HomeMy WebLinkAbout04.b. Receive report on FY 2019-20 closeout of capital improvements projects Page 1 of 20
Item 4.b.
CENTRAL SAN
September 1, 2020
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
REVIEWED BY: PHILIP LEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
SUBJECT: RECEIVE REPORT ON FISCAL YEAR 2019-20 CLOSEOUT OF CAPITAL
IMPROVEMENT PROJECTS
Sixteen capital improvement projects were closed in Fiscal Year 2019-20. Attachment 1 lists the
expenditures and budget under-run or over-run for each project. All expenditures are based on the pre-
audit financial reports ending June 30, 2020. Attachment 2 contains a brief summary of the work
completed under each project. For project budget details, please reference the information provided
under the Financial Statements.
Strategic Plan Tie-In
GOAL ONE: Customer and Community
Strategy 2—Maintain a positive reputation
GOAL TWO: Environmental Stewardship
Strategy 1—Achieve 100% compliance in all regulations
GOAL THREE: Fiscal Responsibility
Strategy 1—Maintain financial stability and sustainability
GOAL FOUR: Workforce Development
Strategy 4—Meet or exceed industry safety standards
GOAL FIVE:Infrastructure Reliability
Strategy 1—Manage assets optimally to prolong their useful life, Strategy 2—Execute long-term capital renewal and
replacement program, Strategy 3—Protect personnel and assets from threats and emergencies
ATTACHMENTS:
1. Expenditure Summary
2. Project Descriptions
3. Presentation
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 19 of 40
Page 2 of 20
Attachment 1
Expenditure Summary
Fiscal Year 2019-20 Closed Projects
TREATMENT PLANT PROGRAM
DISTRICT AUTHORIZED EXPENDITURES UNDERRUN
PROJECT PROJECT TITLE BUDGET AS OF 6/30/20OVERRUN
NO. 6/30/20 (OVERRUN)
7292 Switchgear Refurbishment- Phase 2 $ 884,548 $ 697,256 $ 187,292
7320 Plant Energy Optimization 1,094,000 1,004,919 89,081
7326 Equipment Replacement 1,629,000 1,642,109 (13,109)
7327 Headworks Screening Upgrade 8,305,000 8,415,231 (110,231)
7330 Piping Renovations- Phase 9 3,180,000 3,153,125 26,875
7358 Bioenergy Public-Private Partnership Project 300,000 271,217 28,783
7359 Solids Conditioning Building Roof Replacement 1,300,000 1,195,704 104,296
Program Totals $16,692,548 $16,379,561 $312,987
COLLECTION SYSTEM PROGRAM
DISTRICT
PROJECT PROJECT TITLE AUTHORIZED EXPENDITURES UNDERRUN
No. BUDGET AS OF 6/30/20 (OVERRUN)
6602 South Jackson Contractual Assessment District $ 411,290 $ 406,481 $ 4,809
6603 North Jackson Contractual Assessment District 276,557 237,622 38,935
8441 Cured-in-Place Pipe Contract 2017-2020 600,000 281,214 318,786
8446 Lafayette Sewer Renovations- Phase 12 4,033,600 4,028,963 4,637
8452 Lafayette Sewer Renovations- Phase 13 4,317,000 4,288,123 28,877
8454 South Orinda Sewer Renovations- Phase 7 4,137,000 4,123,862 13,138
8455 Walnut Creek Sewer Renovations- Phase 13 4,121,000 4,064,860 56,140
Program Totals $17,896,447 $17,431,125 $465,322
GENERAL IMPROVEMENTS PROGRAM
DISTRICT
PROJECT PROJECT TITLE AUTHORIZED EXPENDITURES UNDERRUN
No. BUDGET AS OF 6/30/20 (OVERRUN)
8249 Collection System Operations Dump Pad $60,000 $59,352 $648
RECYCLED WATER PROGRAM
DISTRICT AUTHORIZED EXPENDITURES UNDERRUN
PROJECT PROJECT TITLE BUDGET AS OF 6/30/20OVERRUN
NO. 6/30/20 (OVERRUN)
7346 Recycled Water Surge Analysis $205,000 $159,525 $45,475
TOTAL EXPENDITURES $34,853,995 $34,029,563 $824,432
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 20 of 40
Page 3 of 20
Attachment 2
Project Descriptions
Fiscal Year 2019-20 Closeouts
TREATMENT PLANT PROGRAM
Project No. Project Title
7292 Switchgear Refurbishment - Phase 2
This project is part of a multi-year program to repair and replace treatment plant electrical
switchgear equipment including a total of 66 480 volt (V) circuit breakers over a five-year period;
replaced 2400V circuit breakers and air breakers at key substations, such as Substations 52 and
82; and replaced the protective relays for various switchgear. Future replacement will be
performed under the Plant Electrical Replacement and Rehabilitation project.
7320 Plant Energy Optimization
The purpose of this project was to increase energy efficiency, reduce utility costs, and decrease
carbon monoxide (CO) emissions at the treatment plant. There has been a significant increase in
Pacific Gas & Electric Company costs due to CO emission limits imposed by the Bay Area Air
Quality Management District on the cogeneration system (Cogen). Based on past utility bills, the
yearly import increase was approximately $300,000. This project reduced CO emissions by
installing an oxidation catalyst and increased Cogen's energy efficiency during hot weather
months by adding an evaporative cooling system. These improvements have helped ensure
regulatory compliance and reduced electrical costs.
7326 Equipment Replacement
In coordination with the Asset Management Program, the Equipment Replacement project was
part of a multi-year program to repair equipment throughout the treatment plant that reached the
end of its useful life or required replacement or upgrade for various reasons. This project updated
necessary critical equipment, such as pumps and impellers, various steam system and air
conditioning components, small pump systems and generators, as well as other miscellaneous
and essential support equipment.
7327 Headworks Screening Upgrade
The Headworks separates and removes screenings (debris) and plastics from incoming
wastewater. This important project improved the debris removal system in a strategic and cost-
effective manner. These improvements included installation of four new fine multi-rake bar
screens to replace the climber screens and grinders, a new screenings conveyance sluiceway,
washer compactors, improved odor control, and an enhanced screenings disposal facility.
Additionally, two of the existing climber screens and grinders were rebuilt and reinstalled in the
Headworks wet weather channels for more operational reliability and process redundancy.
7330 Piping Renovations - Phase 9
The treatment plant has numerous piping systems throughout the site that convey wastewater,
sludge, steam, air, and other utility services. The purpose of this project was to rehabilitate or
replace piping that had been in operation for over four decades that were leaking or showing
wear due to corrosion or other unseen factors. The work included, but was not limited to,
replacement, renovation, and improvement of various mechanical, piping, instrumentation, and
electrical systems throughout the treatment plant. It also included improvements to the treatment
plant's domestic water system with the replacement of an air gap tank and enhancements to
increase security and reliability.
Page 1 of 3
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 21 of 40
Page 4 of 20
Attachment 2
Project Description
Fiscal Year 2019-20 Closeouts
7358 Bioenergy Public-Private Partnership (P3) Project
As part of the Comprehensive Wastewater Master Plan completed in 2017, and the early
development of the Solids Handling Facility Improvements Project (Solids Project), Central San
initiated this project to determine if an alternative solution could be found to process solids at the
treatment plant. These alternatives included digestion, gasification, and other processes. This
critical project confirmed the design outcome of the Solids Project and provided valuable
information that will be useful in the future. The HYPOWERS (Hydrothermal Processing of
Wastewater Solids) pilot will continue under a separate effort or project.
7359 Solids Conditioning Building (SCB) Roof Replacement
Over the last several years, the SCB roof, originally constructed in the 1970s, started to
experience significant leakage. Some leakage was over critical electrical equipment which, if
failed, could have resulted in significant operational disruption and safety hazards. Although many
repairs were made over the years, the roof was in poor condition and replacement was required.
This project replaced the original tar and gravel roof with a membrane roof system, as well as
flashing and sheet metal, installed new roof drains and piping, fall protection, and removed
decommissioned exhaust stacks.
COLLECTION SYSTEM PROGRAM
Project No. Project Title
6602 South Jackson Contractual Assessment District (CAD)
The purpose of the CAD projects is to provide a financing mechanism for the extension of public
sewers into areas that had been served by septic tanks, which are cost neutral projects offset and
paid for by the CAD participants. This background is for the South and North Jackson CAD
projects completed this fiscal year. The South Jackson CAD, located in unincorporated Alamo,
installed approximately 1,200 feet of 8-inch sewer and infrastructure to serve 22 properties.
6603 North Jackson CAD
This project, also located in unincorporated Alamo, installed 1,150 feet of 8-inch sewer and
infrastructure to serve 14 properties.
8441 Cured-in-Place Pipe (CIPP) Contract 2017-2020
This construction contract provided a cost-effective and expedient method over a two-year term
to rehabilitate critical sewers within public rights-of way or easements using CIPP technology.
The base of this project included ten sites and approximately 2,600 feet of sewer main, with the
balance of the contract used for as-needed sewer rehabilitation in areas that posed a structural
pipe failure, an imminent threat of pipe break or collapse, or a potential sewer system overflow as
determined by staff.
8446 Lafayette Sewer Renovations - Phase 12
The Lafayette Sewer Renovations - Phase 12, and those subsequently listed below, are part of
the ongoing sewer renovations within the Collection System Program. The project replaced 8,800
feet of sewer pipe, installed 24 new manholes and modified 11 existing manholes. Most of the
project was located within the City of Lafayette, but also included several sites in the Town of
Moraga.
Page 2 of 3
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 22 of 40
Page 5 of 20
Attachment 2
Project Description
Fiscal Year 2019-20 Closeouts
8452 Lafayette Sewer Renovations - Phase 13
The Lafayette Sewer Renovations - Phase 13 replaced an additional 11,230 feet of sewer pipe
within the City of Lafayette and several sites in the Town of Moraga using various methods. The
project also included the installation of 27 new manholes and modified 30 existing manholes. Of
the total replacement lineage, 4,000 feet was replaced by the CIPP method.
8454 South Orinda Sewer Renovations - Phase 7
This project replaced or rehabilitated 9,330 feet of sewer mains, of which 6,000 feet was in
relation to and coordination with the City of Orinda's paving program. The work also included the
installation of 26 new manholes and modified 29 existing manholes and replaced one creek
crossing. The project covered various neighborhoods throughout the city in the vicinity south of
Highway 24.
8455 Walnut Creek Sewer Renovations - Phase 13
This project replaced or rehabilitated 8,660 feet of sewer mains, constructed manholes and other
related work within public rights-of-way and easements, installed 36 new manholes, and modified
19 existing manholes. Most of the work in this phase was in the Walnut Knolls neighborhood
within the unincorporated area of Walnut Creek and at several sites within the city limit.
GENERAL IMPROVEMENTS PROGRAM
Project No. Project Title
8249 Collection System Operations (CSO) Dump Pad
The original CSO dump pad sloped towards the front of the truck, which was inefficient in
unloading trucks and posed a safety risk. This project reconfigured the area for efficiency and
safety by demolishing and regrading the previous site, then installed new concrete and improved
drainage in the area.
RECYCLED WATER PROGRAM
Project No. Project Title
7346 Recycled Water (ReW) Surge Analysis
The purpose of this project was to conduct pressure transient and surge analyses of the ReW
distribution system during different operating conditions and to update the ReW distribution
model. This project evaluated the size and optimization of the surge tank, pumps, and distribution
system. It provided the opportunity to monitor and assess pressure in the distribution system,
evaluate management of pressure transients, and update software modeling of the system.
Page 3 of 3
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 23 of 40
Page 6 of 20
Attachment 3
FISCAL YEAR 2019-20
CLOSED CAPITAL PROJECTS
Engineering and Operations Committee Meeting
September 1, 2020
Edgar J. Lopez, PE
Capital Projects Division Manager
TOTAL EXPENDITURES
BY CAPITAL PROGRAM
Program Program Underrun
Expenditures (Overrun)
Treatment Plant $16,379,561 $312,987
Collection System $17,431,125 $465,322
General Improvements $59,352 $648
Recycled Water $159,525 $45,475
Total Expenditures: $34,029,563 $824,432
CE RAL SAN
� Z
1
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 24 of 40
Page 7 of 20
TREATMENT PLANT PROGRAM
CLOSED PROJECTS > $1 MILLION
Project Project Title Expenditures
Number
7320 Plant Energy Optimization $1,004,919
7326 Equipment Replacement $1,642,109
7327 Headworks Screening Upgrade $8,415,231
7330 Piping Renovations-Phase 9 $3,153,125
7359 Solids Conditioning Building (SCB) Roof $1,195,704
Replacement
CENTRALSAN
` 3
PLANT ENERGY OPTIMIZATION,
DISTRICT PROJECT (DP) 7320
Purpose:
• Increase energy efficiency, on-site energy
production, and decrease greenhouse gas emissions
for the cogeneration (Cogen) system at the treatment
plant
Major Work Completed:
• Installed a carbon monoxide (CO) catalyst
• Installed an evaporative cooler system to the intake
of Cogen for increased power production
• Replaced the reverse osmosis water system and
upgraded controls
CENTRALSAN--
2
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 25 of 40
Page 8 of 20
PLANT ENERGY OPTIMIZATION, DP 7320
New CO Catalyst `
5
CENTRALSAN
EQUIPMENT REPLACEMENT, DP 7326
Purpose:
• Replace major and minor process equipment and
related systems throughout the treatment plant in
coordination with the Asset Management Program
Work Completed:
• Replaced process pumps
• Replaced steam system equipment and components
• Replaced valves and other mechanical items
• Replaced instrumentation and equipment controls
6
CENTRALSAN
3
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 26 of 40
Page 9 of 20
EQUIPMENT REPLACEMENT, DP 7326
Replaced 3-Water Replacing Gate
Pumps and Motors Actuator
CENTRALSAN
HEADWORKS SCREENING UPGRADE,
DP 7327
Purpose:
To separate and remove screening materials and
plastics from the influent wastewater
Major Work Completed:
Replaced four climber screens with fine multi-rake
bar screens
Installed new washer compactors, sluiceway, and
screenings handling facility
Improved odor control for screens and new facility
Repurposed two of the existing climber screens for
redundancy and emergency operations
4
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 27 of 40
Page 10 of 20
HEADWORKS SCREENING UPGRADE,
DP 7327
Screening Materials
Unloaded to Bins
f
CENTRALSAN
9
PIPING RENOVATIONS - PHASE 9, DP 7330
Purpose:
Inspect, rehabilitate, or replace piping and related
mechanical systems at the treatment plant
Work Completed:
New potable water system upgrades and backflow
prevention, includes air gap tank and piping
Replaced the SCB earthquake valve and bypass piping
Other miscellaneous process piping, instrumentation
6 and associated valves and systems
5
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 28 of 40
Page 11 of 20
PIPING RENOVATIONS - PHASE 9, DP 7330
i�
e ,
� Y
New Potable Water Tank for
5019 Imhoff Place Campus
New SCB Earthquake Valve
CENTRALSAN
SCB ROOF REPLACEMENT, DP 7359
Purpose:
• Replace the SCB roof, which has exceeded its
useful life
Work Completed:
• Replaced the existing tar and gravel roof system with
a membrane system compatible and built for
industrial facilities
• Removed existing and abandoned roof stacks and
roof penetrations
• Installed fall protection and replaced deteriorated
mechanical and electrical items on the roof
,2
CENTRALSAN
6
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 29 of 40
Page 12 of 20
SCB ROOF REPLACEMENT,
DP 7359
Before After
` 13
CENTRALSAN
COLLECTION SYSTEM PROGRAM
CLOSED PROJECTS > $1 MILLION
Project Project Title Expenditures
Number
8446 Lafayette Sewer Renovations-Phase 12 $4,028,963
8452 Lafayette Sewer Renovations-Phase 13 $4,288,123
8454 South Orinda Sewer Renovations-Phase 7 $4,123,862
8455 Walnut Creek Sewer Renovations- Phase 13 $4,064,860
14
CENTRALSAN
7
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 30 of 40
Page 13 of 20
LAFAYETTE SEWER RENOVATIONS -
PHASE 12, DP 8446
Purpose:
• Replace/renovate deteriorating and high maintenance
sewers that have reached the end of their useful life
Work Completed:
• Installed/replaced a total of 8,800 feet of sewer mains
by open-cut, pipe-bursting, sliplining, horizontal
directional drilling, and cured-in-place pipe (CIPP)
methods
• Installed 24 new manholes and modified 11 existing
manholes
• Replaced collapsed PE slipline inside 30-inch steel
pipeline with new HDPE on St. Mary's Road
PE=Polyethylene Pipe HDPE=High-Density Polyethylene Pipe AO ,
CENTRALSAN
Open Cut
►rase��:se -,
5
yl
116
CENTRALSAN
8
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 31 of 40
p �
�` 811 x118,'EA 43
NONE
��=CD
CENTRALSAN
Removing
Collapsed
Liner
' New . -
to O • PE Liner
^r
S �
CENTRALSAN
•
-• •- 1 1
0 *W67 MOM MKO; .•- • R1
Page 15 of 20
LAFAYETTE SEWER RENOVATIONS -
PHASE 13, DP 8452
Purpose:
• Replace/renovate deteriorating and high maintenance
sewers that have reached the end of their useful life
Work Completed:
• Installed/replaced a total of 11,230 feet of sewer
mains by open-cut, CIPP, and pipe-bursting methods
• Installed 27 new manholes and modified 30 existing
manholes
• Located in easements and public rights-of-way
' 19
CENTRAL SAN
- - --
_ 1
R
Pipe Bursting
� ■ri
CENTRAL SAN
f 20
10
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 33 of 40
Page 16 of 20
Easement Work
7 1
` 21
CENTRALSAN
SOUTH ORINDA SEWER RENOVATIONS -
PHASE 7, DP 8454
Purpose:
• Replace/renovate deteriorating and high maintenance
sewers that have reached the end of their useful life
Work Completed:
• Installed/replaced a total of 9,330 feet of sewer mains
by open-cut, CIPP, and pipe-bursting methods
• Installed 26 new manholes and modified 29 existing
manholes
• Replaced one creek crossing
• Located in easements and public rights-of-way
22
CENTRALSAN
11
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 34 of 40
:ve6 Tine 15v 15 Pf,xn
a n,7si 5—.IN d4�.'
pr
CENTRALSAN
r
M
' . ..
1
�3
r
'rr
S
CENTRALSAN
Page 18 of 20
Open Cut in Street -
Amm
Open Cut in
Easement
AftJ21
CENTRALSAN
WALNUT CREEK SEWER RENOVATIONS -
PHASE 13, DP 8455
Purpose:
• Replace/renovate deteriorating and high maintenance
sewers that have reached the end of their useful life
Work Completed:
• Installed/replaced a total of 8,660 feet of sewer mains
by open-cut, CIPP, and pipe-bursting methods
• Installed 36 new manholes and modified 19 existing
manholes
• Located in easements and public rights-of-way
26
CENTRALSAN
-a --
13
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 36 of 40
g f
x
00.
• it
CENTRALSAN
FAKSM
CENTRALSAN
-• •- 1 1 •' -• • • �•- •. .•- • it
Page 20 of 20
GENERAL IMPROVEMENTS AND
RECYCLED WATER PROGRAMS
CLOSED PROJECTS > $1 MILLION
• No applicable projects to report for these two
programs
F29
CENTRALSAN
QUESTIONS?
30
CENTRALSAN
-a --
15
September 1, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 38 of 40