJECT 7349
Staff will present an update on the Steam and Aeration Systems Renovations Project.
Strategic Plan Tie-In
GOAL TWO: Environmental Stewardship
Strategy 1—Achieve 100% compliance in all regulations, Strategy 2—Anticipate and prepare for potential regulatory
changes, Strategy 4- Reduce reliance on non-renewable energy
GOAL FIVE:Infrastructure Reliability
Strategy 1—Manage assets optimally to prolong their useful life, Strategy 2—Execute long-term capital renewal and
replacement program, Strategy 3—Protect personnel and assets from threats and emergencies
GOAL SIX: Innovation and Optimization
Strategy 2—Improve and modernize operations through technology and efficiency measures
ATTACHMENTS:
1. Presentation
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 45 of 66
Page 2 of 14
STEAM AND AERATION BLOWER SYSTEMS
RENOVATION (DISTRICT PROJECT 7349) UPDATE
Engineering and Operations Committee
January 19, 2021
Jean-Marc Petit, Director of Engineering and Technical Services
Danea Gemmell, Planning and Development Division Manager
Edgar Lopez, Capital Projects Division Manager
Nitin Goel, Senior Engineer
CENTRALSAN
AGENDA
w
• Overview of Steam and Aeration
Blower Systems Renovation Project
(Steam Project)
• Steam Project Status Update l
• Business Case Evaluation (BCEs)
Overview and Preliminary List of BCEs/
Alternatives
- _ _I•r.. I to
IL
aL L.
_ •� uJ3mli��Rli3Lf� .
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 46 of 66 1
Page 3 of 14
STEAM SYSTEM IS CRITICAL FOR THE
SECONDARY PROCESS
Furnace Exhaust7, '
Waste Wet Induced
erraft
Boilers Scrubber Fan
Scrubber Water
to Primary
Steam Piping Effluent Steam
Pre-Aeration
Turbine
Cake Multiple Blowers
Hearth
Landfill gas Furnaces Electric;
(MHF) Standby
Boiler to Plant St m A/N Tanks
Power
Potable water Feeds: Facility
0. Feed MHF Boilers Mixed Liquor
Cogen Boiler Cogan
Channels
Water Aux.Boilers Electricity Meter Turbine
from Grid Turbine
Fin.I Effluent
Ash � Channel
Handling ♦♦ ►`
System Natural Gas ♦♦♦
�♦♦ Future Needs
(Nutrient
Removal)
' 3
CENTRALSAN
CENTRAL SAN SECONDARY
TREATMENT PROCESSES
f. IR
r.
������p��rr��Jt�R
}may., s (� i�rL11•F
�rn��� __.a
I�d�Pll.'1r�.n r, -r,.�l��■ all
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 47 of 66 2
Page 4 of 14
D STEAM &AERATION BLOWER SYSTEMS RENOVATIONS PROJECT ELEMENT'
1 i
• 1
_ Steam Generation
a
�'•'w_ Boiler Feed Water
i
Steam&
,¢ Condensate
Piping
e I 16� r
s
,n
r Optimize Selector New Diffusers&Piping - ^1
&Aeration Tank Rehab _ Dedicated
Aerated Grit
Re-Use Blower Building i s * m Blowers
for New Blowers? 5
SUB 52 Electrical Upgrades
0 SECONDARY TREATMENT/ELECTRICAL CONSIDERATIONS
SUB 82
Electrical Upgrades ♦'
-
kFp4.
Mixed Liquor y
Hydraulic
Splitter Box —
Rehab Clarifiers !
SUB 33&34 _ and RAS/WAS
Electrical Upgrades
u ; s
6
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 48 of 66 3
Page 5 of 14
PROJECT ELEMENTS TO BE EVALUATED
t ,
SUB 82 Contaminated Soil
Electrical Upgrades Future Nutrient Relocation
Water Exchange Future Clarifiers? Removal Tanks �- Steam
Generation
i O New Boiler Feed Water
.666. Blower
• ❑O Building? _ r Steam&
Condensate
Piping
Mixed Liquor Rehab Clarifiers
Hydraulic I'� Add
Splitter Box Generator
�+ - CEPT
SUB 33&34
Electrical Upgrades
New Diffusers&Piping
Optimize Selector &Aeration Tank Rehab
Dedicated
Aerated Grit
re-Use Blower Building t primary Expansion Blowers
r New Blowers?
SUB 52 Electrical Upgrades 7
CENTRALSAN
SCOPE AND FOCUS OF THE PROJECT
Detailed
Assessments Capacities and Alternatives Design Criteria
W- nWd �
Develop Lifecycle
Confirm -
.-r Costs for
Cost and Phasing Selection of Best Alternatives
/ 8
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 49 of 66 4
Page 6 of 14
MAJOR PROJECT DELIVERABLES
• Tech Memo 1 - Heat to Energy: Condition Assessment of Steam, Energy &
Aeration/Secondary Systems
• Tech Memo 2 - EI&C: Condition Assessment of Electrical & Instrumentation
Systems
• Tech Memo 3 - Nutrients: Design Criteria Development & Improvements to
Meet Current & Future Nutrient Regulatory Requirements
• Tech Memo 4 - BCEs: Business Case Analyses for In-Kind Replacement &
Other Alternatives, including do nothing
• Tech Memo 5 -Water Exchange: Business Case Analysis for Water
Exchange Alternatives
• Tech Memo 6 - Pre-Design Report (PDR): 10% Pre-Design Report for
selected alternative
' 9
STEAM PROJECT UPDATE By TASKS (% COMPLETE)
Tasks Condition Assessments Completed Draft Condition Assessment Reports,
01 low Updates Submitted,and Board Presentations
Comprehensive Asset Evaluation Completed Draft Comprehensive Asset Evaluation
02 90% Technical Memoranda(TMs)and held Workshops.
tOutstanding items are the Executive Summary and
1....................... .0 ate to Corrvmittee/Board
Secondary Process&Steam System Optimizations Completed Field Work/Analysis.Outstanding items
03 80% are submitting draft TMs and providing an update to
t Committee/Board
1__________________________________I
Business Case Evaluations(BCEs)and Peer Review Completed Electric Blower BCE and Developed List of
04 33%) BCEs/Alternatives.Outstanding items are BCE
t I completion and update to Committee/Board
1__________________________________I
Preliminary Design Reports(PDRs) Completed Draft PDR for Electric Blowers.
05 30% Outstanding items are PDRs developed under BCEs
and update to Committee/Board
1. 10
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 50 of 66 5
Page 7 of 14
STRUCTURAL ANALYSIS OF AERATION BASIN & CLARIFIERS
FINITE ELEMENT ANALYSIS MODEL: USED FOR ANALYZES AS A
PART OF TASK 1 & 2 - COMPREHENSIVE ASSET EVALUATIONS
�N
' axpanslvn Jvint
uv channel
moemcanona �`
Aeration Basin Structure Secondary Clarifier Structure FEA
Finite-Element Analysis(FEA)
CENTRALSAN
TASK 2: DRAFT STEAM SYSTEM
COMPREHENSIVE ASSET EVALUATIONS
Solids
LEGEND
Pumpingcaff"Lw 'M
FM Water
and : . - ■: :
t
Ralahle Cdd! psprKpr Water SW.MTank ,! Efs.-d CwM"w [w
____y Pe,urn__z! LlY
a
iz
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 51 of 66 6
Page 8 of 14
TASK 2: DRAFT SECONDARY COMPREHENSIVE ASSET EVALUATIONS
Asset Name Locationr}rry Y
5 -
Aeration Air Filter
s IIIIIIII r. s>«� eT+
Aeration Shakers 6 K.
Blower Inlet Guide Vanes#1 and#2 III 2111111' 5
Blower Inlet Guide Vane#3 ■
Blowers#1and#2 3A (E ■ 7Blower#3 I
Aeration Headers 4A• la; S®!®
Aeration Headers(Where it Crosses the Effl.Channel) 4JJ ■■�® 5 __fes .. 12
Aeration Piping 6
Aeration Air Control Valves -
Aeration Plenum 7
11111111 oil
Diffusers d 17 s 111119 111 1.7
1 i2
Aeration Basins 9
NorthMixed Liquor Channel 10A* �e i9 f �r T
South Mized Liquor Channel 10B"
Secondary Clarifier Basins 11 'C—In
Secondary Clarifier Mechanisms: ,-'
12
Grouped by Near-Term Replacement �- —
SecondaryClarifierMechanisms: ® LEGEND ,
Grouped by Immediate Replacement s.
Secondary Clarifier Inlet Gates(Except South Clar.#4) 1111111111 1 -{.�
Secondary Clarifier#4 Inlet Gate 15 'T8D pending i nspeclion
r
North RAS Pumps 16A
South RAS Pumps 16B
RAS Piping—General 17A
RAS Piping—Submerged in Channel
WAS Pumps and Suction Piping 18 13
WAS Piping 19
Tunnels 20CENTRALSAN
TASK 2: ELECTRICAL SYSTEM COMPREHENSIVE ASSET EVALUATION
4 R 0 -
0) _
j f��-rr�Im���y�ryr�SYlf�r6� � 1 irya� p ry
400
) •. -IlI�11/t� Yi1L'fiaol. I�� F:.�:,
CENTRALSAN
J Iffld11311�
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 52 of 66
Page 9 of 14
BIOLOGICAL PROCESS OPTIMIZATION AS A PART OF
TASK 3 - SECONDARY PROCESS & STEAM SYSTEM OPTIMIZATIONS
Wastewater Characterization The findings from these efforts have resulted
in
Essential to 1)understand overall plant performance the following:
and 2)model optimization/upgrade options ' water quality
2) Plan . ..
A/N Tank Feed Flow Split Evaluation i. Address
A computational fluid dynamics(CFD)modeling to ii. Improve the secondaryprocess(slu..-
understand the existing flow split settleability,aeration,flow split)
iii. Inefficiencies with existing diffusers
Anaerobic Selector Optimization iv. Opportunities to address conveyance
Understand how the process is behaving and bottlenecks '" '
opportunities to improve settleability
....0 Off-Gas Testing
Evaluate the oxygen transfer efficiency in the A/N tanks
Hydraulic Profile
Identification of hydraulic bottlenecks that is limiting
conveyance capacity at flows> 100 million gallons per day is
CENTRALSAN
LIST OF BCES AND ALTERNATIVES (ALL THE BCES WILL INCORPORATE
ELECTRICAL PRELIMINARY FINDINGS FROM COMPREHENSIVE ASSET EVALUATION)
1. BCE#1: Electric Blowers versus Existing Steam Blowers
(Short-Term; completed and in Design):
• Dedicated Blowers sub-BCE (as part of Blower Design)
Secondary
System
2. BCE#2: Aeration Basin Diffusers:
• Alt #2A: Business As Usual (BAU)
• Alt #213: New Diffusers (Plenums under Investigation;
Water Exchange under Consideration) Steam Electrical
System System
3. BCE#3: Secondary Process Improvements:
• Alt #3A: BAU
• Alt #3B: BAU + Improvements (includes pending
Diffusers/Plenums BCE#2)
• Alt #3C: Water Exchange + Improvements
• Alt #3D: Nutrient Reduction + Improvements 16
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 53 of 66 8
Page 10 of 14
LIST OF BCES AND ALTERNATIVES (ALL THE BCES WILL INCORPORATE
ELECTRICAL PRELIMINARY FINDINGS FROM COMPREHENSIVE ASSET EVALUATION)
4. BCE#4: Steam System (Long-Term Blower Lead; Water Exchange
and Landfill Gas Long-Term Viability under Consideration):
• Existing Steam Blowers in Lead: Secondary
➢ Alt 4A: BAU (Retain Steam Blowers; Electric Blowers as System
Back-Up)
➢ Alt 4B: BAU (Retain Steam Blowers) + Improvements
(Electric Blowers as Back-Up) 7
• New Electric Blowers in Lead (Paradigm Shift):
➢ Alt 4C: Electric Blowers + Improvements (Steam Blowers Steam Electrical
as Back-Up) System System
➢ Alts 4D/E/F: Paradigm Shift (Electricity Production; Steam
Blowers Phased Out)
0 4D: Electric Blowers + Improvements + Steam
Turbine Generator(STG)
0 4E/F: Electric Blowers + Improvements +
Expand/Replace Cogen
17
BUSINESS CASE EVALUATIONS (BCES) NW
#3 FOR SECONDARY SYSTEM
Aeration Air Filters IA
Aeration Shakers 113 ®�®'
Blower Inlet Guitle Vanes"and Q 2A
Blower Inlet GUltle Vane N3 213
Blowers#1 antl p2 3A
Blower a3 3BAlternative#3A: Business
Aeration Headers 4A TBD3
Aeration Headers 4B TBW
As Usual Aeration Piping 5
Aeration Air Control Valves 6
Aeration Plenum 7
Diffusers B
-----
Aeration Basins 9 ®i ®i � TBD3
Alternative h -----
NortMixedDquprChannel l0A ®®® TBD3
South Mixed Liquor Channel 10B ®i ®i ®i TBD3
■
Secondary Clarifier Basins 11
Secondary Clarr Mechanisms: 12 �
Secondary Alternative Grouped by Near-Term Replacement
Secondary Clarifier Mechanisms: 13Syste ®®®®
Grouped by Immediate Replacement
Exchange +
(F—pt ryCla Chri,r#4)ates 14 ®®®®
�Excepl5ou[h Clarifer k0)
Improvements 5—dary Clarifier#4lnlet Gate
-----
NorthRASPumpsAlternative#31): Nutrient Sou16
th RAS Pumps 16B
RAS Piping 177
Reduction WAS Pumps 18
WAS Piping 19EMMM
Improvements
TUnne155y— 20
UL of�20years,blue cells have an RUL of 1030 years,yellow cells have an RUL of 510 years,res cells M1ave
Lof.S ed iigoj.
rgs grapM1irzllyrprovitletl In Figure 41.
antl/or[M1e final report.For tM1e laser,zucM1 assets will be inspectetl on they are taken off-line and available for
nzpettlpn savaJable over project tluratlpni.
azedon tM1pimost vulnerable m
olocation,whichisantidpair,wM1ere the aeration header<roszez[be efRuent channel.At[his."i"m me viva is awie<tea me liRma,atmoevnen<aic aid aimow irttedaa.
antl Secondary Clariferarelimp by hytlraullc capanty iup to 100 mgtl perfM1e CompreM1ensive wastewater
e ank SurA reu will baa endedd wi-1,11— ng hytl au is an sizj. 18
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 54 of 66 9
Page 11 of 14
BUSINESS CASE EVALUATIONS (BCES) #4 FOR STEAM SYSTEM
TahW 4-1.Sioam System Comprollansiro AS sol EraPuatlon RIA Summary'
100®
Caoa.a OJ"IC.grm)SrA-9aik.
9awiv ty )N1 GIMHF]W.a[.HeM IIIII�III®®®
,4odlar 6d1Nr Nl and N2
�WIpyN Ha Wn.r Flwn Exrnvgr ����
< Alt 4A:BALI
Alt:b�iSI.ino
Blow s=
Cha.akel Feed liyoa^(Long-Term use)
Oeeefa[e15[efaye ienk ®®0'
4B:BALI+Improvements
L.mdrraM(Gets[}5[way.r-k ��® z
L.anYetoua B6waown Flats Talc ��®�
I.wxWI BN»dam Fixn imk ����
waw^ mrai andh ���
Bpd$C.-Al .0 8-k"WAO um
4C:Improvements WOO 90w Feed PiWV
W Bvaa Feat P. p P
Ele[Ule 9eaa Fee.Pump
AeW.WQ Stern T".N1 end N2
Wmd 5lwnFxchaN$F N1 ®�®�
—Alt New Electric
,� Watq S4Ma Expyrptr>? �®�
Hen R'viwM 8flta/•ExWrgre�- A�3��®�
r„edv Gyre sew cord..:..Blowers as Lead
(Long-Term use)
rdtdp.yde P1/nPNI sr1 Nx ��®�
npne e.ewrcl Cordenra,Nl a,d Nz ��®: .:�
Vaeum
H.p1r ftw
Si Separ&or Nland N2
NWS-sk Ali
cabereaee Ppkq �®®0
119
•wM=..m�..n....,Rug a,sow••.uw ow n...�Au.w+o-avrw.r.�-a..n..,...mn ds+o
BCE NON-ECONOMIC CRITERIA (BUILDS ON THE CONDITION
ASSESSMENT & COMPREHENSIVE ASSET EVALUATIONS)
1. Technology Status: Based on the number of installations globally and within
the US.
2. Safety: That point in the future (years) when safety issues preclude or
significantly inhibit the operation of the asset.
3. Operating Ease: That point in the future (years) when operating complexity
precludes or significantly inhibits the operation of the asset.
4. Maintenance, Redundancy, & Reliability: That point in the future (years) when
increasing maintenance precludes or significantly inhibits the operation of the
asset.
5. Long Term Flexibility: That point in the future (years) when improvements in
efficiency or technology would justify replacing the asset.
6. Cap and Trade: Would the alternative put Central San in a position where they
would enter Cap and Trade under Senate Bill 32 (i.e., >25,000 MT CO2/year). 21)
CENTRALSAWN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 55 of 66 10
Page 12 of 14
NEXT STEPS
.1211
BCE INCORPORATES ECONOMICS AND NON-ECONOMICS CRITERIA TO INFORM
DECISION MAKING
List of Alternatives e _r BCE BCE Incorporates Economics and Non-
Economics to Inform Decision Making
cost —Score for each Alternative
Non-EconomicsoBenefit
_ Total NPV Cost(Capital+0&M)
Economics per Alternative Benefit Score(i.e.,Non—Economics)
Key Definitions:
Business Case Evaluation(BCE)=Overall System Decision Making(e.g.,Steam System has 1 overarching BCE)
Alternative=BCE subgroups that make up the BCE
CENTRALSAN
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 56 of 66 11
Page 13 of 14
QUESTIONS?
' 23
SOLIDS TREATMENT ENERGY DISTRIBUTION
PS
Mending Ce t to MHF1
GAFU 9�
n� f,^5 lank100% WA LN101u�d WOMM 11w17 Ah m
i90 ky.19"a er
lonriNN
90 kW 150 kW i',i{I
F I O7M STl1M ZO LN61'L 30 U:tl
�ppyy E CiriCtlJ1 woBol Bolter 1vhM9Tu.b FH Boirer
1 2aln ue
5 To L14'uId Trea unerlr To ONMr SO we" 417 WO lohn
Y
.111111h. SOKCN a70 w9h,n
�i "11 W" 190 kW A x1la
a ,. ,R16 J❑ 70 M,BTIJrt1 Mara
Tota! - Torar
1 Land1771 Gas iO SRfC§u+tl 700016•1, Plan[
a nsurnptha nn�r.tilr=I�.•I
'y ABO w 10G•.o.' Steam
F24o kwmu•e
C O�:Pfl Prat On To Steam
TetatNatural a oogra, Turbine
;onsum GasTurbine
"�[A'� Aeration
sum
r leorkra nsorFx"d Blowers
1./06 Ll.1i01rt[
7,5nO kW
-Be AaA9TWd
LAmnnLt, NATURAL
SPLIE1s s POWF77 STEAMGA5 GAB
v
Flgura 7.47 Sankey Diagram of Solids Traaanent and Energy Recovery Energy Distribution
' 24
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 57 of 66 12
Page 14 of 14
LIQUID TREATMENT ENERGY DISTRIBUTION
Nvaaw pt" w T.
v Raw ��yow.ma Mlmlua ■ saw�a M.6Nk�
ievuem
T
PS WAS
saaa wauAerue says IW wa*ua
saa
Prn nmo wn
sr..n eoo wanes
a
2�w
m v
vtrwrtiun�--
r° "' fv oal.l ie awe Tv Fllrr
• Preaaraa Plee...rlg Pref
W-81- -U. foAWiu�
SOLIDS s POWER eTPAM
Figura 7.46 Sankey Diagram of Liquid Treaanent Energy Dimbutian
7
go
H
MAIN PROJECT FOCUS AREA
Head-A, Pnn'n7 Tv R-rJ g
II GU"— wW. 7v OuEaA
M to
Rees solves 020 BTiltl :2U].RA tl
mnuem
PS W
wea soo a sale. R,Iw.a.ua
dal
PIenI Y].Yeo An
Sfesm 90a L1LIaTllM
11 CCC Iefi
9.r.FM1RTI I•n
'�°�° HtlRIrM
a rf AVS
E 3Vl ene�:. FW
e l �. en lyln'��h m Tia
Pr
T°61h°r Yi..t ivuarr Ta Sellda Iv Files
�P"9ae Plxenn Pleeauila Prn
IlntHi.•f l.l...11 11•I fuUl•Mllue tm wtv
,y l,ftail le
S L[S S POWER BTF
Figure 7-46 Sankey Diagram of Liquid Treatment Energy Oiseibutian
January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 58 of 66 13