HomeMy WebLinkAbout04.b. Receive update and overview of the Capital Improvement Program (CIP) Page 1 of 19 Item 4.b. CENTRAL SAN January 19, 2021 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: JEAN-MARC PETIT DIRECTOR OF ENGINEERINGAND TECHNICAL SERVICES REVIEWED BY: ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE AND OVERVIEW OF THE CAPITAL IMPROVEMENT PROGRAM (CIP) Central San has developed a Ten-Year Capital Improvement Plan (Ten-Year CI P)for capital facilities and financing needs. The Ten-Year CI P covers the period starting July 1, 2020 and ending June 30, 2030. It incorporates the recommendations from the June 2017 Comprehensive Wastewater Master Plan (CWMP), which is updated every year. Specifically, the plan identifies and prioritizes capital projects needed to accomplish Central San's Vision, Mission, Values, and Goals. It also includes planning-level cost estimates for proposed projects and projections for the various sources of revenue needed to meet the cash flow requirements. The principal purpose of the Ten-Year Cl P is to provide the Board of Directors with the information needed to formulate a long-range policy regarding: • Priority and Schedule — Identify, prioritize, and schedule the projects necessary to accomplish Central San's Vision, Mission, Values, and Goals. • Financing — Plan for sufficient financial resources to complete the proposed projects. The CWMP is a critical tool used by staff to implement the following strategies from Central San's Strategic Plan (Fiscal Year 2020-2022): • Achieve 100 percent Compliance in all Regulations by meeting all air, water, land, and other requirements and by striving to minimize sanitary sewer overflows through the implementation of best management practices. • Reduce Reliance on Non-Renewable Energy by using sustainable practices that minimize waste, maximize resources, and improve the community. • Manage Assets Optimally to Prolong Their Useful Life by facilitating long-term capital renewal and replacement and by protecting Central San personnel and assets from threats and emergencies. • Improve and Modernize Operations through Technology and Efficiency Measures by streamlining workflows, leveraging data, and encouraging the review and pilot testing of new technology to optimize the way Central San works. Some of the potential future projects identified in the CWMP are not currently included in the Ten-Year CI P, but are included as projects and clarified during the annual update. These future projects are not included in the Ten-Year CI P and amount to approximately$920 million, of which roughly$510 million may be within the next 20 years. January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 9 of 66 Page 2 of 19 These projects include the following: • Nutrient Removal (Nutrient Watershed Permit): Possibly within 10 years ** • Water Exchange (Refinery Recycled Water) Project- 20 million gallons per day • Advanced Treatment/Contaminants of Emerging Concern Removal ** • Renewable Energy Projects (triggered by increased power demands from nutrient removal) ** • Concord Community Reuse Project Recycled Water Facilities Improvements • Concord Community Reuse Project Collection System Improvements * • Concord Community Reuse Project Recycled Water Distribution System (Central San's current plan is to wholesale recycled water to Contra Costa Water District who will be in charge of the new distribution system, including storage) * * Projects expected to be cost neutral to Central San ** Projects identified but not currently required by regulations This presentation of the CI P provides a general description of the plan. As projects develop and are prioritized, they are grouped into the four programs (Treatment Plant, Collection System, General Improvements, and Recycled Water Program). In total, the estimated costs for all the projects listed in the Ten-Year Cl P is $907.5 million, as shown in the Capital I mprovement Budget (CI B). Strategic Plan re-In GOAL ONE: Customer and Community Strategy 1—Deliver high-quality customer service GOAL TWO: Environmental Stewardship Strategy 1—Achieve 100% compliance in all regulations, Strategy 2—Anticipate and prepare for potential regulatory changes, Strategy 4- Reduce reliance on non-renewable energy GOAL THREE: Fiscal Responsibility Strategy 1—Maintain financial stability and sustainability GOAL FOUR: Workforce Development Strategy 1—Proactively plan for future operational staffing needs, Strategy 4—Meet or exceed industry safety standards GOAL FIVE: Infrastructure Reliability Strategy 1—Manage assets optimally to prolong their useful life, Strategy 2—Execute long-term capital renewal and replacement program GOAL SIX: Innovation and Optimization Strategy 2—Improve and modernize operations through technology and efficiency measures ATTACHMENTS: 1. Presentation January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 10 of 66 Page 3 of 19 �r CAPITAL PROJECTS UPDATE AND OVERVIEW ENGINEERING AND OPERATIONS COMMITTEE JANUARY 99, 2029 Jean-Marc Petit, P.E. Director of Engineering and Technical Services p Pumping sFeoons [—'service area Pittsburg s.rnr srstvm —im,"wor Line Iz 24•) a aI[InB2' / Trunk Line(2 til'Q4') F—M ain ' Y Ou[fail w.- N C "�� Concord Clayton r ........�..�. riretla��— ' reek �` rr, •, : --,.;� •� _ gar �1 � i_L Z J� .cob b � f ., . Califomia ban n r' DETAIL , - AREA 2 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 11 of 66 1 Page 4 of 19 LE CIO Oakland O aamoo N - • - jCCCSDPu­1na5W1on. - � � lF'.�.ce�isaMia`v'aeNu Pumping Stations 3 CENTRAL SAN MARTINEZ PLANT SITE dta LIL January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 12 of 66 2 Page 5 of 19 TREATMENT PLANT .Yr 15 ■ ■ — woewxw�rw+ ■ti uNV Pc.r. DETAIL Aopw�ltl�hn AREA r..N I ..h.�. l I u �• ■ 000 L"— i -- ........ Goo) ;r------- ■�-�r-------- - ! ......�---' I —CEWTPAL$AN .� ' ccc so Reereba NRler srelem _ January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 13 of 66 3 Page 6 of 19 5'4 �►.� LOOKING AT THE FUTURE CENTRAL SAN IA � COMPREHENSIVE WASTEWATER MASTER PLAN - - COMPLETED 2017 - 1 THIS PROJECT COORDINATED SEVERAL MAJOR MASTER PLANNING EFFORTS Dynamic Collection Collection Treatment System Plant Master Model Plan • • Wastewater Master Plan (CWMP) - 1 8 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 14 of 66 4 Page 7 of 19 THE CWMP IS COMPREHENSIVE Reviewed Past Assessed Near- 11 Evaluated ReportsTerm&Future Process/Energy Needs Optimizations Developed New Determined Evaluated& Dynamic Regulatory Selected Hydraulic Model} Scenarios Alternatives � i J Evaluated Developed Evaluated Flows Process 20-Year Loads Cacities Comprehensive ap ,. Plan Performed Evaluated 'Prepared Condition Hydraulic Updated Assessments Capacities 10-Year CIP* *Capital Improvement Plan(CIP) /', !'' 9 THIS CWMP PROVIDES CENTRAL SAN WITH A TOOL FOR A CLEAR DIRECTION I/PF,A�Confirmmecl future CIP Projects, Estimated Costs,and Site Layouts I . O. .. nergy Clarity to Cl P Project Inter-Dependencies& Priorities ' 10 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 15 of 66 5 Page 8 of 19 CWMP MAJOR DRIVERS =0000� Descriptions 1 Aging Infrastructure Maintain performance and reliability of existing assets to ensure reliable treatment of wastewater Increase capacity and redundancy of existing facilities to 2 Capacity accommodate wastewater flows(wet weather)and loads. Projects that would be required to accommodate planned growth are not included in the CIP Reliably comply with regulatory requirements that are designed 3 Regulatory to protect human health and the environment&Plan for anticipated future regulatory requirements Minimize life-cycle costs,maximize benefits,and achieve 4 Sustainability economic stability through optimization,resiliency,resource recovery,and energy projects 1 11 CWMP EXECUTIVE SUMMARIES Public Outreach Summary Technical Executive Summary EXECUTIVE SUMMARY 77 _ Technical Executive Summary COMPREHENSIVE WASTEWATER MASTER PLAN ' 12 tJ January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 16 of 66 6 Page 9 of 19 • Comprehensive Wastewater Master Plan Share this page v � Since 1946,Central Son hos provided sole and reliable wastewater 000 CENTRAL$AN collection and treatment for residents in central Contra Costa County. Today we serve nearly half a million residents and over 3 000 '+y businesses in 145 square miles.Our servires include supplying This item appears in EXECUTIVE SUMMARY recycled water for parks and golf courses,providing holh commercial Plans&Reports W and residential recycled water pickup programs,operating a Shousehold hazardous wasle collection facility and running a _ K--.- = sophisticated water quality lahoratory.flur core mission is to protect public health and the environment,and our customers can muni on us for vital services 24 hours o day,every day. - ma fL Download Executive Summary _ B Download Technical Summary 13 COLLECTION SYSTEM MASTER PLAN FINDINGS AND RECOMMENDATIONS January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 17 of 66 Page 10 of 19 DESCRIPTION OF SEWER SYSTEM • 145 square mile service area I v • Large collection system • Over 1,540 miles of gravity sewers • 37,000 pipe segments Asset Value=>$2.9 Billion • 31,000 manholes Pla • Pipe Diameters: 4" — 102" $8261M • Oldest Pipe: 1913 (107 years old) Clay $888 M • Pipe Materials: Concrete, Clay, Plastic, and Metal Metallic � Concrete • 18 Pumping Stations $162 M, 974M Million(M) GEOGRAPHIC INFORMATION SYSTEM (GIS) CENTRIC ASSET MANAGEMENT ECOSYSTEM Infovillor;KM . - Cityworks- DYNAC° Hydraulic Capacity Rlsk Model Asset Maintenance NW System Imt l Model Prioritized Upital Plan Management I I ArcG15 �~• Oes IsEnterprise Data Automation Geodatabases and Map Services •le0uac�uleawxwp ——— CCN Inspection/ Geocortex' Condition Assessment Mdob. Web Mapping Applications ColdFusion „71 I ma^ae.mem tool -d uze I Spare Parts DIGSMART Management Tool Document usA Locating K� Management F— Data flow • me F— Web hyperlinks January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 18 of 66 8 Page 11 of 19 COLLECTION SYSTEM HYDRAULIC CAPACITY MODELING Innovyze° InfoWorks ICM° SE with ArcG IS Uses GIS collection system piping .. Q network data and land use data -� Supports the Comprehensive �-- Wastewater Master Plan _ Evaluate needs by new and future developments ` 1 17 RISK ASSESSMENT AND CAPITAL PLANNING Innovyze° InfoMaster° Consumes data from various sources GIS asset data (including condition assessments) Cityworks maintenance history InfoWorks hydraulic model Other GIS reference data (soil types, nearby facilities) Calculates Business Risk Exposure for assets When will assets need to be replaced? How much will replacement cost? - / 18 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 19 of 66 9 Page 12 of 19 CALCULATING RISK FOR COLLECTION SYSTEM ASSETS --I r_ — -444 k — Probability Consequence (rBusine:W7is ) of Failure of Failure Exposure LL— _�A L�_ �A • • High Velocities Capacity Bottlenecks Blockages/Overflows Risk Class Example Capital Action _ Age _ Hospitals,Schools,Etc. :Age •Industry r High Standard Priority in CIP/Biannual Soil Type Population Density Operational Frequency •Railroads/Fault Lines •Street Paving Medium Low Priority in CIP/1 in 5 Years Operational Frequency Pipe Failure History Traffic Disruption • •Community Relations Low 1 in 10 Years Operational Frequency Repairs/Lining Negligible Wait for a problem to arise •Various techniques •Proximityto creeks and water bodies 19 RISK-BASED, LONG-TERM COLLECTION SYSTEM CAPITAL IMPROVEMENT PRIORITIZATION a Period Cost SM) Mileage 5-10 years $180 42 1020 Years $441 184 2o30Years $724 281 _ - ''r----`^ 3050 Years $1,156 403 50-75Years $575 206 75300 Years $808 276 J- L Alt:' .� 20 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 20 of 66 10 Page 13 of 19 100-YEAR SEWER REHABILITATION AND REPLACEMENT FORECAST Period Cost($M) Mileage 0-5 Years $99 38 5-10 Years $180 42 80,000,000 10-20 Years $441 184 70,000,000 20-30 Years $724 281 60,000,000 30-50 Years $1,156 403 t: 50,000,000 50-75 Years $575 206 i 40,000,000 75-100 Years $808 276 'o. pj 30,000,000 20,000,000 III I�IIIIIIIIIIIIII�WV_ 10,000,000 m .i a 000000 . . . . . . 0offiffiffiffiSSSffiffiffiffiffigffi � N � ti � � rvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrvrv � Forecast Year 1 21 SEWER REPLACEMENT AND REHABILITATION PROGRAM OVERVIEW System is Aging - I Optimized Pipe Conditions - Rehabilitation & Ran a from Good to — J�-'�� Replacement Forecast g ; Very Bad Condition Forecasted CIP: • 64%of pipes are r .=` — —$99M in 5 years <50 years old " — —$720M in 20 years CCTV'd 90%of pipes: ` `' Forecast will be • 2%-"Very Bad" updated routinely for Developed Data - CIP updates Supported Risk Model InfoMaster®to i Confirm Sewer Needs • Uses ESRI backbone a� Uses LOF and COF to ,R,, calculate risk LOF based on Central San CCTV and cleaning data / 22 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 21 of 66 11 Page 14 of 19 WASTEWATER TREATMENT PLANT MASTER PLAN FINDINGS AND RECOMMENDATIONS y - 23 OVERVIEW OF WASTEWATER TREATMENT PLANT CWMP IDENTIFIED NEEDS ��� rw.e�r�[in.e k:a+rcr �.�. .: wnrem Fe�rorel R/emnConpfeeca oppunn+.r. �[.. w xntum. f+� � ,y,� wi�a�yr vnpgardrrr U.Wrg Lio .. �' .i+. ezkncen -NI}rbn■ ouiva � H & Gis [YiMfa �, 1 .�yr� '—'Fefebi4'�a 1M�Y�gr F"=Gum wr n:.1.aeAgrq eba Ag�,o aro av 1 24 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 22 of 66 12 Page 15 of 19 TREATMENT PLANT PROJECTS OVERVIEW v.� O,a.aa nRrra,aae. 6s� t o a ■ k - � r 25 MAJOR TREATMENT PLANT PROJECTS OVERVIEW BY PHASE AND DRIVERS Q. ■tNe,.vnasa.engeup�ee. �i Qp. Pu syet�+euovew�vmae,enax Q ..P,rrP>}lrper9yWy$egmpuPP� , >' ,. >rvnn»nt[,pnuw«,tra� p. s.awMs lgFW[ietkaym.Ptgp.$ , >' 3....apWORteM�Oh BMtppewe 1�M •„A�w Pi.m S�ecgn F,w�zd v�p.o,w�r+e t >' 3a pmrpl bpiooR+nra•Pryyy 7me 1 • hMNwueldd caw+r Avw.=+yaw (DW l • iPShcer E.r�ro.+w�re•Pnemcsm tl 1 • Plwt Cw,d syaan W RPpeDF,n.e Gwo annaxw�es:��aw.R.�o.,..t R�oy.m • •EWpmre R,ply pQ[,�IyJG,a• •Pp+w en.Frn,ou lwO.RNuh , • asRPft W..DO—. am,dRai • ppFl-CtedS,—FZ,ku4 U4=.n T • 0*cetdup— .MWC0.k1&,Cre1 WKWWWFIO-U , UV D.W.m uw.des ? h:r [ry.naon Fq- Q aireurnec:N-SecvmYlnp'ore— ]O 4wl-h-5wsrnc Lwo alnnev- gy ftRyl.nnyn� ... a.an s.,a,�upye / .`:otn.fovmmig a:id:n Axf [ 2 ■GW W k,W�'�+ p 00 ul$d-d lcin.roae 4 pp p .• S.cuna.r n..�.ntF p.acbwwn.na . C-dmc..v—d MA Pq.ln.s OO. WWIFSLMKMplennen •Yleir Lpere,ynaa les LL,a lriye..rn,.ea { )M •Saada eren %Faolty p'ir••�a-em-2 • i N-ft.lnprew , `• a "-d”Fadi'mpwR,r,C+•ft-3 1 • Mr+►elw.eM E�rrpr Vpq�.Ma 3• ..>t�/M a,paHn'wta 1 ....E�e,�.opeaMr ©. s.ea,e.,cta..h krpewnntc H PuntgpMe�anaBWd•y Sa.v�.a uppsks . Dui Yrpa0t 1 z • 9+otw7&,a Pa.Wbmrpi hfrawvlwre t T • NOL,erd Fynpd(Oat,1M1'AIMW,t '9'rg ON-1(0 w5 year.) t T • •uY[a.�twrp,RKNq.nnt �Ca7x�y OPhase 2f$te lGyeaa� (�i�]]• i�eehnanr W.x gCaVa wrpoWnrrae a Reg.19.y 0Ptyse)o0w20 5u:uina6iliry Years1 _..__..r; �renr.•r�en P-icnr r 105126 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 23 of 66 13 Page 16 of 19 MAJOR TREATMENT PLANT PROJECTS OVERVIEW BY PHASE AND DRIVERS CD■ . $0w'.nUwft ■ +'lC 9wgrna lgwed+a Pnwda,enax Q N�=,eb ew"F""Vppedr t s s■ :i.eLrgrit PY dugnt Q. s,A0.g BadvaeMr, Ptm+t g s ,..•.•+oarewwtr�relnwp'nXi •• •vd4wr Anna S,e[m lr[rirdw hgrOPemr+ 1 3 wwhvvMrwi Pb9f7m4 3 • hMoeri4et eea comrroPrgra,gns t � 3 • TPyyfry 6raro.ngms•FMmcem,I Q• Am[ -i PAW g • •Eadamr.p4o� Im Q• • Pq P�prp,gn g5eorn.atmn7+oE 3 s d�ern r+n.at upyede _,and Z M• • k+rp ae.6n•phWo i • WrCan[rduwa>'w•A°er.+e�dz g wfe YfWw Plow uv" m LrV GsYrfec,m V •• ■pe:nwrLxpna Fr wt oN w.r S— ■nor-ww►,[2mee,ednupTewe p N-&-w,S.—uwedea 1 • •Imeve,rve EVdrrpy LSen ue[e:len 2 N ZMR' me uagdfee 1 • iWSCendmM' PSaM Aap�.nMn 7 Cleerweillm rev mems •• wMPNd+l�c hnro5wr�rrts QQ •• Sxm6ry Treemrenr lfpelic Lrprannxnrts g �i Q3• WWTFECADAMeplennre[ eRM �an�nrnf Q�•• •s»>:rw,s+orwty�-en.»� agE,�� gr Upgre 3• •*Ti *M(.V—*nt] aCompleted or '. 0.4HYppr b 1 • }Lolly 4od RY Pubminn ongoingry • ev.tRe�ml ieaw nel,i �Rv ng ux.+wv tura Qphase L[O[asyean] l • ■w Co—I nai + ,C+Ou�ey op'""2�te 10yeer� Projects C0• roebq:Pam scaoal pow v c 0 PAgUTAM Opus WOW21, since 2017 •w"'In,°ilRy ye1� 27 RECOMMENDED CAPITAL IMPROVEMENT PLAN 2017-2037 "I RECOMMEN DEO CAPITAL IMPROVEMENT PLAN s mll.. Pr 1.im�nam Plain Hess MYINw] z.eolxarwn svAam[til9 enurnl y s.R Ir+wrtnr[ltt wtlliml y e e....� P^�......n 15•.s Mia,y .......... .. ....13 Th-- r. na Ii ee•An 11, Dorn ManxvSmr m•I•onmayea .�e.r..m.a1..,.,,.n..a.n.e... 0Tree,nxn,Pam CWlec:rrn r'valein �Rne•�IM'�L �Nnnnl imM�rnmrnt� S10.�ggAW marrn+r.•erPn•m,xuen Ew.•r•e xuea•x.r..�•,,z���.•e�x„�.,.�exn _ I 28 January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 24 of 66 14 Page 17 of 19 CAPITAL IMPROVEMENT PLAN CAPITAL IMPROVEMENT PLAN a o 08❑ �a ' 4o 10-YEnn CIP 20yr CIP�� iz9"e..em""�"'"� isan•ado o—e 29 INFRASTRUCTURE INVESTMENTS PAST 10 YEARS: Over Ten Years: $306,200,000 1"., :4s.1 e a ,.„i 96 530.8 25.9 25., I+ou wa FT]O11f11 FT 1P11-Il F'/2011-13 F1']013-1� P1`]01�-L5 FY 201x16 F1'1L11fi-1] Fl`101]-18 FT 2L118-19 FT W19-2(1 Prgnxd �9c 0y d Wain P,w— �GenerN�mp,vremm[.Prp�un �[o3K[ion 5y.lem vrp8ram —1r.at—Plan!P,olr— „ `. IFY101]-1e mr...ral.nd•r.[Wn.[ee raPenan�re.•Pre�dr,u.lr ' 30 CENTRAL SAN= —r January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 25 of 66 15 Page 18 of 19 SUBSTANTIALLY INCREASING INFRASTRUCTUREINVESTMENT ($IN MILLIONS) Prior 10 Years Next 10 Years Average of 30.6 million Average of$86.7 million $120, ono $100, mo $80 w.o $60, $40, __ Sb.e as $20, Son woe/03 FY06/09 FY09/10m0/11 FY11/12 FYIV13FY13/14 FY14/15 FYss/16 FY16/17 Fv17/18 rvWu FYWm niWa rviya FYWn nnlm rvm/a nss/m niyn rvn/m 00n1n 0ca- 1-g4- � imwmF 0cu��46 �mammnm •Average Spending Increases by 2.8 times prospectively versus prior 10 years ' 31 PROPOSED 10 YEAR CIP FISCAL YEAR (FY) 2020-21: $907.5 MILLION 3. New Total extended to FY 2029-30(Rolling 10 Years &escalated 3%) with Updated Cash Flow In million 2020 Dollars Ten Year CIP 1 2 3 4 1 5 6 7 8 9 10 FY19-20 FY20.21 FY21.22 FY22.23 FY23.24 FY24.25 FY25.26 FY26.27 FY27.28 FY28.29 FY2930 Collections tem $27.1 $40.2 $40.8 $36.0 $39.2 $35.3 $29.6 $34.8 $27.3 $27.1 $25.1 $32.3 $52.8 $57.3 $62.7 $55.3 $45.5 $37.6 $43.0 $36.7 $36.9 $3.9 $2.5 $2.1 $2.1 $2.0 $1.9 $1.8 $1.8 $1.8 $2.5 Rec c Wale, $9.1 $11.7 $11.5 $0.3 $5.3 $11.3 $13.3 $1.3 $0.3 $0.3 Cone enc $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 TOTAL FY2020-21 $88,0 $110.4 $109.5 $106.8 $100.4 $90.8 $90.1 $75.9 $68.4 $67.3 $907.5 Proposed CIP 590.0 5zsn Sne c+19/N trio/�i vzx/iz vzz/z3 vzz/ze vz�/za x19/39 cvz9/3o i F c c Oconi�ngeny Oxentletl water ■General ni�_ ..,iis ■i...� i o �.'.'.,.speem '0090-0132 CENTRALSAN January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 26 of 66 16 Page 19 of 19 Questions AW33 ; r7. January 19, 2021 EOPS Regular Committee Meeting Agenda Packet- Page 27 of 66 17